70special - Ends in 0d 00h 00m 00s - Coupon code: 70special

CDT PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CDT PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Construction Documents Technologist
  • Last Update: Nov 23, 2025
  • Questions and Answers: 120
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CDT Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CDT Practice Exam Questions with Answers Construction Documents Technologist Certification

Question # 6

What does the Integrated Project Delivery (IPD) process involve?

A.

A collaborative, integrated, and productive team composed of key project participants

B.

Traditional delivery methods and team relationships for improving project performance by understanding the qualifications and attributes of team members

C.

Responsibility silos for greater efficiencies, leading to project success

D.

Segregat knowledge gathered as needed with paper-based communications to team members

Full Access
Question # 7

When do negotiations take the place of bidding?

A.

When exact quantities of work cannot be determined.

B.

When a publicly funded project's lowest bid exceeds the budget.

C.

When the contractor has defaulted on insurance premiums.

D.

When the owner and contractor have established a level of trust.

Full Access
Question # 8

Within the context of the construction industry, what does BIM stand for?

A.

Building Information Modeling

B.

Business Information Manual

C.

Building Interior Maintenance

D.

Building Inspection Manual

Full Access
Question # 9

If the contractor discovers that a part of the contract documents is in violation of the building code, what should the contractor do?

A.

Notify the architect/engineer in writing

B.

Proceed with the work in accordance with the contract documents

C.

Request a variance from the building authority

D.

Stop all work until the issue is resolved

Full Access
Question # 10

Which entity maintains project record documents?

A.

Architect/engineer (A/E)

B.

Contractor

C.

Owner

D.

Owner or A/E

Full Access
Question # 11

Which construction agreement provision establishes the duration of the work or a specific date when the owner can occupy the project completely or partially for its intended use?

A.

Cutoff date

B.

Date of commencement of the work

C.

Date of substantial completion

D.

Scope of work

Full Access
Question # 12

Which meeting is held for the purposes of introducing the design and construction teams, establishing the ground rules for communication, and explaining the administrative process?

A.

Mobilization meeting

B.

Preconstruction meeting

C.

Prebid meeting

D.

Coordination meeting

Full Access
Question # 13

Cost classification, data organization, and specifications use which written formats?

A.

OmniClass and UniFormat

B.

UniFormat and MasterFormat

C.

OmniClass and MasterFormat

D.

SectionFormat® and MasterFormat

Full Access
Question # 14

The general principle to which architects and engineers have a duty to clients and society at large to practice is defined as "taking the same course of action as another reasonable and prudent architect or engineer in the same geographic area would have taken under the same circumstances" is known by what term?

A.

Professional standard of care

B.

Due diligence

C.

Performance based requirement

D.

Spearin doctrine

Full Access
Question # 15

What is the term used to describe the time it takes to procure an item on site?

A.

Estimated time of arrival

B.

Procurement time

C.

Lead time

D.

Manufacturing time

Full Access
Question # 16

What does Divisions 02-49 of the construction project manual address?

A.

Procurement instructions

B.

Distinct work results areas

C.

Temporary facilities and controls

D.

Life cycle activities

Full Access
Question # 17

How does the architect/engineer control the project cost when not enough information is available to make product decisions during the design phases of a project?

A.

Alternates

B.

Unit prices

C.

Contingencies

D.

Allowances

Full Access
Question # 18

What project scheduling technique involves setting the target date of building occupancy and then working backwards to establish preceding milestone dates?

A.

Methods technique

B.

Critical path method

C.

Front end loading

D.

Schedule of values

Full Access
Question # 19

Which of the following is a component of the contract documents?

A.

Procurement requirements

B.

Resource drawings

C.

Shop drawings

D.

Addenda

Full Access
Question # 20

Modifications to the contract documents after execution of the owner–contractor agreement include which of the following?

A.

Change order, construction change directive, and field order

B.

Field order, construction change directive, and request for information

C.

Addendum, change order, and request for information

D.

Supplemental instructions, work change directive, and addendum

Full Access
Question # 21

Procedural requirements for alternates, project meetings, and submittals belong where?

A.

Divisions 02-49

B.

The general conditions

C.

The supplementary conditions

D.

Division 01

Full Access
Question # 22

There are over 3,500 different grades of steel. The amount of carbon, level of impurities, and additional elements all contribute to what grade steel is classified as in building projects. Therefore, which of the following is the method of specification writing used to limit lengthy descriptions of materials?

A.

American National Standards Institute (ANSI)

B.

Descriptive

C.

Performance

D.

Reference standard

Full Access
Question # 23

Standards for sustainable facilities, products, and fundamental approaches emphasize the needs of what?

A.

Architect, supplier, and contractor

B.

Owner, stakeholders, and participants

C.

Public, private, and environmental health

D.

Owner team, contractor team, and design team

Full Access
Question # 24

During the bid period, what does the architect issue if it is necessary to modify the procurement documents?

A.

Addenda

B.

Construction change directives

C.

Change order

D.

RFI response

Full Access
Question # 25

What is a fundamental principle required to provide fairness in a competitive bidding process?

A.

Bid securities provide protection to all bidders for unfair practices of others.

B.

The bid shopping process provides the most beneficial pricing to the owner.

C.

All bids are prepared based on identical conditions, information, and time constraints.

D.

A minimum of three bids are required to assure sufficient competition.

Full Access
Question # 26

When is decommissioning required for a facility?

A.

When the entire building is going to be demolished

B.

When the facility is no longer needed for operations

C.

When the facility will not be used again in the future

D.

When the building changes owners

Full Access
Question # 27

The names of the project, owner, architect/engineer and consultants, and the general project data such as a location map are normally included in which of the following?

A.

Sheet index

B.

Cover sheet

C.

General notes

D.

Building code summary

Full Access
Question # 28

Who is responsible for job site security?

A.

Owner

B.

Architect/engineer

C.

Contractor

D.

Construction manager

Full Access
Question # 29

To avoid miscommunication problems during construction, which best practice should the design professional use?

A.

Develop a good working relationship for verbally addressing problems as they arise

B.

Mark emails and electronic communications as "Urgent!" to ensure they are read right away

C.

Distribute meeting minutes to all attendees and concerned parties documenting key decisions and action items resulting from the meeting

D.

Leave detailed voicemail messages describing everything that needs to be done so there is a record of the direction

Full Access
Question # 30

Which of the following is a scaled view?

A.

Perspective

B.

Foundation plan

C.

Riser diagram

D.

Isometric

Full Access
Question # 31

What is the procedure for guarding against defects and deficiencies before and during the execution of the work?

A.

Quality assurance

B.

Quality control

C.

Quality management

D.

Quality monitoring

Full Access
Question # 32

Which party is usually required to maintain record drawings during the project according to the Project Delivery Practice Guide?

A.

Architect

B.

Contractor

C.

Owner

D.

Authority having jurisdiction

Full Access
Question # 33

Why should project closeout meetings be held?

A.

To set substantial completion

B.

To resolve subcontractor disputes

C.

To commission the project for occupancy

D.

To review handover procedures and activities

Full Access
Question # 34

When preparing their bid, a contractor organizes their costs into different categories. The following items are examples of which type of cost?

    Permits and inspections

    Mobilization and startup

    Jobsite safety and security procedures, including personnel

    Administrative costs attributable to the work

A.

Construction

B.

Contingency

C.

Overhead

D.

Insurance

Full Access
Question # 35

What must a specification section indicate?

A.

The building trade that will perform the installation

B.

The likely anticipated cost of the specified product

C.

The interrelationships that exist between the work of this section and the entire project

D.

How the owner will be compensated if the specified item is unavailable

Full Access
Question # 36

When the specifications allow controlled substitutions, a substitution may be approved during the bidding period only if what?

A.

An addendum is issued to all the bidders

B.

The proposer of the substitution is notified in writing

C.

The architect/engineer accepts the substitution during the pre-bid meeting

D.

Specifications are revised and reissued to include the substitution

Full Access