Weekend Special - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: spcl70

D-VXB-DY-A-24 PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

D-VXB-DY-A-24 PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Dell VxBlock Deploy Achievement
  • Last Update: Dec 9, 2024
  • Questions and Answers: 76
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

D-VXB-DY-A-24 Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

D-VXB-DY-A-24 Practice Exam Questions with Answers Dell VxBlock Deploy Achievement Certification

Question # 6

In the Enhanced Knowledge Transfer Phase, what is the correct sequence of steps in the Finalize Project Deliverables?

D-VXB-DY-A-24 question answer

Full Access
Question # 7

During which phase of the RCM Upgrade process is the customer required to maintain configuration lock?

A.

Upgrade

B.

Kick-off

C.

Planning

D.

Executing and Controlling

Full Access
Question # 8

A customer is using Cisco UCS 6332-16UP 40-Port Fl. They have 16 ports dedicated for FC traffic. The customer needs to increase the number of FC ports.

What is a consideration?

A.

Unused server ports can be converted to FC ports

B.

Maximum number of supported FC ports is 32

C.

Unused FCoE ports can be converted to FC ports

D.

Maximum number of supported FC ports is 16

Full Access
Question # 9

Based on the Dell EMC RCM Workbook upgrade plan, in what sequence should VxBlock components be upgraded?

D-VXB-DY-A-24 question answer

Full Access
Question # 10

Which logical entity in ACI allows for logical separation and reuse of IP address space within an ACI fabric?

A.

EPG

B.

VLAN

C.

Context

D.

Tenant

Full Access
Question # 11

Based on CPSD guidelines for VxBlock 1000, how many UCS chassis can be installed in a single rack?

A.

5

B.

4

C.

6

D.

7

Full Access
Question # 12

A customer has a physical server connected to an ACI fabric. The server was recently moved to a different leaf switch within the ACI fabric. The IP address of this server was

also changed but is still part of its original EPG.

What is a consideration once the correct port configuration is pushed from the APIC?

A.

The host must be removed, and the connections need to be re-assigned.

B.

No configuration changes are required on the ACI fabric.

C.

The switch must be moved with the machine to the new site.

D.

The contract needs to be updated to reflect the new IP address.

Full Access
Question # 13

What is a key benefit VxLAN?

A.

It reduces implementation cost of multiple VxBlock systems sharing data centers.

B.

It enables vMotion over Layer 3 subnets across geographic locations.

C.

It enables inter-VM communications among data center servers in different Layer 2 subnets.

D.

It can be configured in the hypervisor to support an NSX implementation.

Full Access
Question # 14

Which file system architecture is used on Isilon storage to deliver increased performance for file-based data applications and workflows?

A.

Distributed

B.

Single

C.

Multiple

D.

Hybrid

Full Access
Question # 15

D-VXB-DY-A-24 question answer

Refer to the exhibit.

A cable with the following label was connected to the wrong equipment type:

* M91A-01:01 U61A-01:09

Based on the exhibit, what is the target equipment type?

A.

Nexus 9xxx, Slot A, Port1

B.

UCS 5108 Chasses A, Slot 1, Port 9

C.

MDS 9xxx, Slot 1, Port 1

D.

UCS 6xxx FI, Uplink A, Slot 1, port 9

Full Access
Question # 16

A user cannot connect to Management switch 3172TQ. During troubleshooting it was discovered that the wrong IP was used in the SSH client.

What IP address should be used to establish the SSH connection to the Management switch?

A.

192.168.1.1

B.

10.10.10.2

C.

192.168.1.2

D.

10.10.10.1

Full Access
Question # 17

You are deploying a VxBlock system with Cisco ACI. What is a consideration?

A.

A minimum of two uplinks per leaf switch is recommended

B.

Fabric load balancing is achieved using VXLAN

C.

Leaf switches use 40 GbE vPC peer links

D.

Leaf switches connect to spines using 10 GbE links

Full Access
Question # 18

What is the recommended source to download a Test Plan for a specific VxBlock model?

A.

https://cpsdocs.dellemc.com/

B.

https://vce.flexnetoperations.com

C.

DellEMC Support

D.

SolVe Online

Full Access
Question # 19

What is a benefit of Software Defined Networking?

A.

Simplifies licensing requirements

B.

Increases network-provisioning time

C.

Improves network management efficiency

D.

Reduces the amount of hardware required for the solution

Full Access
Question # 20

Which document includes a complete list of tools used to perform a VxBlock 1000 upgrade?

A.

Converged Systems Administration Guide

B.

Converged Systems Expansion Guide

C.

Converged Systems Architecture Guide

D.

Converged Systems Physical Build Guide

Full Access
Question # 21

Which required NSX component abstracts the physical network and provides access-level switching in the hypervisor?

A.

Edge Services Gateway

B.

vSphere Distributed Switch

C.

Distributed Logical Router

D.

vSphere Standard Switch

Full Access
Question # 22

What service is provided by a VMKernel NIC?

A.

vMotion

B.

vCenter management

C.

VDS management

D.

System control

Full Access