Summer Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

INSTC_V7 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

INSTC_V7 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: BICSI Installer 2 - Copper Exam
  • Last Update: Sep 12, 2025
  • Questions and Answers: 116
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

INSTC_V7 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

INSTC_V7 Practice Exam Questions with Answers BICSI Installer 2 - Copper Exam Certification

Question # 6

Which of the following is used to connect cabinets to the nearest SBB?

A.

RBB

B.

TBB

C.

TEBC

D.

BBC

Full Access
Question # 7

Two truck drivers are communicating over a Citizens Band (CB) radio. Only one driver can send a message at a time with this system.

What type of transmission method is used in this example?

A.

Simplex

B.

Half-duplex

C.

Full duplex

Full Access
Question # 8

The information transmitted by an ICT system can originate in two fundamental forms:

A.

Synchronous and asynchronous

B.

Light and sound

C.

Progressive and regressive

D.

Analog and digital

Full Access
Question # 9

Which of the following steps should be performed first when an installer is pulling optical fiber cable?

A.

Install and secure innerduct

B.

Ensure the cable has been tested and accepted

C.

Label cables

D.

Attach pull rope

Full Access
Question # 10

Which of the following steps should be performed first when an installer is pulling backbone cable from the bottom up?

A.

Label cables and reels

B.

Verify the proper cable run

C.

Determine appropriate rope size

D.

Move cable reels into place

Full Access
Question # 11

How much cable slack should be left in the work area after termination?

A.

0.5m (1.6')

B.

1m (3.3')

C.

1.2 m (4')

D.

3m (10')

Full Access
Question # 12

What is the markings for non-conductive optical fiber riser cable?

A.

OFNP

B.

OFNG

C.

OFNR

D.

OFCR

Full Access
Question # 13

Which of the following describes a nonmechanical firestop system that forms a hard char when exposed to flame?

A.

Elastomeric

B.

Intumescent

C.

Ablative

D.

Endothermic

Full Access
Question # 14

Cavity boxes should be at least _____ away from the wall, where possible.

A.

100mm (4")

B.

150mm (6")

C.

300mm (12")

D.

450mm (18")

Full Access
Question # 15

You are terminating a category 3 cable. What is the maximum permissible amount of untwisting?

A.

25 mm (1")

B.

38 mm (1.5")

C.

75 mm (3")

D.

100 mm (4")

Full Access
Question # 16

Which of the following is used to measure the length of a 4-pair cable?

A.

Time domain reflectometer (TDR)

B.

Pair scanner

C.

Cable-end locator kit

D.

Tone generator

Full Access
Question # 17

Which of the following combinations is used to identify the tip conductors in Pair 1 of a 4-pair cable?

A.

White-Blue

B.

White-Orange

C.

Green-White

D.

Brown-White

Full Access