Summer Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: spcl70

Practice Free D-VXR-DY-01 Dell VxRail Deploy v2 Exam Exam Questions Answers With Explanation

We at Crack4sure are committed to giving students who are preparing for the EMC D-VXR-DY-01 Exam the most current and reliable questions . To help people study, we've made some of our Dell VxRail Deploy v2 Exam exam materials available for free to everyone. You can take the Free D-VXR-DY-01 Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.

Question # 6

Which three actions cause a host “Incompatible” message to be displayed when expanding an OSA VxRail cluster? (Choose three.)

A.

Adding a host with VxRail code 7.0.411 to a cluster with VxRail code 8.0.200

B.

Adding a host with an AMD CPU to a cluster with Intel CPUs.

C.

Adding a host with all NVMe SSDs to a cluster with all SAS SSDs

D.

Adding a host with all SSDs to a cluster with HDDs

E.

Adding a host with only 1 GbE NICs to a cluster with 10 GbE NICs

Question # 7

A customer will be using the Spanning Tree Protocol on Dell ToR switches in the VxRail environment. How should the switch ports that are connected to the VxRail nodes be configured?

A.

Enable MLD snooping and querier.

B.

Set the port mode to access.

C.

Enable forwarding mode on the ports.

D.

Set the port type to edge.

Question # 8

When following Dell best practices during an implementation, where do you assign the VxRail Manager permanent IP address?

A.

All nodes

B.

Any node

C.

Primary node

Question # 9

An administrator physically installed the new nodes. Which two tasks must they complete before starting the deployment wizard? (Choose two.)

A.

Upgrade the firmware to the appropriate version using iDRAC.

B.

Validate the private management network VLAN.

C.

Configure the iDRAC network settings.

D.

Install the appropriate ESXi release using a VMware ISO.

Question # 10

A managed services team is planning a four-node VxRail cluster to support a new customer with limited resources in the data center. Which statement describes the physical switch considerations that can support the design?

A.

An OOB Management switch is required to support iDRAC management within the configuration.

B.

VxRail network traffic uplinks and iDRAC management uplinks can be combined on the same TOR switches.

C.

IPv6 Multicast technology must be supported by the TOR switches for manual node discovery.

D.

A VDS must be preconfigured with an LACP dynamic LAG to support resource-intense VSAN traffic.

Question # 11

When will local updates be the preferred option to update a VxRail cluster?

A.

When using a customer provided vCenter.

B.

When working at a dark site.

C.

When a proxy server is required.

Question # 12

What is a difference between compression and deduplication within a VxRail OSA cluster?

A.

Compression is only applied on a per disk basis. Deduplication is applied to the entire disk group.

B.

Compression requires significant resources to run. Deduplication requires marginal resources to run.

C.

Compression requires reformatting of the disk group. Deduplication does not require reformatting of disk groups.

D-VXR-DY-01 PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

D-VXR-DY-01 PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Dell VxRail Deploy v2 Exam
  • Last Update: Jun 21, 2026
  • Questions and Answers: 43
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

D-VXR-DY-01 Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included