Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

HPE0-V27 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

HPE0-V27 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: HPE Edge-to-Cloud Solutions
  • Last Update: Apr 25, 2024
  • Questions and Answers: 74
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

HPE0-V27 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

HPE0-V27 Practice Exam Questions with Answers HPE Edge-to-Cloud Solutions Certification

Question # 6

Match each solution to the appropriate customer.

HPE0-V27 question answer

Full Access
Question # 7

What differentiated business value does HPE GreenLake provide to a customer that a traditional capital outlay purchasing model does not?

A.

Eliminate recurring costs

B.

Reduce accounts payable balance

C.

Improve liquidity

D.

Increased overprovisioning

Full Access
Question # 8

A customer has asked you to provide a new server and storage platform. They want to minimize the storage and network cabling within their datacenter.

Which technology will help address this customer requirement?

A.

Containers

B.

Fabric Vision

C.

RDMA over Converged Ethernet (Ro

D.

HPE Virtual Connect

Full Access
Question # 9

You have designed an HPE Synergy solution for a customer site. The customer wants to use this solution design as a blueprint to implement the same solution in 200 locations. They want to minimize cost for installation and configuration and therefore plan to order everything Factory pre-installed and pre-configured.

Which HPE tool can you use to document the customer requirements and attach them to the order?

A.

HPE SmartCID

B.

HPE SPOCK

C.

HPE GreenLake Central

D.

HPE Assessment Foundry

Full Access
Question # 10

Your customer required a managed private cloud solution of which they can retain ownership for tax purposes.

Which delivery model should you recommend?

A.

HPE GreenLake for Virtual Desktop Infrastructure (VDI).

B.

HPE Financial Services lease with GreenLake manaqement services.

C.

Traditional purchase with GreenLake manaqement services.

D.

Custom HPE GreenLake solution based on a reference architecture.

Full Access
Question # 11

You are generating a customer HPE GreenLake proposal for a customer.

Select the items that are mandatory when submitting the initial proposal to HPE for quoting.

(Choose two.)

A.

Start Bill of Materials

B.

End Bill of Materials

C.

Signed statement of Work

D.

Completed Order Checklist

E.

Credit Check Form

Full Access
Question # 12

Your customer needs a compute solution. Their aging data center can only supply 5kW per rack, which is below the 15kW required for your planned solution.

Which change could you recommend to satisfy the requirement while maintaining the planned solution’s level of performance? (Choose two.)

A.

Design the solution with non-redundant power supplies.

B.

Use BMC tools to cap the power consumption of each server at 33%.

C.

Spread the infrastructure across additional racks.

D.

Host the compute solution with a colocation provider.

E.

Convert the solution to HPE GreenLake pay-per-use.

Full Access
Question # 13

Match the solution from left to right the benefits.

HPE0-V27 question answer

Full Access
Question # 14

You are proposing a storage expansion solution to a customer Fibre Channel Array, to avoid capacity and performance issues.

Which additional points should you consider in your proposed solution? (Choose two.)

A.

VLAN and SpanningTree configuration.

B.

The UPS model that is currently in use.

C.

Other workloads that are planned to be added to this array

D.

Current Ethernet network topology.

E.

Performance bottlenecks in the current solution.

Full Access
Question # 15

Match the Terms left to right

HPE0-V27 question answer

Full Access
Question # 16

Match the use case with the appropriate cloud deployment model.

HPE0-V27 question answer

Full Access
Question # 17

Your customer would like to transition their bare metal server from a traditional deployment model to an HPE GreenLake Private Cloud Enterprise solution.

Which aspect of the shared responsibility model will be retained by the customer?

A.

OS Vulnerability mitiqation.

B.

HPE GreenLake central threat detection.

C.

Firmware management.

D.

Secure supply chain.

Full Access
Question # 18

You are presenting an HPE GreenLake for Private Cloud Enterprise proposal.

Which of the following statements is true?

A.

It only supports containerized workloads.

B.

It only supports virtualization workloads.

C.

It can support both containerized and virtualization workloads at the same time.

D.

It can support either containerized or virtualization workloads, but not at the same time.

Full Access
Question # 19

Which statements about HPE InfoSight are true? (Choose two.)

A.

It automates the firmware updates of all registered HPE devices.

B.

It provides cloud-based predictive analytics for HPE Alletra all-flash arrays.

C.

It can be used locally (dark sites) and in cloud environments.

D.

It provides cloud-based predictive analytics for HPE MSA.

E.

It enables cross-stack analytics for VMware and Hyper-V environments.

Full Access
Question # 20

You need to determine whether there is resource contention between VMs in an HPE Hyper-V environment.

Which tool should you use?

A.

HPE CloudPhvsics

B.

HPE Sinqle Point of Connectivity Knowledqe

C.

HPE NinjaSTARS

D.

HPE In

Full Access
Question # 21

Your customer needs a petabyte scale, geo-dispersed object Storage Platform.

Which Alliance solution will meet their requirement?

A.

HPE Solutions for Scalitv ARTESCA

B.

HPE Solutions for Qumulo

C.

HPE Solutions for Scalitv RING

D.

HPE Solutions for Cohesity

Full Access
Question # 22

Your customer acquired their Gen10 Plus servers through HPE GreenLake last year. They want to add HPE GreenLake for Block Storage to their GreenLake footprint. They ask you for a quote, and you inform them that you can start this process through their HPE GreenLake Central instance via a wizard-driven application.

What information do you need to gather for the wizard? (Choose two.)

A.

Reserved capacity

B.

HPE customer ID

C.

Site contact info

D.

Datacenter address

E.

Subscription term

Full Access