Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

H12-425_V2.0 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

H12-425_V2.0 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: HCIP-Data Center Facility Deployment V2.0
  • Last Update: May 4, 2024
  • Questions and Answers: 55
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

H12-425_V2.0 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

H12-425_V2.0 Practice Exam Questions with Answers HCIP-Data Center Facility Deployment V2.0 Certification

Question # 6

In the FusionModule2000, the skylight actuator can control the rotating skylight in the aisle containment of the modular data center.

A.

True

B.

False

Full Access
Question # 7

Which of the following PH values meets the water quality requirements of NetCol8000-E220?

A.

3

B.

5

C.

7

D.

9

Full Access
Question # 8

During the installation of an air conditioner system, which of the following statements are correct about the draining impurities from the refrigerant pipe?

A.

Block one of the pipe ports.

B.

Fill the pipe with high-pressure nitrogen.

C.

Quickly remove the pipe plug, and avoid facing people to prevent injury.

D.

To discharge nitrogen from the outdoor unit.

Full Access
Question # 9

After all historical alarms of the NetCol5000-A are deleted, the deletion operation is not logged.

A.

True

B.

False

Full Access
Question # 10

Which of the following is a standard component in the FusionModule800 typical configuration?

A.

PAD

B.

Video surveillance system

C.

Intelligent lock

D.

iBattery

Full Access
Question # 11

What are the benefits of PowerEcho for the NetEco?

A.

Web-based unified maintenance interface

B.

Operation wizard

C.

Quick fault locating

D.

One-click health check

Full Access
Question # 12

For FusionModule2000, depending on different layout position, batteries can be deployed in the smart module or out of the smart module.

A.

True

B.

False

Full Access
Question # 13

Which of the following statements is true about UPS5000 power modules and bypass modules?

A.

The UPSS000-E-200K and UPS5000-E-400K use the same power module and provide the same capacity of 50 kVA but have different numbers of power modules.

B.

For UPSs of the same model but in different power segments, their bypass module capacity is the same.

C.

The power module capacity of both the UPS5000-S and UPS5000-E is 50 kVA. Therefore, the two types of UPS can be used together.

D.

The power modules used in the UPSS000-S-1200K are the same as those used in the UPS5000-E-200K.

Full Access
Question # 14

The UPS5000-E-200K works in normal mode. If two ECMs are faulty, how does the UPS work?

A.

The UPS has no output.

B.

The UPS transfers to bypass mode.

C.

The LCD is off, but the UPS still works in normal mode.

D.

The UPS switches to battery mode.

Full Access
Question # 15

In the FusionModule800 grounding solution, each cabinet is connected to the ground bar of the data center.

A.

True

B.

False

Full Access
Question # 16

The UPS can generate large leakage currents. A circuit breaker equipped with a residual current device (RCD) is not recommended. If leakage protection is required, consider the leakage current of the UPS and downstream devices.

A.

True

B.

False

Full Access