  • Exam Name: HCIA-Data Center Facility V2.0
  • Last Update: May 1, 2024
  • Questions and Answers: 204
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

H12-411_V2.0 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

H12-411_V2.0 Practice Exam Questions with Answers HCIA-Data Center Facility V2.0 Certification

Question # 6

Sensible heat ratio=Sensible heat/Full heat/Sensible heat/(Sensible heat+Latent heat).

A.

True

B.

False

Full Access
Question # 7

same MCB Rated ultimate short-circuit breaking capacity of circuit breaker LCU Generally less than the rated operating short-circuit breaking capacity LCS.

A.

True

B.

False

Full Access
Question # 8

In the low-voltage power distribution system,PE The function of the line is to provide a path for the fault current when the power supply system fails.

A.

True

B.

False

Full Access
Question # 9

____________ can complete the conversion from DC to AC.

Full Access
Question # 10

The air-conditioning energy efficiency ratio is the ratio of the effective input power to the cooling capacity, and its value is W/W Express.

A.

True

B.

False

Full Access
Question # 11

During the construction process, if there is an object falling or hitting, it should be used ____________ .

Full Access
Question # 12

There are three different classifications of grounding forms in low-voltage power distribution systems, ____________ . The second capital letter represents ____________ .

Full Access
Question # 13

Huawei Monitoring System NetEco Only the infrastructure of a single data center can be managed, and the centralized and unified management of multiple geographically divided data center infrastructures is not possible.

A.

True

B.

False

Full Access
Question # 14

International Electrotechnical Commission ____________. The specified contact voltage limit is ____________V, And stipulate 25V. The following does not need to consider the prevention Safety measures to prevent electric shock.

Full Access
Question # 15

In the data center power supply and distribution system, the low-voltage circuit breaker with three-stage protection feature is used for.

A.

Prevent branch circuit short circuit caused by branch circuit overload

B.

Prevent the main circuit from being overloaded due to the short circuit of the branch circuit

C.

Prevent the main circuit from breaking due to branch circuit breaking

D.

Prevent the main circuit from breaking due to a short circuit in the branch circuit

Full Access
Question # 16

The increase of cabinet power density will lead to the emergence of local hot spots in the computer room, and row-level air conditioners can solve local problems. The hot spot is too high.

A.

True

B.

False

Full Access
Question # 17

____________ After starting, the alarm will send out a strong sound and light alarm signal, which has reached the purpose of reminding the on-site personnel to pay attention.

Full Access
Question # 18

The dynamic environment monitoring system only has a secondary structure.

A.

True

B.

False

Full Access
Question # 19

The possible functions of the dynamic loop monitoring system include ____________ .

Full Access
Question # 20

The components of Huawei's dynamic environment monitoring system are ____________ .

Full Access
Question # 21

RER It is used to measure the use of renewable energy in the data center to promote the regeneration of solar, wind, and water energy, and the use of energy with no carbon emissions or very little carbon emissions.

A.

True

B.

False

Full Access
Question # 22

The following ____________ is not the basic function of low-voltage circuit breakers.

Full Access
Question # 23

Huawei Monitoring System NETECO Support hierarchical network management function.

A.

True

B.

False

Full Access
Question # 24

____________ The main function is electric energy distribution, which distributes the front-end electric energy to various types of electrical equipment according to requirements, standards and

specifications, such as ups, Air conditioning, lighting system, etc.

Full Access
Question # 25

The condensate of the air conditioner is formed by condensation after the air warning surface cooler cools down.

A.

True

B.

False

Full Access
Question # 26

____________ Not part of Huawei's monitoring system NETECO Provide monitoring functions.

Full Access
Question # 27

The following are air-cooled row-level air conditioners ____________ .

Full Access
Question # 28

The general method of connecting lead-acid batteries is to string first and then parallel.

A.

True

B.

False

Full Access
Question # 29

The following ____________ Yes UPS N The advantages of the system.

Full Access
Question # 30

The following ____________ options do not belong to the characteristics of direct air-cooled air-conditioning.

Full Access