Summer Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

CFM PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CFM PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Certified Facility Manager
  • Last Update: Sep 12, 2025
  • Questions and Answers: 257
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CFM Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CFM Practice Exam Questions with Answers Certified Facility Manager Certification

Question # 6

What best describes Performance Measures?

A.

Performance indicators including metrics and drivers that achieve a given outcome.

B.

Pre-determined set of performance indicators and the actual results.

C.

Parameters and metrics that evaluate objectives against actual performance and goals.

Full Access
Question # 7

What is typically NOT included in the evaluation process for investments in new equipment?

A.

NPV analysis

B.

Net Benefit analysis

C.

Root cause analysis

Full Access
Question # 8

As the Facility Manager, you secured 5,500 square feet of Class A office space on a multi-tenant floor to support a two-year business initiative. To minimize capital investment, the space will be used with pre-existing furnishings, fixtures, and equipment. However, before you can move people into this space, you will need a certificate of occupancy. What system must be examined to obtain a certificate of occupancy?

A.

Life safety system

B.

Potable water system

C.

Network connections

D.

Telephone system

Full Access
Question # 9

What does NOT contribute to your company's overall carbon footprint?

A.

Amount of kWh consumed by your facility

B.

Amount of solar energy generated by your facility

C.

Amount of fossil fuels consumed by your facility

D.

Amount of stormwater runoff created by your facility

Full Access
Question # 10

When is the final payment made for a large-scale construction project?

A.

At the time of substantial completion

B.

After no less than 100% of the construction work has been completed

C.

Upon receipt of all deliverables, closeout documents, and lien releases

Full Access
Question # 11

When in the bidding process can vendors receive clarification to improve the quality of their proposal?

A.

Request for Proposal.

B.

Bidder Presentation.

C.

Pre-bid meeting.

D.

Selection Criteria.

Full Access
Question # 12

What process involves a skilled facilitator to reach a voluntary settlement in a dispute?

A.

Mediation

B.

Management escalation

C.

Arbitration

Full Access
Question # 13

What is the FIRST priority when allocating facility management resources?

A.

Urgency

B.

Dollar value

C.

Customer satisfaction

D.

Criticality

Full Access
Question # 14

What best describes a Building Automation System (BAS)?

A.

A system supporting two-way communication between controllers and devices, automated decisions, and analysis.

B.

A one-way control mechanism for multiple core building systems.

C.

A system that integrates various facility management functions, including building security and facility space metrics.

D.

A system that does not operate third-party systems.

Full Access
Question # 15

What is the first step to successful outsourcing?

A.

Negotiating terms.

B.

Planning the initiatives.

C.

Selecting providers.

D.

Analyzing cost/performance.

Full Access
Question # 16

A tenant questions annual reconciliation charges for common area and operating expenses per their lease. What is the strongest business practice for ensuring accounting practices are sound?

A.

Double-check all coding and charges and confirm that generally accepted accounting principles have been followed.

B.

Perform periodic audits by an internal or external auditing group that is not part of the accounting department.

C.

Suggest the tenant’s chief accountant review your books and the lease.

Full Access
Question # 17

How can the building information model (BIM) be used for emergency preparedness?

A.

It provides first responders with the names of all building occupants.

B.

It is not useful for emergency preparedness.

C.

It creates a virtual environment of the building for emergency personnel.

D.

It can help predict how an emergency will unfold.

Full Access
Question # 18

A recently installed speed bump that slows traffic for pedestrian safety in the facility parking lot is diverting water runoff away from the drain and toward an adjacent property. What factors should the facility manager consider when fixing the drainage problem?

A.

The facility manager’s responsibility ends at the property line, and no decision is necessary.

B.

Use water runoff as an irrigation source and control parking lot traffic.

C.

Pedestrian safety supersedes stormwater runoff issues, and no decision is necessary.

D.

Ensure pedestrian safety and resolve stormwater runoff issues.

Full Access
Question # 19

A company is ready to sign a lease for a new location. The new space must be renovated before workstations can be moved. The facility manager is asked to provide the occupancy date. Why is providing the occupancy date information critical?

A.

The moving company must be scheduled.

B.

The occupancy date represents when the company must begin paying rent.

C.

The date cannot be changed once the lease is signed.

D.

The facility manager will lose credibility if the information provided is incorrect.

Full Access
Question # 20

What is the BEST course of action for a facility manager to take when an engineer continues to lag behind other engineers in productivity?

A.

Use the engineer as an example of how not to perform to other engineers.

B.

Report the engineer to Human Resources.

C.

Develop a performance improvement plan with the engineer.

D.

Give the engineer a chance to correct his deficiencies on his own.

Full Access
Question # 21

In an indoor office environment, what is the MOST common complaint received by the facilities department?

A.

Indoor air quality

B.

Heating and cooling

C.

Janitorial issues

D.

Ergonomics issues

Full Access
Question # 22

In relation to establishing a level of acceptable risk, what should you include in your Business Continuity Plan (BCP) to help measure the plan's expected level of success against that level of risk?

A.

Contracted support

B.

Lessons learned

C.

Business analysis

D.

Performance metrics

Full Access
Question # 23

What sustainability benefits can be attributed to the use of a fully implemented Geographic Information System (GIS)?

A.

Greenhouse Gas Reduction and Water Runoff

B.

Greenhouse Gas Reductions and Energy Conservation

C.

Water Runoff and Composting

D.

Water Runoff and Energy Conservation

Full Access
Question # 24

What encourages consumption of products and services with the LEAST environmental impact?

A.

Materials management.

B.

Product stewardship.

C.

Closed-loop recycling.

D.

Waste management.

Full Access
Question # 25

What is the most important feature of an Integrated Workplace Management System (IWMS)?

A.

Use of software that allows ease of use.

B.

Use of standards that allow integration.

C.

Use of hardware that allows mobility.

Full Access
Question # 26

You are the Facility Manager for a retail strip mall with strong storefront style standards approved by the local government planning board. A long-term tenant, a Chinese restaurant, wants to construct a tile pagoda-style mansard that does not comply with the lease terms. How should you respond to this tenant’s request?

A.

The tenant cannot modify the entrance because the new entrance would not conform to the approved master plan of that shopping center, which has been approved by the local governmental planning board.

B.

The tenant must hire an architect to design the modification to the entrance in compliance with the guidelines spelled out in the master real estate plan.

C.

The tenant can modify the entrance, providing they pay for the improvement. This change must comply with the guidelines spelled out in the master real estate plan.

Full Access
Question # 27

Your organization is considering relocating from leased building #1 into leased building #2. Leased building #1 is 55,000 sq. ft. costing $1,100,000 annually. Leased building #2 is 50,000 sq. ft. costing $1,100,000 annually. Building #1 can house 500 people and building #2 can house 580 people. Your company's benchmark is $2,000.00 per person per year for leased space. Which building has a lower cost per sq. ft.?

A.

Building #1 has a lower cost per sq. ft.

B.

Building #1 and Building #2 are the same cost per sq. ft.

C.

Building #1 has a lower cost per person.

D.

Building #2 has a lower cost per sq. ft.

Full Access
Question # 28

You work for a facilities management service provider that wants to improve its service delivery processes and has decided to analyze its performance data. What advice would you offer regarding the data analysis exercise?

A.

Have an independent consultant analyze the data.

B.

Only analyze data that relates to subpar performance.

C.

Only analyze data that is less than twelve months old.

D.

Use the data that is valid and relevant.

Full Access
Question # 29

What is NOT a principle of designing a water-conserving system?

A.

Retarding evaporation through mulch or shading.

B.

Increasing turf areas to limit the heat produced from gravel or asphalt.

C.

Planting with irrigation in mind.

Full Access
Question # 30

You provide integrated facility services for a client with multiple mixed-use sites. This includes all services except the client's core business. Your annual business review includes identifying the most cost-effective and productive ways to meet your client's needs. What is an effective way to track your client's needs?

A.

Direct facility staff to share feedback they receive while working around the sites

B.

Meet with your client regularly to report results and identify emerging needs

C.

Meet with client department heads and solicit their suggestions and observations about the services

Full Access
Question # 31

A company has decided to establish a long-range strategic facility technology plan. What is the first step in determining the future technology needs of the company?

A.

Determine the level of employee technological skill requirements for the future.

B.

Review corporate plans for building renovations and lease negotiations.

C.

Research advances in technology.

D.

Conduct an assessment of existing technology.

Full Access
Question # 32

A new hire has been provided with new uniforms and a $150 stipend to purchase new work boots. Within the first month of employment, the employee informs the manager that another job has been accepted and provides a two-week notice. What actions should the manager take regarding the material issuances?

A.

Ask in a thoughtful and respectful tone for the employee to reimburse the organization for the uniforms and work boots.

B.

Absorb the loss of the material in the operating budget under uniform depreciation.

C.

Refer to the employee handbook and follow organizational policy regarding uniform and work boot issuances.

Full Access
Question # 33

What is the PRIMARY purpose of the Incident Command System (ICS)?

A.

Respond to large incidents.

B.

Avoid duplication of efforts in any incident.

C.

Effectively respond to any incident.

D.

Meet the needs of large operational staff.

Full Access
Question # 34

What factors are included in the SMART approach to developing key performance indicators?

A.

Systematic, measurable, achievable, reliable, time-bound.

B.

Specific, measurable, achievable, rational, time-bound.

C.

Specific, measurable, achievable, relevant, time-bound.

D.

Systematic, measurable, achievable, related, time-bound.

Full Access
Question # 35

The Facilities Management Department manages several service agreements related to environmental stewardship. When reviewing these service level agreements (SLAs), what should the Facility Manager consider?

A.

Best practices relevant to environmental stewardship.

B.

How to negotiate the regulatory requirements to meet the customer’s requirements.

C.

How to calculate maintenance and utility costs.

Full Access
Question # 36

What purpose does project evaluation serve?

A.

To assess whether the project's objectives are being met

B.

To resolve claims and disputes in a timely manner

C.

To provide control of a project

D.

To track and monitor project progress

Full Access
Question # 37

Departments often forget to budget for equipment design and installation costs. What is the best solution?

A.

Develop a procedure that would charge back capital installation costs to the department procuring the equipment.

B.

Mark up each equipment capital request by 15% to cover design and installation costs.

C.

Establish a procedure for all capital budgets to include Facilities' input on design and installation costs.

D.

Create a facilities installation fund that is 15% of the company’s annual capital equipment fund to cover these costs.

Full Access
Question # 38

What is MOST important when creating a facility culture of safety and security?

A.

Relying on a risks and hazards assessment after an incident has occurred

B.

Evaluating potential hazards and implementing corrective action, if needed

C.

Involving only senior management in the risk assessment

D.

Focusing exclusively on near misses

Full Access
Question # 39

You are the Facility Manager for a retail strip mall with strong storefront style standards approved by the local government planning board. A long-term tenant, a Chinese restaurant, wants to construct a tile pagoda-style mansard that does not comply with the lease terms. How should you respond to this tenant’s request?

A.

The tenant cannot modify the entrance because the new entrance would not conform to the approved master plan of that shopping center which has been approved by the local governmental planning board.

B.

The tenant must hire an architect to design the modification to the entrance in compliance with the guidelines spelled out in the master real estate plan.

C.

The tenant can modify the entrance providing they pay for the improvement. This change must comply with the guidelines spelled out in the master real estate plan.

Full Access
Question # 40

What is an industry standard quality program?

A.

Computerized Maintenance Management Reports

B.

Facility Management Benchmarks

C.

Six Sigma

D.

Certified Maintenance and Reliability Reports

Full Access
Question # 41

What advantages can you gain by capturing and applying lessons learned in a multi-phased project?

A.

Documenting lessons learned provides a way to pass on and usefully apply knowledge gained in one project to other projects. This saves time and money by preventing mistakes, streamlining work processes, and freeing staff to deal with unique aspects of later phases.

B.

Purchases made in earlier phases can be reused in later phases, saving money through efficient management of resources and negotiation of discounts with vendors as project managers learn to work with vendors.

C.

Since every phase is different, the only advantage of moving solutions forward is to know what has already been tried as learned from a previous situation.

D.

People learn what works and how to get along with their peers and leaders. As a result, teams can be organized so conflicts can be avoided since interpersonal relationships have already been tested.

Full Access
Question # 42

What is the most important strategic issue in the relationship between facility requirements and organizational requirements?

A.

Coordination

B.

Alignment

C.

Understanding

Full Access
Question # 43

Your snow removal contractor is required to remove snow at two inches but has not responded during a heavy storm. What steps will you take in the future to ensure site safety?

A.

Cancel existing snow removal contract and hire another contractor immediately to remove snow and control ice for subsequent events.

B.

Meet with contractor immediately after the snow event to resolve service issues and identify a secondary contractor to remove snow and control ice in the event of future failures by the primary contractor.

C.

Immediately after snow event is predicted, purchase emergency supplies required for comfort of client staff staying on site throughout the event.

Full Access
Question # 44

What is the primary leadership goal for a Facility Manager?

A.

See the big picture

B.

Help clients and customers succeed

C.

Be the go-to person for guidance on FM issues

Full Access
Question # 45

When considering location alternatives, what should the facility management professional know?

A.

Executive preferences and drivers.

B.

Market and available workforce.

C.

New construction activity.

D.

Retail and competitor locations.

Full Access
Question # 46

What is the definition of "real property"?

A.

Things located within buildings such as furniture, accessories, appliances, etc.

B.

Property that has nothing artificial on it, only natural materials.

C.

Land, buildings, and machinery or equipment.

D.

Inventory and loose materials.

Full Access
Question # 47

Part of your goals is to develop a succession plan for key positions within your operation, including yourself. What is most helpful in reaching this goal?

A.

Conduct staff interviews to see who wants to be promoted.

B.

Conduct a review of staff goals and objectives.

C.

Conduct a skills gap analysis of current staff and incorporate the results into training goals.

Full Access
Question # 48

Your company has been successful in obtaining business with a new client that has stores in malls and on campuses. You will be responsible for contracting and managing third-party services formerly managed by your new client's onsite managers at multiple retail locations. Your client has asked that, to the best of your ability, you retain current contractors and, more importantly, their staff members. The agreement between your company and the client requires that you reduce the client's expense for the contracted services by 6%. Who are the stakeholders in your newly obtained client?

A.

Other companies in the malls and campuses where your client has stores

B.

Client customers, internal stakeholders, indirect stakeholders, and service providers and partners

C.

Client staff and visitors at each store

D.

Managers within your company who manage comparable client services

Full Access
Question # 49

What is a facilities register?

A.

A list of accounts representing the contracted services for a facility.

B.

A comprehensive list of the organization’s facility assets, including buildings, grounds, and infrastructure.

C.

An integrated work management system utilized in a facility to track preventative and on-demand work orders.

D.

A master list of emergency contacts for use in business continuity/emergency purposes.

Full Access
Question # 50

During the construction phase of a project you are managing, the customer wishes to add to the project scope. You think that the cost of the change is 25% greater than your contingency. What steps will you take?

A.

Get an estimate from the contractor for a change order. Also, review the impact this will have on the entire project’s cost, schedule, quality, and risks. Present these findings to the customer along with the request for additional funds.

B.

Tell the customer you may be able to accommodate their request if the contingency budget is not used for other issues. Try to cut other scope items or create savings in other parts of the project to fully fund this request.

C.

Tell the customer that their request is out of scope and cannot be accommodated. The project does not have the funds for this additional work. Explain how this request impacts schedules delaying work and adding significantly to time as well as cost.

D.

Immediately agree to add the work to your project scope without getting an estimate from the contractor to determine the additional cost. You and the contractor can work out the differences as you go along.

Full Access
Question # 51

What do as-built drawings document?

A.

Construction drawing bid set.

B.

Architectural drawings after design development.

C.

Field conditions after construction.

D.

Space program prior to design development.

Full Access
Question # 52

How can you prevent power issues in a training room dependent on Power over Ethernet (PoE) switches?

A.

Load shedding

B.

Redundant power over Ethernet switches

C.

Uninterruptible power supply

D.

Capacity management

Full Access
Question # 53

What facility management systems' software retains assets building performance with standardized key performance metrics?

A.

Integrated Workplace Management System

B.

Building Automation System

C.

Building Information Modeling System

D.

Computerized Maintenance Management System

Full Access
Question # 54

How should the facility manager ensure the gym meets staff expectations?

A.

Solicit staff asking for suggestions on how to improve the gym.

B.

Poll in the industry and ask them how best to create and maintain a gym facility for staff use.

C.

Have the facility manager perform the monthly inspections.

D.

Hire a consultant to provide you with information regarding trends to keep a gym current.

Full Access
Question # 55

What is one of the MOST common reasons implementing a Computerized Maintenance Management System (CMMS) fails?

A.

Users are resistant to change.

B.

The board members are not interested in the system.

C.

The CMMS is home-grown.

D.

The building systems are not compatible with the CMMS.

Full Access
Question # 56

What is NOT typically included in service level agreements (SLAs)?

A.

Problem management resolution procedures.

B.

Billing or chargeback procedures.

C.

Definition of services.

D.

Request for proposal.

Full Access
Question # 57

Which type of lease requires the tenant to pay all expenses of the property being leased (taxes, insurance, maintenance) in addition to rent?

A.

Triple net lease

B.

Gross lease

C.

Full-service lease

Full Access
Question # 58

Which job strategy is most effective in encouraging job satisfaction according to Frederick Herzberg's theory?

A.

Job simplification.

B.

Job enrichment.

C.

Job rotation.

D.

Job enlargement.

Full Access
Question # 59

During regular preventive maintenance activities, you notice green algae and scaling on the interior walls of the cooling tower. What action should you take to resolve the concerns?

A.

Shutdown the tower, allow surfaces to dry, and scrape biological growth from interior walls before returning the tower to operation.

B.

Test the cooling tower water, adjust the frequency of chemical balancing, and flush if needed.

C.

Perform a building occupant health survey to determine any adverse effects, and then adjust the injection levels of balancing chemicals.

D.

Drain the tower and then complete a fresh-water flush using warm water, and add new balancing chemicals.

Full Access
Question # 60

Which technology would be BEST to notify facility occupants during an emergency?

A.

Company's social media profile.

B.

Emergency notification system.

C.

E-mail system.

D.

Incident management system.

Full Access
Question # 61

Who implements the strategic facility plan?

A.

Operations Manager

B.

Facility Manager

C.

Chief Financial Officer

D.

Chief Operations Officer

Full Access
Question # 62

You work for a company that provides facility management services for a bank. The bank wants your company to demonstrate its commitment to continuous improvement in service delivery. How can you demonstrate to the bank your commitment to continuous improvement?

A.

Find out what other banks do in terms of continuous improvement.

B.

Write to the bank stating your commitment to continuous improvement.

C.

Include indicators relating to continuous improvement in the service level agreement.

D.

Ask the bank to submit a list of continuous improvement requirements.

Full Access
Question # 63

A new department manager is not clear on the services provided by the facility management department and is often negative about facility management while at management meetings. How should a facility manager address the customer's expectations?

A.

Request that the manager refrain from complaints at this meeting as it is not the appropriate venue.

B.

Request that the other managers have a discussion with him about office protocol.

C.

Request that he read his service level agreement.

D.

Review the customer service level agreement to determine a mutually agreed performance standard.

Full Access
Question # 64

Recently, an organization has flattened its structure versus that of a typical pyramid structure. As part of the restructure, the existing office building will be renovated. What type of design elements should a facility manager consider in the renovation?

A.

Offices for management, teaming areas, shorter workstation panels, and large conference rooms

B.

Team areas, bigger workstations for files, offices for senior management, and fewer meeting rooms

C.

Space for employee interaction, team areas, smaller workstations, and shorter panels

Full Access
Question # 65

You are the Facility Manager for an international internet technology company. You are charged with retrofitting an old warehouse space on your corporate campus to office space for software designers. What basic features for the new office space would you recommend the architect include in the retrofit design?

A.

Minimal employee traffic flow; increased employee density ratio; and close proximity to food services.

B.

Maximum number of private and secure offices; minimum exterior window openings; and increased security measures.

C.

Maximum open and colorful meeting space; redundant internet connectivity; and increased security measures.

D.

Minimal decorative elements; increased employee density ratio; and close proximity to public transportation.

Full Access
Question # 66

Your company operates a Web-based CMMS but struggles with service quality across its facilities. What is the best way to address the issue?

A.

Select one facility for improvement and use this as the benchmark for all the other facilities.

B.

Use the CMMS data to identify those service delivery processes that need improvement.

C.

Retrain service delivery staff on the efficient use of the CMMS.

D.

Have each facility manager identify performance improvement initiatives for their respective facilities.

Full Access
Question # 67

When a facility manager initiates an office relocation project, which item is completed first?

A.

Develop the project program.

B.

Secure the budget.

C.

Develop the project charter.

D.

Secure the new lease.

Full Access
Question # 68

What may be impacted if requirements aren't captured correctly at the beginning of an Integrated Workplace Management System (IWMS) implementation?

A.

Cost and schedule

B.

Temperature control and cost

C.

Special relations and utilizing color

Full Access
Question # 69

To satisfy the needs of one of its largest customers, your company is opening a new facility about 1240 miles/2000 kilometers away from the corporate offices. Initially, the new operation will only support one customer. However, the company expects more customers will be added in the next three to five years. The plan is that the corporate office will support operations in the new facility. What is the best way to manage the facility requirements of this new operation?

A.

Use a temporary agency for facility services and manage everything from the corporate office.

B.

Hire a permanent staff of facility employees for the new operation.

C.

Contract with an outsource company to provide facility management services for the new operation.

D.

Relocate some existing facility employees to the new operation.

Full Access
Question # 70

Various workers in a facility are complaining about neck, shoulder, and back pain. The facility manager decides to execute an ergonomic audit. What is the primary purpose of an ergonomic audit?

A.

Identify new requirements for ergonomic equipment.

B.

Improve worker productivity.

C.

Identify existing problems and prevent future injuries.

D.

Determine a training program for the workers.

Full Access
Question # 71

When your company is considering consolidating its real estate portfolio, what are the most critical factors to consider?

A.

Current space utilization, overall occupancy cost per square foot, geographic proximity/overlap.

B.

Lease vs own status, neighborhood amenities, political environment.

C.

Make-up of the workforce, outdated interiors, tax incentives.

Full Access
Question # 72

You provide integrated facility services for a client with a single site, including janitorial services. The client’s site has been granted LEED certification, including points for implementing a green cleaning policy. What should you do to meet the client's need for a green cleaning policy?

A.

Contact professional organizations in the janitorial industry and Facility Managers at other LEED-certified sites for their recommendations.

B.

Review professional journals, identify green cleaning solutions, and prepare a policy and procedures based on those solutions.

C.

Review LEED standards applicable to the site, identify compliant equipment and supplies, and prepare a policy and procedures based on those standards.

D.

Meet with equipment and supplies vendors specializing in green cleaning and obtain their recommendations.

Full Access
Question # 73

What information does the facility manager need to ensure the proposed cafeteria price increases are reasonable?

A.

Current purchasing data

B.

Written justifications and data

C.

Current market data

D.

Customer opinion surveys

Full Access
Question # 74

What are the four methods a project manager should use to prove project requirements are met?

A.

Planning, specifying, negotiating, and payment

B.

Testing, analysis, inspection, and interpolation

C.

Interviewing, observing, inspecting, and reporting

D.

Analysis, reporting, measurement, and permit sign-off

Full Access
Question # 75

What safety precautions are MOST important during a partial renovation of a building while keeping the existing business operating?

A.

Require the contractor to perform indoor air quality testing once a month to ensure staff safety and post results.

B.

Hearing protection and eye wash stations should be set up in designated locations within the construction area to minimize employee risk.

C.

Barriers must be set up to create a safe perimeter: all staff members should be moved outside of the area and it should be designated as an area where personal protective equipment must be worn.

D.

Staff should be required to wear safety footwear, hard hats, and a security checkpoint should be set up to ensure staff compliance.

Full Access
Question # 76

What detailed review process results in a score outlining the status, age, and life cycle condition of a building and its components?

A.

Post-occupancy evaluation.

B.

Facility condition assessment.

C.

Life cycle cost analysis.

Full Access
Question # 77

After completing a renovation of a wing of an older building, what actions will a Facility Manager do prior to occupancy to remove pollutants from the newly installed finishes?

A.

Adjust the HVAC.

B.

Run the building's air conditioning for a legally required period.

C.

Bring 100% fresh air into the area.

Full Access