Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

CPIM-ECO PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CPIM-ECO PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Execution and Control of Operations
  • Last Update: Apr 27, 2024
  • Questions and Answers: 105
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CPIM-ECO Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CPIM-ECO Practice Exam Questions with Answers Execution and Control of Operations Certification

Question # 6

One of the main benefits of the A3 problem solving method is:

A.

coaching.

B.

a statistical approach.

C.

a kaizen event.

D.

voice-of-the-customer data.

Full Access
Question # 7

Which item is a role of the six sigma champion?

A.

Acting as an internal six sigma consultant

B.

Removing barriers the teams eccounter

C.

Providing technical support and mentoring

D.

Identifying possible causes of the problem

Full Access
Question # 8

If actual demand is consistently slightly lower than planned demand, which of the following outcomes most likely will occur when a firm produces to stock using a functional layout?

A.

Production efficiency will decrease.

B.

Customer service will decrease.

C.

Backlog will increase.

D.

Quality levels will increase.

Full Access
Question # 9

Which of the following statements about the MRP due date for a shop order is true?

A.

It is the same as operation priority.

B.

It is used in deriving operation priority.

C.

It is established at order release time and frozen until order completion.

D.

It is equal to the due date plus 5 "M" days.

Full Access
Question # 10

The actual output of a work center for a given time period can be determined by evaluating the:

A.

number of standard hours in the queue.

B.

number of standard hours per units produced.

C.

number of machine hours.

D.

amount of rated capacity less rework.

Full Access
Question # 11

Small-group improvement activities are most effective when the:

A.

group is guided by a professional facilitator.

B.

group focuses on solvable problems.

C.

machine operators are required to participate.

D.

company's industrial engineers participate.

Full Access
Question # 12

Manufactured parts are being assembled on a production line at a constant rate when a faulty component is identified. An assembly worker pushes the line stop button and work ceases while the defect is reviewed. This action is an example of:

A.

heijinka.

B.

andon.

C.

jidoka.

D.

kaizen.

Full Access
Question # 13

An immediate benefit of implementing lean manufacturing is improvement in:

A.

employee development.

B.

inventory valuation.

C.

total quality.

D.

lead time.

Full Access
Question # 14

Which of the following outcomes are objectives of statistical process control?

A.

To reduce product returns

B.

To stabilize a process

C.

To verify a DMAIC project

D.

To identify control limits

Full Access
Question # 15

The best way to determine feasibility of the capacity plan for a work center is to use:

A.

input/output control.

B.

priority sequencing rules.

C.

order management processing.

D.

rough-cut capacity planning.