We at Crack4sure are committed to giving students who are preparing for the Exin CDCS Exam the most current and reliable questions . To help people study, we've made some of our EXIN EPI Certified Data Centre Specialist exam materials available for free to everyone. You can take the Free CDCS Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.
Management requests a 15-minute battery bank at full UPS load. UPS specs:
30 kVA, PF 0.8
Battery 384 V (192 cells), end discharge 308 V
Inverter PF 0.8, 400 V output
What information is missing to perform the calculation?
The temperature in the computer room is being increased from 18°C/64°F to 27°C/81°F.
What is the impact, if any, on the amount of gas required to suppress a fire assuming the gas is a Halocarbon?
EMF shielding material needs to be installed as EMF levels from the transformer room into the computer room are measured at 100 mG. The transformer room is ~10 meters away, separated by a corridor. Where should shielding be installed?
Is it allowed to make design changes during the implementation phase?
You want to make cooling more effective by setting cold aisle temperature to 4 °C (39 °F). Is this acceptable?
When designing a data center network, your company wants to minimize the number of network cables to install. What type of physical cabling layout would be the best choice?
Where should raised-floor installation start?
What is the effect of having a damper (in open position) construction in a raised-floor tile?
A data center requires an audit to find out whether it conforms with ANSI/TIA-942 Rated-3 (concurrently maintainable).
Will the network architecture be part of this audit?
What indicates the overcurrent of a fuse or breaker?
What precaution shall be taken for cabling leading into an equipment rack when a data center is in a seismic-prone area?
What is forced entry resistance based on?
What is the minimum requirement for power feeds to a Rated-4 data center (ANSI/TIA-942)?
When designing a data center network, your company wants to minimize the number of network switches to manage.
What type of physical cabling layout would be the best choice?
What is the first step in the design stage of the data center life cycle?
You need to install a highly sensitive fire detection system. The data center has a high airflow rate. Which system should you recommend?
In which stage of the data center life cycle does commissioning take place?
The humidity in the computer room has changed from about 50% down to 35% Relative Humidity (RH).
What influence does this have on Electrostatic Discharge (ESD)?
A computer room needs to be fitted out with a gas-based fire suppression system. The computer room will be a high-density data center with about 30% of the racks being closed circuit cooling blade-center racks.
Should the supplier of the fire suppression system be informed on the design of the racks?
A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.
What type of generators should be installed?
A 5kW (power consumption) server keeps crashing with the message 'temperature too high'.
The intake temperature is measured at 25 °C/77 °F and a relative humidity (RH) level of 50%.
The exhaust temperature is 29 °C/84 °F and 45% RH.
The raised floor is providing an adequate amount of CFM/CMH at a reasonable velocity.
The pressure under the raised floor is approximately 25 Pa/0.1 inch H?O.
Analyze the situation and indicate what the most likely cause is for this server to crash.
What is the advantage of OM5 multimode fiber cabling?
Where should perforated tiles be installed?
You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F. Calculate the approximate CFM required to cool the equipment in the rack.
You are changing the design of the fire suppression system for your computer room from a halocarbon fire suppression system into an inert-based fire suppression system. Could you use the same formula to calculate the gas content for the gas?
In which stage of the data center life cycle does testing and commissioning take place?
What is needed to determine the Relative Humidity (RH)?
An MCB needs to be installed in the PDU of an air-conditioner unit.
Which breaking curve should you select?
An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?
What is the advantage of using Multi-fiber Push-On (MPO) connectors?
The building requires sprinklers and is equipped with a wet-pipe system. What action should you recommend for the computer room?