You just finished building a complete solution for a customer in One Config Advanced (OCA). You present it to the customer. The customer requires special packaging for the solution
Click in the exhibit of OCA where you can add special packaging instructions for the complete solution.
Which two metrics are key to guiding data placement decisions? (Choose two.)
You are designing a solution for a data-intensive application running on a ProLiant DL380 Gen10 server, where performance will be critical.
Which tool should you use to validate that your design meets the workload requirements?
A customer asks you about the features of the HPE SimpliVity, such as performance, availability, efficiency, and protection.
Which statement is correct about an HPE SimpliVity solution that enables these features?
A customer is asking for the latest version of the HPE Nimble Storage Integration Guide.
Where can the customer download the guide?
Which HPE Server family is purpose built for HPC workloads, Big Data Analytics, object storage, and enterprise service provider needs?
A customer needs to provide a composable server solution that is optimized for both the highest CPU frequency and the highest memory density.
Which compute solution is recommended?
You have been asked to architect an HPE 3PAR storage solution and integrate it into a customers existing mufti-vendor SAN
Which tools should you consult to verity interoperability of your proposed solution? (Select two)
Which tool supports HPE 3PAR. EMC VMAX, and VNX arrays, and is used to identify customer storage needs?
A cloud provider customer needs a new storage array and wants a solution with built-in multi-tenancy features.
Why should you propose HPE 3PAR StoreServ to this customer?
A customer is requesting new leaf switches for their 40-server virtualization farm. Their servers are currently equipped with 25GbE NICs.
Which switch family should you recommend?
A customer is purchasing a full rack of DL380 Gen10 servers. They are under a severe time constraint and would like the servers to be ready to receive applications upon power up.
What should be recommended to satisfy this requirement?
A customer is concerned that they might not have enough cooling capacity in their datacenter to support your proposed HPE server and storage solution
Which tool should you use to confirm your solution will meet their requirements'?