We at Crack4sure are committed to giving students who are preparing for the Huawei H20-923_V1.0 Exam the most current and reliable questions . To help people study, we've made some of our HCSP-Field-Data Center Facility V1.0 exam materials available for free to everyone. You can take the Free H20-923_V1.0 Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.
When the mains supply is stable, the UPS5000-H mainly works in which mode after ECO is configured?
During routine maintenance of the lithium battery cabinet, which of the following areas should be protected from electric shocks caused by exposed hands or metal objects?
After the battery module is installed, the torque and insulation should be checked according to the specified requirements.
Which O&M practice is most effective for identifying cooling inefficiency caused by airflow problems in an operating data center?
After the unit is powered on for the first time, it enters the compressor preheating state. To quickly perform power-on commissioning, you can manually shut down the compressor preheating.
Which of the following interfaces is used to connect the controller and the main control module of the unit?
The maintenance bypass switch cannot be turned on when the UPS5000-H works in normal mode.
Which of the following statements is false about the advantages of the free cooling solution for data centers?
The UPS5000-H-1200 kVA and UPS5000-H-1600 kVA have two power cabinets and one bypass cabinet, and are equipped with the MDU, ECU, and surge protection box.
Which of the following is not a scenario-based solution for Huawei data center products?
During routine maintenance of the lithium battery cabinet, which of the following procedure is true about replacing a faulty battery module?
After replacing the fan, choose "Menu > _____ > Performance Maintenance" on the main screen to enter the "Performance Maintenance" screen and clear the accumulated runtime of the indoor fan.
When the outdoor unit is installed at a position higher than the indoor unit, install an oil trap every five to six meters in the vertical direction along the gas pipe to ensure system reliability.