Winter Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

CQE PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CQE PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Certified Quality EngineerExam
  • Last Update: Feb 11, 2025
  • Questions and Answers: 175
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CQE Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CQE Practice Exam Questions with Answers Certified Quality EngineerExam Certification

Question # 6

The authority for a customer to perform audits at a supplier's facility can usually be found in the customer's

A.

quality management system documents

B.

contracts or purchasing agreements

C.

certificate of conformance

D.

auditor training records

Full Access
Question # 7

The purpose of the opening meeting for an audit is to

A.

establish the authority of the lead auditor and audit team over the auditees

B.

determine approximately how much time and what resources will be required to conduct the audit

C.

conduct introductions, review the audit's scope and procedures, and clarify details of the audit plan

D.

present the audit team's initial observations regarding the effectiveness of the auditee's quality system

Full Access
Question # 8

The primary benefit of implementing a supplier rating system for an organization is to

A.

ensure reduction in the supplier's process variability

B.

help the organization identify supplier’s areas competencies and weaknesses

C.

measure the supplier's timeliness and delivery

D.

guarantee an improvement in the supplier audit

Full Access
Question # 9

Short-run SPC should be used in which of the following situations?

A.

The coded data being used do not show significant shifts in the process.

B.

Regular SPC charts show the process to be out of control.

C.

Many different parts are made in small lots.

D.

The number of charts currently used needs to be increased to control the process better.

Full Access
Question # 10

Which of the following results is an advantage of a ship-to-stock program?

A.

It replaces scheduled audits with incoming inspection.

B.

It reduces shipping costs.

C.

It reduces dock-to-line time.

D.

It reduces the need for purchaser supplier interaction.

Full Access
Question # 11

A way to convince management that a quality improvement program is needed is to present

A.

the number of audit findings the company received from the last audit

B.

the company's performance in terms of quality in comparison with its competitors

C.

die size of the problem in terms of the potential savings and increased profit that can result from fixing it

D.

data on how employees will produce better quality product and services if their pay is increased and their benefits improved

Full Access
Question # 12

Which of the following assumptions is a robustness factor suitable for validating statistical conclusions?

A.

Low reliability of measures

B.

High statistical power

C.

Low reliability of treatment

D.

Violated expectations of test

Full Access
Question # 13

A company is designing a production process for a new consumer product. To ensure that the product will be traceable from design and production through end-user receipt and use. the company must develop a system for product

A.

review

B.

packaging

C.

identification

D.

storage

Full Access
Question # 14

In a value stream analysis, inspection is typically classified as

A.

real value added

B.

organizational value added

C.

non-value added

D.

customer value added

Full Access
Question # 15

The limits of a pre-control chart are based on

A.

specifications

B.

natural tolerance

C.

process standard deviation

D.

process capability

Full Access
Question # 16

As a commonly used problem solving technique, which of the following would be the BEST application of a Pareto chart?

?. To determine when to make proactive adjustments to a process.

?. To differentiate between major and minor problem areas.

?. To gather data and to design experimental controlled changes.

?. To evaluate the results of other problem solving techniques upon the product or service.

A.

I and II only

B.

II and III only

C.

II and IV only

D.

I, II, III and IV

Full Access
Question # 17

Statistical process control was originated by

A.

Deming

B.

Feigenbaum

C.

Jurau

D.

Shewhart

Full Access
Question # 18

A company has received many customer complaints due to damaged units being received at the customer's distribution center. After a thorough investigation, it is determined that the units' packaging is insufficient. The company decides that a potential solution is to add reinforcements to the unit packaging to resolve the issue. Which of the following actions is most appropriate?

A.

Implement the solution

B.

Pilot the solution

C.

Outsource packaging testing

D.

Consider implementing the solution on similar products

Full Access
Question # 19

After attempting to prevent or control risk, which of the following types of risk will remain?

A.

Inherent

B.

Residual

C.

Control

D.

Credit

Full Access
Question # 20

According to ANSI ASQ Z1.4. switching from tightened inspection to normal inspection can occur when how many consecutive lots have been accepted?

A.

Four out of five

B.

Five out of five

C.

Eight out of ten

D.

Nine out of ten

Full Access
Question # 21

A facilitator asks each team member in turn to suggest one idea during a brainstorming session. This is an appropriate method to use when

A.

senior managers are present

B.

team members have been sitting for an extended time period

C.

tight deadlines need to be met

D.

dominant members are stifling others

Full Access
Question # 22

If the probability of two cars starting on a cold morning is 0.6 for each car. what is the probability of at least one of the cars starting?

A.

0.16

B.

0.24

C.

0.36

D.

0.84

Full Access
Question # 23

Which of the following quantitative methods does NOT apply to the assessment of actual system/component reliability?

A.

Statistical analysis of field test and failure data.

B.

Statistical allocation of reliability goals.

C.

Evaluation of laboratory test data.

D.

Analysis of results of reliability demonstration tests.

Full Access
Question # 24

Which of the following symbols represents process performance index?

A.

CP

B.

Cpk

C.

ppk

D.

P

Full Access
Question # 25

Temperature measured in degrees centigrade is an example of what type of measurement scale?

A.

Ratio

B.

Nominal

C.

Ordinal

D.

Interval

Full Access
Question # 26

The number of runs required by a full-factorial design with three factors each at two levels is equal to

A.

6

B.

8

C.

9

D.

12

Full Access
Question # 27

Under a defect classification system, a nonconformance that could cause a product's usability to be substantially reduced would be classified as

A.

acceptable

B.

minor

C.

major

D.

critical

Full Access
Question # 28

A process that is in statistical control has the following characteristics.

X 122

J? = 2! n = 5

What are the upper and lower control limits for the A'chart of this process?

A.

UCL = 12.72. LCL = 11.68

B.

UCL 13.25.LCL 11.15

C.

UCL = 13.41. LCL = 10.99

D.

UCL - 14.30.LCL 10.10

Full Access
Question # 29

A customer rates its suppliers for which of the following reasons?

A.

To negotiate the lower cost of a purchased good

B.

To compare multiple sources of the same item

C.

To eliminate incoming inspection

D.

To increase inventory levels

Full Access
Question # 30

Given a sample mean. X = 515. a sample standard deviation, s = 9. and a sample size, n = 6. what is the absolute value of the Student's t statistic to test if the sample mean is equal to the population mean, U = 500?

A.

1.67

B.

3.73

C.

4.08

D.

10.00

Full Access
Question # 31

The following chart is being used to monitor a process. What do points X and Y. and region Z

represent on the chart?

CQE question answer

A.

Special causes of variation

B.

Changes in raw materials

C.

Common causes of variation

D.

Statistically stable variation

Full Access
Question # 32

The failure rate model above is used to show a typical relationship of many parts between their failure rate and the time in service. The reliability function for period "B" is BEST represented by

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 33

The primary purpose of the material review board is to

A.

monitor scrap and rework costs

B.

minimize quality costs

C.

disposition nonconforming product

D.

determine the root cause of problems

Full Access
Question # 34

A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of

A.

Redundancy.

B.

A series system.

C.

An active parallel system.

D.

A standby parallel system.

Full Access
Question # 35

An engineer is part of a new product team and has found an issue with one of the product's parts. The part's supplier has documented that the part is known to follow a normal distribution, but it has a large variance when produced. The engineer's product design has accounted for variations and incorporated the pan. Which of the following design processes did the engineer follow?

A.

Design-to-cost

B.

Design for robustness

C.

Axiomatic design

D.

Design for test

Full Access
Question # 36

Based on the FMEA results below, which of the following items should be prioritized first?

Severity RatingOccurrence RatingDetection Rating

Failure Mode 11058

Failure Mode 2796

Failure Mode 31059

Failure Mode 4699

A.

Failure Mode 1

B.

Failure Mode 2

C.

Failure Mode 3

D.

Failure Mode 4

Full Access
Question # 37

What is the probability of an item failing in less than 5 hours if it has a constant failure rate of 1/hour?

A.

0.00674

B.

0.99127

C.

0.99326

D.

0.99642

Full Access
Question # 38

CQE question answer

M in tills drawing, the symbol is being used to indicate the

H Calculator

A.

minimum material condition

B.

minimum measured condition

C.

maximum material condition

D.

maximum measured condition

Full Access
Question # 39

If a value assigned to a unit is non-numerical. it is described as

A.

nonconforming

B.

quantitative

C.

variable

D.

qualitative

Full Access
Question # 40

Which of the following actions best describes quality function deployment (QFD)?

A.

Determining if quality procedures are being followed on the shop floor

B.

Determining which processes are functioning correctly

C.

Linking customer requirements to product features

D.

Reducing costs of a product and product features

Full Access
Question # 41

Which of the following activities assesses the maturity of product or system design?

A.

Critical design review

B.

Preliminary design

C.

System requirement

D.

Production readiness system

Full Access
Question # 42

Four ingredients are blended to make a final product. Using the data below, what is the expected weight and variation of the final product?

Ingredient A 70 ± 3.00 grams

Ingredient B 20 ± 1.73 grams

Ingredient C 15 ± 1.73 grams

Ingredient D 10 ±- 1.00 grams

A.

115 ± 7.46 grams

B.

115 ± 5.73 grams

C.

115 ± 4.00 grams

D.

115 ± 3.61 grams

Full Access
Question # 43

Which of the following elements describes the combination of the severity and probability of occurrence of harm?

A.

Failure mode

B.

Hazard

C.

Risk

D.

Detection

Full Access
Question # 44

A three-level, two-variable, full factorial experiment is to be run. The minimum number of runs will be

A.

6

B.

8

C.

9

D.

18

Full Access
Question # 45

Which of the following tools can be used to show a frequency distribution?

A.

An affinity diagram

B.

An interrelationship digraph

C.

A PERT chart

D.

A check sheet

Full Access
Question # 46

Failure mode, effect, and criticality analysis, (FMECA) is primarily for the purpose of

A.

Learning as much about the item as possible after qualification test.

B.

Determining the way an item will most likely fail to help obtain design and procedural safeguards against such failures.

C.

Determining, by extensive analysis, the reliability of an item.

D.

Determining the cause of a failure, by dissecting the item, to help obtain corrective action.

Full Access
Question # 47

Which of the following is the most important aspect of a successful quality improvement effort?

A.

Employee participation

B.

Financial comminnent

C.

Management commitment

D.

Organizational need

Full Access
Question # 48

Adjusting machine settings to reduce the effect of ambient temperature changes on the seal strength of a paper package is an example of

A.

robust design

B.

analysis of variance

C.

statistical process control

D.

process capability

Full Access
Question # 49

A company is developing a machine that has many modules. Each module works as intended, but when placed in the machine the system performs at less than desired levels. System changes have further optimized each module, but overall system optimization has continued to decline. This is an example of

A.

a feasibility study

B.

a SWOT analysis

C.

a PEST analysis

D.

an unintended consequence

Full Access
Question # 50

Which of the following tools can be used to communicate performance data in time sequence?

A.

Scatter diagram

B.

Pareto chart

C.

Control chart

D.

Flow chan

Full Access
Question # 51

Which of the following tools is effective for evaluating all possible causes of a problem and isolating the probable causes?

A.

Pareto chart

B.

Control chart

C.

Scatter diagram

D.

Fishbone diagram

Full Access
Question # 52

Two advantages of process mapping are the ability to

?. Visualize the process being described.

?. Discover manufacturing problems only.

?. Discover quality problems only.

IV. Check current processes for duplication or redundancy.

A.

I and IV only

B.

II and III only

C.

I and III only

D.

II and IV only

Full Access