We at Crack4sure are committed to giving students who are preparing for the CIPS L5M9 Exam the most current and reliable questions . To help people study, we've made some of our Operations Management exam materials available for free to everyone. You can take the Free L5M9 Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.

Question # 6

There are four manufacturing companies located on Seashell Industrial Estate. Each company creates a different product and employs a different maintenance approach to its operations. For each company, select the corresponding maintenance approach and the key operating process characteristic.

Company 1: This company creates craft beer and offers customers a tour of the brewery for a small charge. The brewing equipment is serviced monthly and the brewery is kept extremely clean. All equipment is labelled with the last service date.

Company 2: This company produces seasonal items such as Easter Eggs and Christmas Cake. The equipment has a control panel where lights will flash red advising staff to check oil levels and components. Staff can then report issues to the maintenance team if remedial work is required. Product demand fluctuates throughout the year.

Company 3: This equipment does not often break down and is only fixed when it is reported by staff as no longer working. Company 3 creates toys, providing a large range of product sizes and colours based on different customer requirements.

Company 4: Parts of the machine are serviced quarterly but in general, the machine is left to run its course and is then replaced when it is no longer financially viable to fix. The company produces cereal and the operating process is focused on the quantity produced and therefore uses standardised processes.

Complete the table below by listing the maintenance approach and operating process characteristic for each company. Each response should only be used once: preventive maintenance, run to breakdown maintenance, condition-based maintenance, mixed maintenance, volume, visibility, variation, variety

Company

Maintenance approach

Operating-process characteristic

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 5?

A.

volume

B.

visibility

C.

variation

D.

variety

Question # 7

JJ Ltd is a sporting goods manufacturer who is based in the UK. It is considering expanding its operations to include manufacturing sites based in South America. Which of the following considerations will JJ Ltd need to consider now that they are becoming an international organisation? Select TWO

A.

keeping costs down

B.

cultural aspects

C.

quality standards

D.

product design

Question # 8

Total Quality Management is built on 8 founding principles. Which of the following do these include? Select THREE.

A.

employee involvement

B.

process improvement

C.

fact-based decision making

D.

bottom-up process design

E.

supply chain integration

Question # 9

Khaled has recently been hired as an Operations Manager at a company providing consultancy services. This is his first role in the service industry, previously he has worked at companies providing goods. He understands that services are intangible and therefore there is a difference in how Operations may be managed. Which of the following sentences about services are true? Select THREE

A.

there is a transfer of ownership when purchasing a service

B.

services cannot be stored, unlike goods

C.

it is not possible to return a service

D.

there is no variability in services

E.

production and consumption occur simultaneously

Question # 10

Performance Benchmarking is a form of what type of benchmarking?

A.

internal

B.

external

C.

competitive

D.

non-competitive

Question # 11

Which of the following situations would use a fixed-position layout?

A.

vehicle assembly

B.

ship construction

C.

supermarket

D.

buffet style restaurant

Question # 12

Which of the following operational activities is specifically concerned with checking that completed project outputs conform to customer specifications?

A.

process selection

B.

quality control

C.

procurement

D.

project management

Question # 13

Which of the following would you likely find on a Process Control Chart which is being used to monitor the quality of products manufactured in a factory?

A.

frequency of defects

B.

upper and lower control limits

C.

arrows showing the flow of goods

D.

different activities completed and the amount of slack available in each activity

Question # 14

An Operations Manager is responsible for making many decisions. Which of the following would be a strategic decision made by an Operations Manager?

A.

deciding which inventory to carry

B.

creating quality standards

C.

scheduling the production of manufactured goods

D.

deciding how to allocate key raw materials among the functional areas

Question # 15

Below are details of five companies who operate a Total Quality Management System (TQM). For each company, select the system used and identify which area of the Balanced Scorecard this relates to.

Company 1: The focus of this company is to gather real-time data to assess the quality of products created during the manufacturing process. There are tight budgets and reworking any defects will affect the bottom line.

Company 2: This company is concerned about how their products are received. They have recently completed market research focused on their client’s feelings. The objective is now to improve the product’s look and performance to meet these expectations.

Company 3: The focus of this company is defining the customer requirements and translating this into a high-quality specification and effective operational process.

Company 4: Within this company there is a group of 6 employees who meet regularly with the objective of reducing issues that arise in the manufacturing of products.

Complete the table below by listing the TQM System used and the relevant Balanced Scorecard criteria for each company. Each response should only be used once: Quality Circle, Statistical Process Control, Kansei Engineering, Quality Function Deployment, Finance Criteria, Business Process Criteria, Learning and Growth Criteria, Customer Criteria.

Company

TQM technique

Balanced Scorecard perspective

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 1?

A.

quality circle

B.

statistical process control

C.

kansei engineering

D.

quality function deployment

Question # 16

Below are details of 4 local manufacturing companies. For each company you must decide what the main objective is for the organisation and what layout their manufacturing plant has.

Company 1: This company creates large, delicate products which are hard to move. The main aim of the company is to stand out from competitors due to the superior level of materials used and by using the latest forms of technology to create the items.

Company 2: This company produces 72 different items and has designated zones within its premises for the creation of each item. The zones are organised based on the technology used and some products may be passed between different zones to be completed. The company creates many different items in response to changing customer demands, with many product lines only lasting a single season.

Company 3: Company 3 creates one product which flows along a single production line, with staff members adding to the product on four different occasions. The company must produce a high volume of this singular product in order to break even. Therefore, there is always a steady flow of items through the plant and it is important there is no stoppage in production.

Company 4: This company produces small batches of products, as and when they are ordered by customers. Due to uncertainty in demand, a high profit margin is added to the cost of each item. Teams in the factory are grouped into different areas depending on the technological process they are using.

Complete the table below by listing the objective criteria and plant layout for each company. Each response should only be used once: flexibility, speed, quality, cost, functional layout, cell layout, product layout, fixed-position layout

Company

Performance objective

Plant layout

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 2?

A.

flexibility

B.

speed

C.

quality

D.

cost

Question # 17

Dillan is an Operations Manager at Fancy Foods Ltd which is looking to expand the business into a new geographic area. Dillan is doing some research into three potential locations for a new manufacturing and warehouse facility. Which of the following would be primary considerations for Dillan? Select TWO

A.

the availability of labour

B.

potential business growth in the area

C.

flow of traffic in the surrounding area

D.

room for expansion

E.

utilities services available

Question # 18

A fast-food restaurant provides a drink machine for customers to use, which allows the customer to select the drink that they wish by putting their cup under the machine and pushing a button. The machine will first drop ice into the cup, but this button will not work unless the cup is placed on an X. What is this an example of?

A.

redundancy

B.

preventive maintenance

C.

fail safing

D.

run to breakdown

Question # 19

Logan has recently been appointed to the position of Operations Manager within in IT firm. The CEO has charged Logan with improving the performance of the department, in particular, in ensuring that promises made to customers are kept. Logan is therefore prioritising KPIs for the team including the delivering of services on-time and customer retention. Which of the 5 Performance Objectives of Operations Management is Logan focusing on?

A.

dependability

B.

flexibility

C.

quality

D.

speed

Question # 20

How can a company measure the dependability of an item it produces? Select TWO

A.

number of injuries caused by the product

B.

how quickly complaints are resolved

C.

variety of colours offered

D.

gross profit margin

E.

documentation is accurate

Question # 21

There are four manufacturing companies located on Seashell Industrial Estate. Each company creates a different product and employs a different maintenance approach to its operations. For each company, select the corresponding maintenance approach and the key operating process characteristic.

Company 1: This company creates craft beer and offers customers a tour of the brewery for a small charge. The brewing equipment is serviced monthly and the brewery is kept extremely clean. All equipment is labelled with the last service date.

Company 2: This company produces seasonal items such as Easter Eggs and Christmas Cake. The equipment has a control panel where lights will flash red advising staff to check oil levels and components. Staff can then report issues to the maintenance team if remedial work is required. Product demand fluctuates throughout the year.

Company 3: This equipment does not often break down and is only fixed when it is reported by staff as no longer working. Company 3 creates toys, providing a large range of product sizes and colours based on different customer requirements.

Company 4: Parts of the machine are serviced quarterly but in general, the machine is left to run its course and is then replaced when it is no longer financially viable to fix. The company produces cereal and the operating process is focused on the quantity produced and therefore uses standardised processes.

Complete the table below by listing the maintenance approach and operating process characteristic for each company. Each response should only be used once: preventive maintenance, run to breakdown maintenance, condition-based maintenance, mixed maintenance, volume, visibility, variation, variety

Company

Maintenance approach

Operating-process characteristic

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 3?

A.

preventive maintenance

B.

run-to-breakdown maintenance

C.

condition-based maintenance

D.

mixed maintenance

Question # 22

There are four manufacturing companies located on Seashell Industrial Estate. Each company creates a different product and employs a different maintenance approach to its operations. For each company, select the corresponding maintenance approach and the key operating process characteristic.

Company 1: This company creates craft beer and offers customers a tour of the brewery for a small charge. The brewing equipment is serviced monthly and the brewery is kept extremely clean. All equipment is labelled with the last service date.

Company 2: This company produces seasonal items such as Easter Eggs and Christmas Cake. The equipment has a control panel where lights will flash red advising staff to check oil levels and components. Staff can then report issues to the maintenance team if remedial work is required. Product demand fluctuates throughout the year.

Company 3: This equipment does not often break down and is only fixed when it is reported by staff as no longer working. Company 3 creates toys, providing a large range of product sizes and colours based on different customer requirements.

Company 4: Parts of the machine are serviced quarterly but in general, the machine is left to run its course and is then replaced when it is no longer financially viable to fix. The company produces cereal and the operating process is focused on the quantity produced and therefore uses standardised processes.

Complete the table below by listing the maintenance approach and operating process characteristic for each company. Each response should only be used once: preventive maintenance, run to breakdown maintenance, condition-based maintenance, mixed maintenance, volume, visibility, variation, variety

Company

Maintenance approach

Operating-process characteristic

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 4?

A.

preventive maintenance

B.

run-to-breakdown maintenance

C.

condition-based maintenance

D.

mixed maintenance

Question # 23

Below are details of five companies who operate a Total Quality Management System (TQM). For each company, select the system used and identify which area of the Balanced Scorecard this relates to.

Company 1: The focus of this company is to gather real-time data to assess the quality of products created during the manufacturing process. There are tight budgets and reworking any defects will affect the bottom line.

Company 2: This company is concerned about how their products are received. They have recently completed market research focused on their client’s feelings. The objective is now to improve the product’s look and performance to meet these expectations.

Company 3: The focus of this company is defining the customer requirements and translating this into a high-quality specification and effective operational process.

Company 4: Within this company there is a group of 6 employees who meet regularly with the objective of reducing issues that arise in the manufacturing of products.

Complete the table below by listing the TQM System used and the relevant Balanced Scorecard criteria for each company. Each response should only be used once: Quality Circle, Statistical Process Control, Kansei Engineering, Quality Function Deployment, Finance Criteria, Business Process Criteria, Learning and Growth Criteria, Customer Criteria.

Company

TQM technique

Balanced Scorecard perspective

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 5?

A.

finance criteria

B.

business process criteria

C.

learning and growth criteria

D.

customer criteria

Question # 24

Total Productive Maintenance and Just in Time are examples of Total Quality Management (TQM). Is this correct?

A.

yes- other examples include business process re-engineering

B.

yes- other examples include statistical process control

C.

no- TQM includes quality circles and quality function deployment

D.

no- TQM includes Kansei Engineering

Question # 25

Doug's Doughnuts Ltd is a large manufacturer of doughnuts. They produce in excess of 100,000 doughnuts per day which are boxed and sent to supermarkets and other retail outlets for sale. Large pieces of machinery are used to make the doughnuts. Which form of maintenance would be the most appropriate to use at Doug's Doughnuts?

A.

run to breakdown

B.

preventative

C.

condition based

D.

reactive

Question # 26

When quality is used as a foundation to build improvements in other areas such as dependability, what is this theory known as?

A.

brick-laying theory

B.

wave theory

C.

sand cone theory

D.

bridge theory

Question # 27

Which of the following stakeholders are also internal customers?

A.

buyers

B.

the local community

C.

banks and lending agencies

D.

employees

Question # 28

In an organisation that uses Quality Control to determine whether manufactured products conform to customer requirements, which of the following activities would most directly demonstrate product-level inspection?

A.

Employees systematically checking products for defects

B.

Establishing a quality steering committee

C.

Conducting regular customer-feedback exercises

D.

Undertaking preventive equipment maintenance

Question # 29

There are four dimensions of operating processes; volume, variety, variation and visibility. What is meant by variation?

A.

the fluctuation in demand for an item

B.

the number of different products made

C.

the number of different customers / markets for the product

D.

the amount of different uses for the item being produced

Question # 30

Building redundancy into operational procedures increases what for an organisation? Select TWO

A.

costs

B.

reliability

C.

risk

D.

customer satisfaction

Question # 31

Which of the following are performance objectives which can be applied to the Operations department at any organisation? Select THREE

A.

cost reduction

B.

dependability

C.

quality

D.

flexibility

E.

innovation

Question # 32

Farmer Ted harvests strawberries and sells these to retailers. Once the strawberries are collected from the field they are sent through a machine which will sort them by colour- ensuring only red strawberries are sent for packaging and any green, unripe strawberries are not. Which method of Poka Yoke is being used here?

A.

sequence method

B.

standardisation method

C.

constant number method

D.

contact method

Question # 33

Joan is the Operations Manager at a Dentist Surgery and has recently completed a Pareto Analysis with the hopes of improving the quality of service offered. Which of the following would be a possible finding from this analysis?

A.

80% of complaints are caused by 20% of the dentists

B.

The booking process is very slow and doesn't meet customer expectations

C.

there is a gap between the service expected by customers and the service delivered

D.

customers are twice as likely to recommend the dentist if they had a positive experience

Question # 34

Below are details of five companies who operate a Total Quality Management System (TQM). For each company, select the system used and identify which area of the Balanced Scorecard this relates to.

Company 1: The focus of this company is to gather real-time data to assess the quality of products created during the manufacturing process. There are tight budgets and reworking any defects will affect the bottom line.

Company 2: This company is concerned about how their products are received. They have recently completed market research focused on their client’s feelings. The objective is now to improve the product’s look and performance to meet these expectations.

Company 3: The focus of this company is defining the customer requirements and translating this into a high-quality specification and effective operational process.

Company 4: Within this company there is a group of 6 employees who meet regularly with the objective of reducing issues that arise in the manufacturing of products.

Complete the table below by listing the TQM System used and the relevant Balanced Scorecard criteria for each company. Each response should only be used once: Quality Circle, Statistical Process Control, Kansei Engineering, Quality Function Deployment, Finance Criteria, Business Process Criteria, Learning and Growth Criteria, Customer Criteria.

Company

TQM technique

Balanced Scorecard perspective

Company 1

Box 1

Box 5

Company 2

Box 2

Box 6

Company 3

Box 3

Box 7

Company 4

Box 4

Box 8

Which of the following will you put into box 8?

A.

finance criteria

B.

business process criteria

C.

learning and growth criteria

D.

customer criteria

Question # 35

The goal of Operations Management is to create processes which ensure the three Es: Efficiency, Effectiveness and Efficacy. What is meant be Efficacy?

A.

the process meets the intended purpose

B.

the process is optimised

C.

the process produces as little waste as possible

D.

the process is cost-effective

Question # 36

Terrance is an Operations Director at a pharmaceutical company which produces vaccines. He has been made aware of a malfunctioning piece of equipment with a Mean Time between Failures rating of 2 days. What characteristic of the machinery is being measured?

A.

availability

B.

reliability

C.

cost

D.

durability

L5M9 PDF

$27.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

L5M9 PDF + Testing Engine

$44

$175.99

3 Months Free Update

  • Exam Name: Operations Management
  • Last Update: Nov 14, 2026
  • Questions and Answers: 120
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

L5M9 Engine

$33

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included