Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

Note! C2010-555 has been withdrawn.

C2010-555 Practice Exam Questions with Answers IBM Maximo Asset Management v7.6 Functional Analyst Certification

Question # 6

New centrifugal pumps have been acquired. These new assets need to be tracked and kept in the storeroom. How can this be accomplished?

A.

Issue assets to a storeroom location

B.

Move the assets to a storeroom location

C.

Track the asset via the storeroom application

D.

Associate the assets with an existing rotating item

Full Access
Question # 7

A maintenance planner is trying to determine the priority of scheduled work orders as well as the need for various items to complete that work. The planner determines that soft reservations should be made for these items. What is a characteristic of these reservations?

A.

reservations are prioritized

B.

does not reduce available balance

C.

cannot be superseded by other reservation types

D.

defined by the need for the items within a specific time frame

Full Access
Question # 8

A user belongs to two non-independent security groups, Group A and Group B. Group A has a purchasing limit of $7000 and Group B has a purchasing limit of $8000.

What is the purchasing limit of a user who belongs to both security groups?

A.

$7000

B.

$8000

C.

$15000

D.

$56000

Full Access
Question # 9

A company requires that laborers record the actual time they spent on a work order. The labor hours recorded are not automatically approved and the company does not want the laborer to have access to the Work Order Tracking application.

Which application would the laborers use?

A.

Invoicing

B.

Time Sheets

C.

Labor Reporting

D.

Activities and Tasks

Full Access
Question # 10

A buyer runs a BIRT report which details Supplier Compliance. The buyer needs to further analyze the data in a spreadsheet to include an additional graph before reviewing the information with the manager.

Which process transforms the data?

A.

Export

B.

Preview

C.

Application Export

D.

Report Transformation

Full Access
Question # 11

A supervisor has a requirement to group labor transactions by work order number while creating invoices in Labor Reporting.

How can this be achieved?

A.

Check the Consolidate by Work Order checkbox for each transaction.

B.

Enter the work order number, then enter each associated transaction.

C.

Check the Group Labor by Work Order checkbox for each transaction.

D.

Create an invoice for each work order, then enter each associated transaction.

Full Access
Question # 12

A company needs to ensure that the manufacturer’s recommended maintenance schedule is accomplished for each asset associated to a warranty contract. How can this be done?

A.

Attaching the Master PM Schedule to the Contract using Document Links

B.

Identify the Unit of Measure and Meter Duration on the Contract Lines Tab

C.

Entering the recommended maintenance schedule on the Terms and Conditions Tab

D.

Entering the meter reading in the Master Section for the asset on the Warranty Contract.

Full Access
Question # 13

A company has critical and time sensitive processes and tasks foe repairing assets. The company maintenance supervisor would like to be notified if any of the time sensitive tasks are overdue.

What application would the company use to configure this?

A.

Workflow

B.

Escalation

C.

Cron Task

D.

Interaction

Full Access
Question # 14

Incorrect meter readings have been taken for gauge meters and characteristic meters. The system administrator has been asked to correct the mistake.

How can the meter readings be corrected?

A.

Add a new meter reading in the Assets application.

B.

Add the correct meter readings in the Meters application.

C.

Add the correct meter readings in the Meter Reading application.

D.

Add the correct meter readings in the Preventive Maintenance application.

Full Access
Question # 15

A user is searching for a classification to add to a record in Work Order Tracking and is unable to find the known existing classification. What could cause this?

A.

Work Order record is in WAPPR status

B.

User does not see the Classifications application

C.

WORKORDER is not a Use With object for that classification

D.

The classification is not associated with the work order’s location

Full Access
Question # 16

Which tab provides a graphical representation of an asset and its relationships?

A.

Features

B.

Topology

C.

Relationships

D.

Specifications

Full Access
Question # 17

A planner is creating a list of various types of records that will eventually be added to work orders on the Plans tab to provide technicians with the required components to complete their work.

What types of non-set related records can be added? (Choose two.)

A.

Items

B.

Tools

C.

Services

D.

Materials

E.

Standard Services

Full Access
Question # 18

A workflow process design requires that the record be sent to the QA group if the QA Required field (a custom field) is checked. Otherwise it can continue on to the production department.

What type of node is used to enable this?

A.

Decision

B.

Condition

C.

Interaction

D.

Subprocess

Full Access
Question # 19

A company wants to trigger a PM based on a characteristic type meter.

How can this be accomplished?

A.

Create a master PM and link to the characteristic on the Related Records tab.

B.

Create a condition monitoring point and specify the PM on the upper or lower limit.

C.

Create a PM against the asset and specify the meter on the Frequency tab of the PM.

D.

Create an escalation based on the characteristic meter and trigger the PM via an action.

Full Access
Question # 20

A company has a requirement to present an informational dialog box to the user at run time.

Which of the following would be used in the workflow process design?

A.

a wait node

B.

an interaction node

C.

an accept action with a notification

D.

a manual input with a long description

Full Access
Question # 21

A company has an asset that has failed and an administrator needs to create a work plan that includes exact steps and descriptions that need to be followed to get the asset in operating status. Which option does the administrator need to follow?

A.

Create follow up work orders

B.

Create Job Plan from Work Plan

C.

Create a work order and add actuals

D.

Create a work order, add tasks and populate the summary field

Full Access