Weekend Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: spcl70

ACP-610 PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

ACP-610 PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Managing Jira Projects for Data Center and Server Certification
  • Last Update: Sep 13, 2025
  • Questions and Answers: 75
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

ACP-610 Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

ACP-610 Practice Exam Questions with Answers Managing Jira Projects for Data Center and Server Certification

Question # 6

Kim needs a single dashboard gadget that displays the following information for issues in her project:

• the total count of all issues

• the total count of each issue type

• the distribution of each issue type as a percentage

• a graphical chart display of that percentage

Which gadget meets this need?

A.

Heat Map

B.

Two Dimensional Filter Statistics

C.

Filter Results

D.

Issues in progress

E.

Issue Statistics

Full Access
Question # 7

Analyze the component configuration of a project as shown.

ACP-610 question answer

Dave creates an issue and wants to use the auto-assignment feature of Jira. Which statement is definitely correct?

A.

If UX is selected, the issue will be assigned to admin.

B.

If Login and Signoff are selected, the issue will be assigned to Project admin.

C.

If Signoff is selected, the issue will be assigned to Project admin.

D.

If Test is selected, the issue will be assigned to Project lead.

Full Access
Question # 8

A shareddashboard displays a gadget thatis based on a shared filter.

Currently, each person who views the gadget sees counts of all the issues in a project by status.

The team's requirement is that each person who views the gadget will see counts of only their assigned issues by status.

What must you do in order to meet this requirement?

A.

Configure the 'Who can view this filter" setting.

B.

Reconfigure the dashboard viewers.

C.

Use the currentUser0JQL function in the filter.

D.

Replace it with the "Assigned to Me" gadget

E.

Modify the Assignable User permission.

Full Access
Question # 9

Quang is a project administrator. He added several fields to his project screen. All team members have Edit Issues permission in this project. Which field can definitely be set allproject team member-."1

A.

Attachment

B.

Assignee

C.

Fix Version/s

D.

Labels

E.

Issue Type

Full Access
Question # 10

The MR manager is unsure whether she wants a Scrum or Kanban board for her project. Identify one difference between the boards.

A.

Only Kanban boards support column constraints.

B.

Only Scrum boards support a card layout for backlog view.

C.

Only Kanban boards can display Days in column

D.

Only Scrum boards have a sub filter

E.

Only Scrum boards support selecting an estimation method.

Full Access
Question # 11

A team currently uses a single project to track both features and tasks. They will be adopting aqile practices, as follows:

• Features will be developed during three week iterations.

• Tasks will be handled based on priority and rank and released incrementally as needed.

they want to use agile boards with minimal disruption to their current configuration. Which solution will meet their requirements?

A.

a Kanban board in the current project with separate swimlanes per issue type

B.

two Scrum boards for the current project, one for each issue type

C.

a Scrum board in the current project with two quick fillers to show each issue type separately

D.

a second project for tasks with a shared configuration and separate boards per project

E.

a Kanban board for tasks and a Scrum board for features in the current project

Full Access
Question # 12

A project administrator wantsto modify his project screen.

The project screen meets all the prerequisites for him to be able to edit it.

Which two actions can he perform? (Choose two.}

A.

create a new field

B.

create a new tab

C.

set a default value for a field

D.

make a field required

E.

remove a field

Full Access
Question # 13

A Scrum project has the following five configured versions:

ACP-610 question answer

Howmany of them will be available in the versions panel of the project backlog?

A.

4

B.

1

C.

2

D.

5

E.

3

Full Access
Question # 14

You have all the necessary permissions to transition issues on your board. There are no conditions or validators. One column has two statuses mapped to it You want to drag an issue into that column. Which statement is true?

A.

You cannot drop it into either status.

B.

You can drop it only into the bottom status.

C.

You can drop it only into the top status.

D.

You can drop it into either pop-up window.

E.

You can drop it into either status

Full Access
Question # 15

Sam and Jo are product managers responsible for two separate products. Each product has its own Jira project and a corresponding Scrum board.

Management requests an integration between the products. Sam and Jo decide to create all the integration-related issues in Sams project and label them integration".

Jo updated his Scrum board's saved filter to include the relevant integration issues from Sam's project.

Which statement is definitely true?

A.

All integration issues always appear on top of Jo's backlog.

B.

Changes to the rank of integration issues on Jo's board are reflected on Sam's board.

C.

Jo is unable to rank integration issues created by Sam.

D.

Sam is unable to transition integration issues that were ranked by Jo.

E.

Integration issues can only be ranked on Sam's board.

Full Access
Question # 16

Depending on the project configuration, a project administrator might be able to perform some tasks, instead of escalating them to the Jira administrator. Identic one such task.

A.

Remove Watchers from project notifications.

B.

Remove a priority value used by the project.

C.

Update permissions for a project user.

D.

Limit who can bulk edit project issues.

Full Access
Question # 17

Your team uses Story Points for estimation and tracking.

You performed several actions in the active sprint.

Which two actions are reflected as scope change? (Choose two.)

A.

Added a fix version on a committed story.

B.

Estimated a story in the backlog.

C.

Dragged on estimated story from the backlog to the sprint.

D.

Modified the estimate value on a committed story.

E.

Added another 5ub-task to a committed story.

F.

Logged work on several committed stories.

Full Access
Question # 18

Review the Version Report:

ACP-610 question answer

A.

The release date that has been added to this version should be reconsidered.

B.

More than 20 story points were burned when this chart was reviewed in July 2015.

C.

Only three issues have been completed in the version, so a predicted end date is not possible.

D.

The team should use time-based estimation, not story points.

E.

There are too many unestimated issues in this version, so any predictions are inaccurate.

Full Access
Question # 19

Your company recently created an internal IT project to track hardware requests. View the project configuration below: Project: Hardware request Project lead: Allen Frank Default Assignee: Project lead

ACP-610 question answer

To test thetriaging process you create the first issue in the project and select the Macbook 13" component. You don t update the assignee field and leave it to the default value of Automatic.

Based on the current configuration, which value will the assignee field show after creating the test issue?

A.

Allen Frank

B.

Mac Taylor

C.

Automatic

D.

Louise Lin

E.

Unaligned

Full Access
Question # 20

You need a field that:

• allows different options in different projects

• allows options to be disabled where necessary

• allows only a single value

• allows a default value to be configured

Which field meets these requirements?

A.

Select List (single choice)

B.

Checkboxes

C.

Component/s

D.

Labels

Full Access
Question # 21

Your team often accepts new requests from outside groups during an active sprint. You want to see if such frequent scope change mid-sprint is causing bottlenecks. Which report provides the needed insight?

A.

Control Chart

B.

Burndown Chart

C.

Average Age Chart

D.

Velocity Chart

E.

Cumulative Flow Diagram

Full Access
Question # 22

Your project will be audited. You need to grant specific permissions to the auditors through a project role.

The auditors do not have any Jira global permissions granted.

Which two permissions can be granted through a project role? (Choose two.)

A.

see issues with a security level

B.

see issues that have been archived

C.

share a dashboard with other auditors

D.

subscribe other auditors to a search result

E.

use bulk change to update seven issues

Full Access