Weekend Special - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: spcl70

CCBA PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CCBA PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Certification of Capability in Business Analysis (CCBA)
  • Last Update: Sep 15, 2024
  • Questions and Answers: 522
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CCBA Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CCBA Practice Exam Questions with Answers Certification of Capability in Business Analysis (CCBA) Certification

Question # 6

You are the business analyst for a smaller project where there are few requirements. Management would still like you to create a method to trace the few requirements for this project. What type of matrix would be best in this instance?

A.

Coverage matrix

B.

Requirements trace matrix

C.

Roles and responsibility matrix

D.

RACI matrix

Full Access
Question # 7

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Full Access
Question # 8

A business analyst (BA) is verifying requirements for a software solution. The BA needs to confirm that items determined to be important are included in the final requirements deliverable. Which of the following will help the BA complete this task?

A.

Checklists

B.

Requirements matrix

C.

Evaluation criteria

D.

Prioritization

Full Access
Question # 9

During a project to replace an existing system, requirements for new functionality were elicited. Upon further investigation, additional types of requirements related to other features and characteristics were also identified. What can facilitate effectively understanding the different types of requirements?

A.

Fishbone diagram

B.

Classification schema

C.

Process modelling

D.

Scope modelling

Full Access
Question # 10

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Full Access
Question # 11

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Full Access
Question # 12

A business analyst (BA) is determining the current state as part of a new project. What is an internal enterprise asset that the BA must include in the analysis?

A.

Brand name

B.

Organizational structure

C.

Business need

D.

Enterprise mission statement

Full Access
Question # 13

A business analyst (BA) has determined that “Product Box”, a collaboration game, will provide a fun way to engage the stakeholders when working on prioritizing the list of features. What should the BA do?

A.

Ensure buy-in from key stakeholders

B.

Send out an agenda in advance

C.

Research ideas for the new product

D.

Consider meeting logistics

Full Access
Question # 14

Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project.

They are testing the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project. What type of process are Bob and Susan completing with these materials?

A.

Stress test

B.

Feasibility study

C.

Benchmarking

D.

Alternative identification

Full Access
Question # 15

A project manager (PM) is planning the project timelines along with a business analyst (BA) and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a predecessor for requirement allocation?

A.

Requirements architecture is approved

B.

Design options are available

C.

Solution approach has been determined

D.

Requirement are validated

Full Access
Question # 16

You are the business analyst for your organization and you're working with your stakeholders to assess the organization's readiness for the solution. As part of this assessment, you'll perform a cultural assessment. What is the purpose of this assessment?

A.

To determine how the culture may affect the solution

B.

To determine if the stakeholders genuinely want the change to be successful

C.

To determine if the change is feasible in the environment

D.

To determine how the solution affects the stakeholders' culture

Full Access
Question # 17

A business analyst has identified four different solutions for a business need. In the light of solution assessment, how many solution assessment iterations should he do?

A.

The business analyst can do multiple assessments, one for each solution or to compare multiple solutions.

B.

There is no limit, but the business analyst should perform the same type of assessments for each solution to be balanced.

C.

The business analyst can do one assessment per solution.

D.

There should only be one solution assessment - four is too many. Some of the solutions are better than others.

Full Access
Question # 18

Beth is the business analyst for her organization and she wants to be certain that she and her team follow the correct procedures for enterprise analysis. What document can provide the governances for enterprise analysis efforts?

A.

Organizational process assets

B.

Enterprise environmental factors

C.

Business analysis plans

D.

Project charter

Full Access
Question # 19

There are three inputs in the plan business analysis approach. Which one of the following is not one of the three inputs?

A.

Organizational process assets

B.

Expert judgment

C.

Risk and rewards analysis

D.

Business need

Full Access
Question # 20

All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

A.

All ideas should be visibly recorded.

B.

The number of ideas should not be limited.

C.

The ideas should be generated with a cost or time estimate.

D.

All ideas should be shared without any discussion, criticism, or evaluation.

Full Access
Question # 21

You are the business analyst for your organization and you're working with Adam on business analysis processes. Adam allows the business analysis activities and resources to exist in support of the organization. Of the following, what type of business analysis stakeholder is Adam?

A.

Project manager

B.

Domain subject matter expert

C.

Sponsor

D.

Regulator

Full Access
Question # 22

Complete this statement. Policies and rules serve as boundaries and the organization and the operation of the organization.

A.

Influence

B.

Constraint

C.

Direct

D.

Lead

Full Access
Question # 23

You are the business analyst for your organization and your manager has asked you to prepare an analysis of each proposed solution. Your manager wants you to determine whether and how each option can provide an expected business benefit to meet the stated business need. What is your manager asking you to create?

A.

Feasibility study

B.

Abbreviated study

C.

Alternative identification analysis

D.

Quantified analysis

Full Access
Question # 24

You are the business analyst for your organization. Your current project is using a plan-driven approach for the requirements, business analysis, and monitoring. Which one of the following statements best describes the plan-driven approach to business analysis planning and monitoring?

A.

Plan-driven approaches encourage changes that prevent errors and omissions.

B.

Plan-driven approaches typically call for a significant amount of formality and detail.

C.

Plan-driven approaches determine how priorities will be diagnosed for the project solution.

D.

Plan-driven approaches typically have meetings daily to discuss the business analysis requirements process.

Full Access
Question # 25

There are three business analysis planning techniques that a business analyst can use to help plan business analysis processes. Which one of the following is not one of the three techniques?

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Full Access
Question # 26

An organization has invested $750,000 into a technology to help secure, automate, and communicate customer ordering. The solution has worked well for the past six months, but a newer technology has been developed that surpasses the abilities of the current solution and solves many defects and issues the company has with the existing solution. Purchasing the newer solution, however, means that the company will have to discard the solution that's only been in place for the past six months. What term can be assigned to the monies already implemented into the existing solution?

A.

Opportunity cost

B.

Cost of nonconformance

C.

Sunk costs

D.

Cost-benefits

Full Access
Question # 27

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Full Access
Question # 28

The process of defining the business need uses one output. What is it?

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Full Access
Question # 29

Which one of the following statements best describes the purpose of allocating requirements?

A.

Optimize efficiency and link to productivity.

B.

Limit the risk exposure.

C.

Maximize the business value.

D.

Increase productivity through efficiency.

Full Access
Question # 30

You are the business analyst for your organization. Management has asked that you create a method to store the project requirements including those under development, under review, and the requirements which have been approved. What is management asking you to create?

A.

A change management system

B.

A repository

C.

Requirements register

D.

A project scope statement

Full Access
Question # 31

Several user groups are impacted by a proposed change to their daily work flow. How should the business analyst (BA) convey these changes so that the user groups understand the impact?

A.

Develop a data model diagram

B.

Create business process models

C.

Write functional requirements

D.

Establish a communication plan

Full Access
Question # 32

Project Communication Management includes the processes required to .

A.

Ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

B.

Identify, define, combine, unify, and coordinate the various processes and project management activities with the Project Management Process Groups.

C.

Manage timely completion of the project.

D.

Organize, manage, and lead the project team.

Full Access
Question # 33

An organization has two different solutions to grow its business. One project is worth $375,000 to the organization. The second project is worth $565,000 to the business. The organization can only do one of the projects and elects to do the second project for $565,000. What is the opportunity cost of this decision?

A.

$190,000

B.

$565,000

C.

$375,000

D.

$940,000

Full Access
Question # 34

Which one of the following statements best describes requirements prioritization?

A.

It is only used with the plan-driven approach to business analysis.

B.

It is only used with the change-driven approach to business analysis.

C.

It determines how requirements will be prioritized based on the most important stakeholders to the least important stakeholders.

D.

It determines how requirements will be prioritized and how those priorities will be used to define the solution scope.

Full Access
Question # 35

All of the following are inputs to the task assess organizational readiness except for which one?

A.

Enterprise architecture

B.

Solution Scope

C.

Stakeholder concern

D.

Risk register

Full Access
Question # 36

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise's vision, mission and goals. What element of ‘SMART’ goals would this objective refer to?

A.

Relevant

B.

Measureable

C.

Specialized

D.

Achievable

Full Access
Question # 37

Which one of the following is not a general technique that a business analyst may use in the requirements verification task?

A.

Structured walkthrough

B.

Acceptance and evaluation criteria definition

C.

Cost-benefits analysis

D.

Problem tracking

Full Access
Question # 38

Which of the following approaches describes the project management approach of refining requirements and project scope?

A.

Plan-driven

B.

Change-driven

C.

Iterative

D.

Progressive elaboration

Full Access
Question # 39

Which of the following are not appropriate for a plan-driven business analysis approach? Each correct answer represents a complete solution.

A.

Informal

B.

Face-to-face

C.

Ad hoc

D.

Formal

Full Access
Question # 40

A business analyst (BA) is modelling requirements to assist the stakeholders in visualizing the appearance and capabilities of a planned solution. What technique is the BA using?

A.

User stories

B.

Root cause analysis

C.

Prototyping

D.

Data flow diagrams

Full Access
Question # 41

An organization is planning to launch an exciting new service that has never been offered before. The expectations are that the service will be extremely popular with young families but, because the organization wants to keep it a secret until launch day. there is no way of knowing whether this is correct. Why does the business analyst (BA) suggest identifying high customer demand by young families as an "assumption?

A.

To assess the costs and benefits accurately

B.

To prove the idea is correct

C.

To manage the associated risks

D.

To provide a benchmark future change

Full Access
Question # 42

You are the business analyst for an organization and you're managing your stakeholders through the requirements validation activities. Your stakeholders are categorized by executives, functional managers, directors, end users, and customers. Which of these stakeholders are involved in the requirements validation

activities?

A.

All of the stakeholders

B.

Functional management

C.

Executives

D.

Customers

Full Access
Question # 43

Which basis for prioritization allows the project team to work initially with lower-risk requirements first?

A.

Quantitative ranking

B.

Positive risk ranking

C.

Relationship to other requirements

D.

Implementation difficulty

Full Access
Question # 44

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

A.

Demonstrate the functionality of the new CRM

B.

Reuse requirements models from each company

C.

Ensure all regulatory requirements are documented

D.

Create merged viewpoints of the requirements

Full Access
Question # 45

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

A.

Decision modelling

B.

SWOT analysis

C.

Mind mapping

D.

Functional decomposition

Full Access
Question # 46

A domain subject matter expert (SME) describes a scenario to the business analyst (BA) that may need to be considered for an impending change. The BA and domain SME sketch out the process model for this exception scenario for consideration. What action does the BA take?

A.

Capture and integrate this process model into other appropriate planned outcomes

B.

Plan an observation activity to gain a hands-on understanding of the situation

C.

Document the elicitation results then verify and validate in requirements review

D.

Review the issue with stakeholders during a follow-up session

Full Access
Question # 47

A business analyst (BA) is planning how to present a set of requirements for a project with financial constraints. Which requirements attribute should the BA assign to allow cost implications to be assessed?

A.

Status

B.

Complexity

C.

Ownership

D.

Source

Full Access
Question # 48

A business analyst (BA) is proposing design options and a number of opportunities are occurring that need to be understood further. One particular opportunity will prevent different stakeholders from performing the same function in distinctly different ways. What type of opportunity is this?

A.

Reduced barriers to entry

B.

improved access to information

C.

increased efficiency

D.

Additional capabilities

Full Access
Question # 49

A new Chief Executive Officer (CEO) is appointed to revive a chain of well-recognized superstores. The CEO wants to increase sales by introducing on-line shopping. Most stores are understaffed and maintenance is a challenge. Which of the following would be

considered an asset?

A.

Store maintenance expenses

B.

Brand reputation

C.

Interest mounting on bank loan

D.

Online shopping website

Full Access
Question # 50

Which tool will allow a business analyst (BA) to determine how information is input, processed, stored, and extracted from a collection of systems?

A.

Data Glossary

B.

Activity Flow

C.

Entity Relationship Diagram

D.

Data Flow Diagram

Full Access
Question # 51

A business analyst (BA) is assigned a new project and is beginning to prepare for elicitation. Which task must the BA complete before preparation of the elicitation process can begin?

A.

Coordinate meeting logistics

B.

Approve anticipated expenses

C.

Gather contact information of stakeholder

D.

Collect information on the business need

Full Access
Question # 52

A new contract requires a thorough level of documentation to be developed and maintained with planned phases of reviews and authorized sign offs. Which approach fits this contract?

A.

Waterfall

B.

Agile

C.

Scrum

D.

Iterative

Full Access
Question # 53

A general insurance company wants to enter a new segment that has the potential for high profit and little competition. The business analyst (BA) was asked to prepare a presentation for key stakeholders to show how the new segment will deliver value for stakeholders. Which of the following is best suited for this purpose?

A.

Capability analysis man

B.

Business architecture

C.

Business model canvas

D.

Business case

Full Access
Question # 54

The director of a furniture store manages a group of skilled carpenters who make furniture from locally available materials. The director decides to automate its inventory processes so that carpenters can place orders for raw materials themselves. A business analyst (BA) is engaged to define the requirements and propose options for commercial off-the-shelf (COTS) inventory management solutions. After meeting with the director, the BA needs to schedule a workshop with the carpenters to:

A.

investigate whether automation is a constant for the end user.

B.

demonstrate some of the proposed products to the end users.

C.

convey the benefits for the automation to the end users.

D.

present the proposed future state to the end users.

Full Access
Question # 55

A business analyst (BA) has elicited the following requirement; "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

A.

Nonfunctional requirements

B.

Stakeholder requirements

C.

Transitional requirements

D.

functional requirements

Full Access
Question # 56

A project team member is confused about why a small change requires the team to look at the different enterprise-level business objectives when a desired state can be achieved easily without this analysis. What can the business analyst (6A) do to help the team member understand?

A.

Impact analysis helps gain critical thinking to achieve the desired solution.

B.

Detailed assessments might result in future success of other projects

C.

Proper analysis from difference aspects in required to select the best solution.

D.

When funding is available for extra analysis the project team need to use it.

Full Access
Question # 57

An organization is experiencing long contracting life cycles when establishing annual contracts with its customers. Upon initial investigation, the outdated application was thought to be the cause, however based on further analysis the business process is found to be flawed. The business analyst (BA) wants to model the people involved in the process. Which of the following techniques models the responsibilities of these stakeholders?

A.

Roles and Permissions Matric

B.

Data Flow Diagram

C.

Use Cases and Scenarios

D.

Activity Flow

Full Access
Question # 58

A business owner has identified a high priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to perform an impact analysis of this change. Which factor will the BA need to consider?

A.

Number of systems being affected by the requirement

B.

Original source of the requirement

C.

Method of requirement communication

D.

Selection of the elicitation for the requirement

Full Access
Question # 59

A project is being initiated to enhance an on-line product because sales have declined for over a year. The company leader’s ant confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

A.

documenting the requirements.

B.

identifying the stakeholders.

C.

implementing a suitable solution.

D.

evaluating the business need.

Full Access
Question # 60

A business analyst (BA) has set up a number of elicitation workshops with key subject matter experts (SMEs) on a new project. All SMEs have accepted the workshop invitations except for the legal SME who has not responded to any invitations. The first workshop is scheduled for next week and the BA has tried unsuccessfully to reach the legal SME by phone. How should the BA proceed?

A.

Re-check the legal SMEs schedule and re-arrange all of the workshops based on vacancies in his or her public calendar

B.

Drop by the legal SMEs desk and have an informed chat about how important his or her involvement and input is on the project

C.

proceed with the first workshop and capture the non-response as a project issue for the project manager to address

D.

Escalate the non-response to the legal SMEs manager via email and request that they make the legal SME attend

Full Access
Question # 61

The Chief Information Officer (CIO) of a large financial services firm with many technology applications was formally reviewing all ongoing projects and noticed that the requirements were complex and difficult to follow. The CIO asks the business analyst (6A) what would improve the stakeholder's ability to understand the requirements. Which of the following will improve the requirements quality?

A.

Traceability matrices

B.

IEEE /ISO 29148 requirements standards

C.

Additional requirements attributes

D.

Matrix documentation formats

Full Access
Question # 62

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

A.

Confirm elicitation results

B.

Gain agreement on commitments

C.

Monitor stakeholder engagement

D.

Plan stakeholder engagement

Full Access
Question # 63

A business analyst (BA) is defining constraints for a project. Which of the following is a valid constraint?

A.

“The solution must be implemented in six (6) months.”

B.

“The solution must increase sales by 20%.”

C.

“The solution must promote workplace safety.”

D.

“The solution must reduce support calls by 20%.”

Full Access
Question # 64

A business analyst (BA) is working on an effort to upgrade a system to take advantage of new technology. Most of the end users with the business knowledge and IT staff with technical knowledge of the system are no longer with the company. What can the BA evaluate to better understand the extent of the effort?

A.

Benefits of upgrading the system

B.

Communication platform to be used

C.

Number of business areas impacted

D.

Collection of performance measures

Full Access
Question # 65

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

A.

Risk-neutral

B.

Risk-optimizing

C.

Risk-averse

D.

Risk-soaking

Full Access
Question # 66

The Chief Executive Officer (CEO) of a company presents a new corporate strategy that will introduce a new system to the organization. The CEO has expressed a concern about the impact to the staff once the strategy has been implemented. What must the business analyst (BA) do to address concerns of the CEO?

A.

Identify required cultural changes

B.

Perform a cost-benefit analysis of the strategy

C.

Ensure requirements are easily accessible

D.

Align the new capabilities to the company's architecture

Full Access
Question # 67

A business analyst (BA) is defining relationships between business requirements and solution components. Which guideline will the BA use to accomplish this?

A.

Change Strategy

B.

Solution Scope

C.

Solution Objectives

D.

Domain Knowledge

Full Access
Question # 68

Stakeholder requirements where approved for a business process reengineering initiative along with the Creation of a | roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

A.

Requirement performance measures

B.

Scope model

C.

Requirement description

D.

Requirement attribute values

Full Access
Question # 69

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company's needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

A.

Negative Impact to value

B.

Positive Evaluation Results

C.

Risk Tolerance

D.

Issue Management

Full Access
Question # 70

A lead business analyst (BA) has received negative feedback on the deliverables produced by BAs in the organization. A major concern was ambiguous requirements. What technique will help ensure business analysis information is clear and understandable?

A.

Choose appropriate format to communicate requirements

B.

Align test scenarios with business needs

C.

Ensure all requirements are testable

D.

Use checklists for quality control

Full Access
Question # 71

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

A.

are ether qualitative or quantitative measurements, but not both.

B.

align to industry benchmarks gathered for similar solution implementations.

C.

are written in the correct format. using the agreed standards and terminology.

D.

align with other measures within the broader context of the solution.

Full Access
Question # 72

After a number of requirements elicitation workshops, the business analyst (BA) notices that two business stakeholders did not speak up during any of the discussions. What should the BA do in the next workshop?

A.

Allow only the two stakeholders to speak, so that other stakeholders are able to hear their input.

B.

Proceed as normal, assuming that the two business stakeholders will speak up if and when they are ready

C.

Ask all attendees for their input, ensuring that each stakeholder is given time to speak and provide their opinion

D.

Omit the two stakeholders from the next meeting since they do not seem to be engaged or interested

Full Access
Question # 73

While planning the prioritization approach for an upgrade to a legal property application, the business analyst (BA) needs to check the organization's business policies prior to identifying the stakeholders to participate in the prioritization process. The business policies will help the BA because they:

A.

provide lessons learned from previous projects that should be incorporated into planning approach for current projects.

B.

Outline the organizational roles and responsibilities in an effort to define a prioritization approach that involves the correct stakeholders.

C.

describe industry regulations and are used to develop a framework for sound business decision making.

D.

define the limits within which decisions must be made in accordance with contracts, agreement warranties or certifications.

Full Access
Question # 74

A government agency has initialed a project to implement a customer registry that will be shared across multiple agencies. Early estimates indicate there will be hundreds of requirements. While determining the requirements traceability approach, what factor takes precedence?

A.

Number of defects

B.

Cost of tracing

C.

Number of stakeholders

D.

Cost of testing

Full Access
Question # 75

A business analyst (BA) wants to check the completeness of requirements defined after meeting with project stakeholders. A group of subject matter experts (SMEs) has been identified and invited to a workshop to walk through the requirements. What must the BA do to ensure a shared understanding of requirements?

A.

Align requirements to the organizational strategy

B.

Prioritize requirements according to expected stakeholders value

C.

Ensure requirements attributes are consistent for ease of access

D.

Determine the format to present the requirements to the SMEs attending the workshop

Full Access
Question # 76

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is: "As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school". The product owner wants to take advantage of this opportunity to provide the staff a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing scope?

A.

Add me functionality to the list of requirements

B.

Suggest that the story be included with a change to solution scope or be removed

C.

Ask product owner to rank this user story against the existing product backlog

D.

Review business objectives and determine potential value

Full Access
Question # 77

A senior manager wants to know at what stage the business analyst (BA) is with the requirements management process. The BA immediately sends a 600-page document with models and business rules to all stakeholders. Which best practice did the BA violate in this situation?

A.

The business rules were included

B.

The communication method was inappropriate

C.

The distribution included all project stakeholders

D.

The models were included

Full Access
Question # 78

A company has bought a customizable software product and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

A.

Develop a data model

B.

Create a process model

C.

Review data flow diagrams

D.

Observe the activity

Full Access
Question # 79

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. This approach helps to find out the following except for which one?

A.

Which stakeholders need to be involved in the decision?

B.

Who will be consulted regarding and informed of the approach?

C.

Who will be observed in job shadowing?

D.

What is the rationale for using it?

Full Access
Question # 80

A business analyst has determined that a project should be worth $2,750,000 in four years if her company decides to pursue the project. Assuming the rate of return on the investment is six percent, what is the minimum amount of funds the organization should invest in this project?

A.

$2,585,000.00

B.

$2,749,001.99

C.

$2,178,257.57

D.

$165,000

Full Access
Question # 81

Kelly is the business analyst for her organization and she's identifying roles and responsibilities of the people involved in business analysis activities. Her manager has asked Kelly to create the RACI matrix to accomplish this task. What is the RACI matrix?

A.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Action, Controlled, and Informed.

B.

The RACI matrix is a roles and responsibilities chart that uses the legend of Role, Action, Controlled, and Information.

C.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Accountable, Consulted, and Informed.

D.

The RACI matrix is a roles and responsibilities chart that uses the legend of Risk, Action, Cost, and Information.

Full Access
Question # 82

You are the business analyst for your organization and you're working to identify all of the stakeholders within your organization and outside

your organization to ensure that you've captured the correct requirements for a project. Which one of the following techniques can be best suited for identifying stakeholders?

A.

Interviews

B.

User stories

C.

Acceptance and Evaluation Criteria

D.

Risk analysis

Full Access
Question # 83

You are currently working on creating the activity list for an initiative in your organization. What characteristic must be assigned to each task in your task list?

A.

Procurement needs

B.

Risk level

C.

Unique number

D.

Roles and responsibilities

Full Access
Question # 84

When a business analyst prepares for elicitation, he must define the scope of the selected elicitation

technique, notify the stakeholders of the elicitation plan and technique to be used, and what other preparation activity?

A.

Schedule all needed resources.

B.

Create an elicitation plan.

C.

Define the solution.

D.

Perform stakeholder analysis.

Full Access
Question # 85

You are hired as a contract project manager for Dreams Unlimited Inc. The project involves setting up ten servers and fifty client computers on the network. From past experience, you know it takes around fifteen hours to install, test, and finalize a server, while it takes only ten hours for a client. You consider these data for making an estimate of schedule of the task. Which of the following estimation techniques has been used?

A.

Bottom-up

B.

Schedule performance index

C.

Parametric modeling

D.

Analogous

Full Access
Question # 86

Martha is the business analyst for her organization and she's been asked to help create a SMART goal for her company. Which one of the following organizational goals could be considered SMART?

A.

No errors in production of customer products.

B.

Increase revenue by ten percent by January 15.

C.

Increase revenue by ten percent.

D.

Add 25 new customers to the sales base.

Full Access
Question # 87

Karen is the business analyst for her organization and she's reviewing the tasks within her endeavor. Several of the tasks have the characteristic that the activity will be completed with the project stakeholders, consultants, and business analyst, though this hasn't yet been approved. What is this condition of believing some things to be true about an activity without proving the validity of the belief called?

A.

Risk

B.

Assumption

C.

Constraint

D.

Boundary

Full Access
Question # 88

You are the business analyst for your organization and you're creating the requirements package. In this documentation, to what level should you document the requirements for your stakeholders?

A.

All requirements should be clearly defined with technical, business, functional, and non-functional attributes.

B.

All requirements should be defined only to the extent needed to assure understanding by the team.

C.

All requirements should be defined to the extent the organizational process assets demand.

D.

All requirements should be defined in detail to the work package level of WBS.

Full Access
Question # 89

When you, a Business Analyst, work with your stakeholders, team, and experts to define the business analysis activities, what thing do you actually define?

A.

You define the requirements of the initiative.

B.

You define the roles and responsibilities.

C.

You define the communication needs.

D.

You define the business analysis approach.

Full Access
Question # 90

A business analyst wants to elicit requirements from a large group of stakeholders. One of her primary goals of this event is to produce a broad set of options for solutions. Which elicitation technique would you recommend for this business analyst?

A.

Business rules analysis

B.

Brainstorming

C.

Benchmarking

D.

Data flow diagrams

Full Access
Question # 91

You are the business analyst for your organization. You are currently writing the business goals and objectives as part of the elements for the define business process. Which one of the following statements best describes the business goals and objectives element?

A.

They describe all of the required work the project will need to complete in order to reach its objectives.

B.

They describe the ends that the organization is seeking to achieve.

C.

They describe the processes the solution will need to improve for the project to be successful.

D.

They describe all of the positive benefits in ratio to the risk and costs of the project.

Full Access
Question # 92

You work as a project manager for SoftTech Inc. You are working with the project stakeholders to begin the qualitative risk analysis process. You will need all of the following as inputs to the qualitative risk analysis process except for which one?

A.

Risk management plan

B.

Stakeholder register

C.

Project scope statement

D.

Risk register

Full Access
Question # 93

Anne is the business analyst for her organization and she's creating a textual requirement for her analysis. As part of the textual requirements, there are specific rules that Anne should follow. Textual requirements must always address what three things in regard to the requirements?

A.

Textual requirements must define the capabilities of the solution, conditions that must exist for the requirements to operate, and any constraints that may hinder the solution.

B.

Textual requirements must define the cost of the solution, organizational conditions that must exist for the requirements to operate, and any risks that may hinder the solution.

C.

Textual requirements must define the stakeholders' influence on the solution, relationships between opposing stakeholders, and any organizational constraints that may hinder the solution.

D.

Textual requirements must define the deliverables created by the solution, the conditions that must exist for the requirements to be completed, and the time and cost constraints that may hinder the solution's implementation.

Full Access
Question # 94

Robert is the business analyst for his organization and is preparing to host a workshop for twenty stakeholders. The goal of this workshop is to comprehensively identify the requirements for new software that will be created for Robert's organization. What must first be established in the workshop to ensure that the elicitation process moves smoothly?

A.

An understanding of the ground rules of the workshop

B.

An understanding of who are the most important stakeholders

C.

An understanding of the business opportunity

D.

An understanding of the requirements elicitation processes

Full Access
Question # 95

Which of the following is used to define and document the business analysis approach?

A.

Structured walkthrough

B.

Progressive elaboration

C.

Process modeling

D.

Decision analysis

Full Access
Question # 96

Jason is creating a business case for his organization and management has asked him to assess the appropriate risks in the business case regarding the solution. Which one of the following risks is not a concern for Jason when defining the business case and associated risks?

A.

Financial risk

B.

Positive risk

C.

Organizational risk

D.

Technical risk

Full Access
Question # 97

There are three inputs needed to determine the solution approach process. What are these inputs?

A.

Business need, organizational process assets, and enterprise environmental factors

B.

Business need, enterprise environmental factors, and required capability

C.

Business need, organizational process assets, and assumptions

D.

Business need, organizational process assets, and required capability

Full Access
Question # 98

You are a Business Analyst for your organization, and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Why is it important to complete the plan business analysis approach?

A.

This task describes the amount of time needed for the business analysis approach.

B.

This task describes the amount of budget needed for the requirements elicitation.

C.

This task describes how to select an approach for performing business analysis.

D.

This task describes the processes the business analyst will or will not do based on the time and budget available.

Full Access
Question # 99

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables. The inspector's signoff on the initial deliverables is called what?

A.

Constraint

B.

Assumption

C.

Dependency

D.

Milestone

Full Access
Question # 100

You are the business analyst for your organization and your requirements for the endeavor have recently been approved. Your organization creates a baseline for the requirements based on the approval of the requirements. What must happen in your business analysis activities if the requirements for your endeavor need to be changed?

A.

You'll need to create new baselines.

B.

You'll need to implement configuration management.

C.

You'll need to use a change control system.

D.

You'll need to create requirements versioning.

Full Access
Question # 101

Beth is a business analyst for her organization and she's discussing the solution with her key stakeholders. Beth is considering that moving to a new operating system, new office software, and new customized applications will be too much for the end users to learn and to manage their ongoing responsibilities. What task is Beth completing in this scenario?

A.

Manage the stakeholders.

B.

Evaluate solution performance.

C.

Define transition requirements.

D.

Assess organizational readiness.

Full Access
Question # 102

Which technique in organizing requirements is best described as showing the concepts and relationships relevant to the solution or business domain?

A.

Data flow diagram

B.

Business rules analysis

C.

Data modeling

D.

Functional decomposition

Full Access
Question # 103

There are three inputs to the business analysis planning approach process. Which one of the following is not one of the three inputs?

A.

Risk and rewards analysis

B.

Business need

C.

Organizational process assets

D.

Expert judgment

Full Access
Question # 104

Audrey is the business analyst for her organization and she's doing an assessment of the organization's readiness to implement the solution. In her assessment, she's finding that there are conflicting stakeholder groups for and against the proposed solution. Some of the stakeholders have more power over the solution than others. What diagram can Audrey create to visualize the people that are for and against the solution?

A.

Force field analysis diagram

B.

Tornado diagram

C.

Stakeholder matrix

D.

Pareto chart

Full Access
Question # 105

What do business goals and objectives of enterprise analysis actually describe?

A.

Business goals and objectives describe the increased revenue that the organization is seeking to gain.

B.

Business goals and objectives describe the solution scope that the organization is seeking to accomplish.

C.

Business goals and objectives describe the ends that the organization is seeking to achieve.

D.

Business goals and objectives describe the desired future state of problems.

Full Access
Question # 106

You are the business analyst for your organization and you're working with your team to define the business problem. As part of this analysis, you've identified the adverse impacts of the problem, the benefits from a

potential solution, and how quickly the problem could be solved. What other element should you consider?

A.

Vendors input and paid solutions

B.

Competition and their approach

C.

Dataflow of the problem

D.

Underlying source of the problem

Full Access
Question # 107

Some of the requirements in the solution must be completed because of laws and regulations in your industry.

Management would like you, the business analyst, to rank the requirements according to the relevant laws. What type of requirements prioritization is management having you complete?

A.

Business value ranking

B.

Risk ranking

C.

Constraint ranking

D.

Regulatory ranking

Full Access
Question # 108

Management comes to you and asks you to complete some specifications and models about the current state of the organization.

Management wants you to complete this business analysis activity as soon as possible and report back to them with your findings. What is the primary purpose of the specify and model requirements process?

A.

To analyze the roles and responsibilities of users within the organization to determine how the processes may be improved.

B.

To analyze the utility function within the organization to determine how risk tolerance may allow for new opportunities.

C.

To analyze the functioning of an organization and to provide an insight into opportunities for improvement.

D.

To analyze the processes of an organization to determine what processes can be improved, removed, or added.

Full Access
Question # 109

What element of the plan business analysis process affects the business analysis duties that need to be performed?

A.

The experience of the project manager

B.

The expected completion date of the business analysis duties

C.

The type of project or initiative

D.

The experience of the business analyst

Full Access
Question # 110

You are a business analyst in an organization that has recently embraced business analysis as part of its initiative for new projects. In this organization, there is not an organizational standard for tailoring business analysis duties and expectations. Which one of the following best describes the action you should take to begin business analysis?

A.

Work with the appropriate stakeholders to determine how the business analysis work should be completed.

B.

Define the organizational standard first.

C.

Create a business case for the need of organizational standards for business analysis.

D.

Take charge and begin the business analysis activities, but document your approach to serve as a template for future business analysis initiatives.

Full Access
Question # 111

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following are primary inputs of planning the business analysis approach?

Each correct answer represents a complete solution.

A.

Organizational process assets

B.

Penalty of not seizing the opportunity

C.

Expert Judgement

D.

Business need

Full Access
Question # 112

You are the business analyst for your organization. You're considering if you should make a solution or purchase it from a vendor. If your team creates the solution, it will cost $286,000 and will cost $2,400 per month to support. The vendor's solution, however, will cost $239,000 and will cost $2,850 per month to support. How long will you need to use your in-house solution to be more cost effective than the vendor's proposed solution?

A.

105 months

B.

32 months

C.

64 months

D.

19 months

Full Access
Question # 113

Which stakeholder(s) will be involved to determine if the requirements can be implemented?

A.

Domain subject matter expert

B.

Implementation subject matter expert

C.

Project team members

D.

Sponsor

Full Access
Question # 114

Which of the following is a business management strategy originally developed by Motorola, USA in 1986?

A.

Quality Circle

B.

Waterfall model

C.

Lean

D.

Six Sigma

Full Access
Question # 115

What should an organization do if the business analyst has determined that the existing capabilities are inadequate to seize an opportunity?

A.

Recommend that the organization launch a project to create the capabilities needed.

B.

Recommend that the organization not pursue the opportunity.

C.

Recommend that the organization hire contractors with the needed capabilities.

D.

Recommend that the organization share the opportunity with other organizations.

Full Access
Question # 116

You are the business analyst in your organization and you've just completed the assessment on three different proposed solutions. In your judgment, you don't think any of the solutions provide enough value to justify being

implemented. What should you tell the stakeholders?

A.

Choose the least costly solution.

B.

Ask for more time to find justification for the solutions.

C.

Terminate the initiative.

D.

Present each solution and allow the stakeholders to decide.

Full Access
Question # 117

You are the business analyst for your organization. You are coaching Tom about the different approaches to business analysis. Which type of business analysis approach has the most business analysis work at the beginning of the project or during the start of a project phase?

A.

Requirements-driven approach

B.

Change-driven approach

C.

Plan-driven approach

D.

Value-driven approach

Full Access
Question # 118

You are the business analyst for your organization. You've believed that your solution can actually be purchased from outside vendor rather than trying to create the solution internally. You decide to ask the vendor to provide a fee for their services based on the statement of work. What document will you give the vendor along with the statement of work?

A.

Request for quote

B.

Contract terms

C.

Request for proposal

D.

Purchase order

Full Access
Question # 119

You are the business analyst for your organization. You are working with several IT professionals to determine all of the connected systems in your organization. You are creating a mapping of the servers, workstations, printers, and other connected devices and their purposes for an analysis of how information is input, processed, stored, and output from each system. What business analysis process are you completing?

A.

Data flow diagram

B.

Data dictionary and glossary creation

C.

Prototype

D.

Networking topology mapping

Full Access
Question # 120

You are the business analyst for a large project for your organization. Your project has 65 stakeholders and this will greatly increase the complexity of the communication in this project. To demonstrate how complex this project and its communication will be, you show the management the number of communication channels in this project. How many channels exist in this project based on the number of stakeholders?

A.

4160

B.

4225

C.

65

D.

2080

Full Access
Question # 121

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are formed. Which one of the following best describes how requirements are formed?

A.

Stakeholders' needs, wants, and expectations

B.

Solutions-based approach

C.

Change-driven approach

D.

Risk and reward solution

Full Access
Question # 122

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings

Full Access
Question # 123

By which of the following is the performance of all requirements management and communication activities governed?

A.

Business analysis plans

B.

Business analyst

C.

Project manager

D.

Project sponsor

Full Access
Question # 124

You are the business analyst for your organization and you're working with several stakeholders to identify, manage, and approve requirements. Your organization requires using a plan-driven approach to business analysis and changing management. In this approach, who is most likely to approve changes to requirements?

A.

Change control board

B.

Requirements owner

C.

Project sponsor

D.

Project manager

Full Access
Question # 125

Which approach is used to focus on minimizing up-front uncertainty?

A.

Class-driven approach

B.

Change driven approach

C.

Solution-driven approach

D.

Plan-driven approach

Full Access
Question # 126

The business analyst (BA) recommended a new application be rolled out in phases. After reviewing alternatives, the project sponsor agreed. What does the BA expect to achieve by this approach?

A.

Increase stakeholder engagement

B.

Maximize allocation

C.

Maximize benefits

D.

Increase process validation

Full Access
Question # 127

A business analyst (BA) is in the process of eliciting requirements. It has been determined that not all requirements can be implemented by the project deadline due to complexity. What must the BA do to ensure maximum benefit for the stakeholders?

A.

Ensure users are trained based on requirements

B.

Apply quality control on requirements

C.

Utilize requirements documentation template

D.

Maintain requirements based on priority

Full Access
Question # 128

A business analyst (BA) was asked by the vice president (VP) to evaluate the organization's claims processing capability and recommend improvements. The VP agreed to the BA's recommended solution approach and identified an external vendor to develop the modernized claims processing system. Before contracting with the external vendor, the BA realized that the budget should be approved by the Chief Financial Officer. What was missed by the BA when performing stakeholder analysis?

A.

Attitude

B.

Roles

C.

Decision making authority

D.

Level of influence

Full Access
Question # 129

A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?

A.

Perform data modelling

B.

Conduct elicitation activities

C.

Meet with the sponsor

D.

Consult with the project manager

Full Access
Question # 130

A team of business analysts (BAs) identified policies that dictate how the organization grants paid time off for its employees and the associated business rules. What is this team of BAs trying to do?

A.

Analyze the benefits information

B.

Analyze the current state of the enterprise

C.

Identify hidden business rules

D.

Explore human resources documentation

Full Access
Question # 131

A business analyst (BA) has elicited requirements for a new system. A subset of these requirements refers to judging the performance of the system, such as efficiency, capacity, security, and scalability. What technique is used to examine and group these requirements?

A.

Functional decomposition

B.

Scope model

C.

Trace requirements

D.

Non-functional requirements analysis

Full Access
Question # 132

A business analyst (BA) identifies a design option that enhances the performance of the business by automating repetitive tasks that require multiple staff touchpoints to complete a single task. Which type of improvement opportunity is identified by the BA?

A.

Identify additional capabilities

B.

Increase efficiencies

C.

Reduce costs

D.

Improve access to information

Full Access
Question # 133

The business analyst (BA) has traced the requirements for the interaction between a customer and the new online ordering system. Besides enabling the BA to ensure quality of the requirements to stakeholders, tracing the requirements will also enable the BA to:

A.

show all of the decision points in the business process.

B.

illustrate the relationships between relevant requirements.

C.

capture all users that will be impacted by the project.

D.

detail the inner workings of the system being changed.

Full Access
Question # 134

A company is embarking on a software project in a heavily regulated domain. The client expects large upfront planning and detailed documentation for the project. The recommended approach for the project will be:

A.

adaptive.

B.

predictive.

C.

waterfall.

D.

scrum.

Full Access
Question # 135

A system owner calls the project team to inquire about a recent change in one of the requirements, and insists that the change was never requested. What should the project team do to investigate the issue?

A.

Record a defect for fixing

B.

Consult with the project manager

C.

Revert back the changes

D.

Check the audit history of changes

Full Access
Question # 136

A project's business requirements require that the new solution reduce the labor costs currently attributed to performing end of month accounting procedures. Currently the company routinely must pay overtime to meet the deadline. The business analyst (BA) has been documenting the process and wants to ensure that the approach to the process design is feasible for the staff who perform the end of month procedures. Which of the following stakeholders will provide this verification?

A.

Implementation subject matter expert

B.

Domain subject matter expert

C.

Operational support

D.

Project sponsor

Full Access
Question # 137

A business analyst (BA) is tasked with designing a method of ensuring that the requirements captured during the elicitation sessions satisfy the needs and expectations of the customer experience, within an initiative. The BA identifies a way that the stakeholder requirements can be structured to ensure realization of the desired customer experience. Which viewpoint describes the approach taken by the BA to structure the requirements?

A.

User interactions

B.

Business model

C.

Audit and security

D.

Business process model

Full Access
Question # 138

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Full Access
Question # 139

A passport agency has recently deployed an online system where customers can apply for, amend, and renew passports. The expected volumes have not been realized and as a result, the agency has not achieved the projected savings. A business analyst (BA) has been asked to investigate the potential causes of this shortfall by understanding the trends, patterns. and volumes at a detailed level. What method of requirements elicitation should the BA start with?

A.

Data Mining

B.

Mind Mapping

C.

Business Rules Analysis

D.

Interviews

Full Access
Question # 140

A certain stakeholder requirement has been analyzed and broken down into several solution requirements, each affecting a different IT system. After solution design, the business analyst (BA) receives feedback that

one of the IT systems will take longer than anticipated to implement. What requirements artifact or technique will assist the BA in better understanding the related requirements?

A.

MoSCoW prioritization

B.

Backlog management

C.

Requirements documentation

D.

Traceability matrix

Full Access
Question # 141

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

A.

Substantial

B.

Granular

C.

Prioritized

D.

Unambiguous

Full Access
Question # 142

A business analyst (BA) is validating requirements and has found that the design cannot be validated to support the requirements. Which of the following is creating this situation?

A.

Incorrect assumptions.

B.

Lack of requirements traceability.

C.

Missing requirements.

D.

Substandard solution design.

Full Access
Question # 143

Two business analysts (BAs) are working on a requirement elicitation activity. One BA comes across a checklist that contains stakeholder details such as who are involved, location, group dynamics that are to be considered before beginning the elicitation activity and seeks a clarification from the second BA. The other BA explains that these details, along with several other items mentioned in the checklist, are required to:

A.

select elicitation techniques.

B.

prepare stakeholders.

C.

secure supporting material.

D.

understand scope of elicitation.

Full Access
Question # 144

A business analyst (BA) is working to identity the business need, specifically the problems with the current state of a process. At which level of the enterprise can the BA identify problems with the current state?

A.

Bottom-up

B.

Top-down

C.

From external drivers

D.

From middle-management

Full Access
Question # 145

A business analyst (BA) is conducting a workshop with the purpose of analyzing a business process. Stakeholders of different business units are in attendance. Each stakeholder is able to explain their unit's contribution to the process, however, there is no end to end process owner who can provide a consolidated view. Which technique should the BA use to compare the stakeholder's inputs against each other in order to check for consistency and omissions?

A.

Schedule a follow-up workshop to give more time for additional input

B.

Create a use case scenario that describes the process step by step

C.

Develop a process model with swimlanes to highlight the handoff points

D.

Create a logical data model with the information elicited

Full Access
Question # 146

A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?

A.

Evaluate the new system against competitor applications

B.

Confirm the satisfaction of business requirements

C.

Conduct another survey to validate the original results

D.

Validate performance measures and alignment with KPIs

Full Access
Question # 147

A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK ® GUIDE, what will the BA need to do?

A.

Ensure high level user stories are completed and accepted

B.

Use an informal approval process to speed up delivery

C.

Use a rigorous approval process of detailed specifications

D.

Ensure the document is completed and signed off

Full Access
Question # 148

A business analyst (BA) is informing stakeholders about the importance of quality when eliciting requirements. What characteristic describes a quality requirement?

A.

Simplistic

B.

Consistent

C.

Critical

D.

Functional

Full Access
Question # 149

The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?

A.

To document the project's completion

B.

To define the analysis approach

C.

To verity the project's progress

D.

To ensure a shared understanding of the information

Full Access
Question # 150

An organization prefers to execute projects using an adaptive approach. However, the new project is much more complex than previously executed projects. What will the business analyst (BA) recommend?

A.

Select an extreme programming approach

B.

Review current approach with key stakeholders

C.

Follow a predictive approach

D.

Choose an agile programming approach

Full Access
Question # 151

A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:

A.

recommend a new methodology which is the latest trend in the industry.

B.

assign a different BA to the project.

C.

discuss the feedback during the brainstorming sessions after project completion.

D.

identify performance metrics before commencing work.

Full Access
Question # 152

A senior business analyst (BA) is tasked with verifying a set of requirements written by a junior BA for a

system. During this exercise, the junior BA will ensure that the requirements exhibit atomic characteristics. The senior BA will be verifying that the requirements:

A.

can be understood independently of other requirements.

B.

are written using terminology common for the audience.

C.

contain no extraneous and unnecessary content.

D.

are aligned with the identified need of the stakeholders.

Full Access
Question # 153

A company wants to increase its market share in the industry and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

A.

Redefine the business requirements associated with each implementation

B.

Recommend a reduction in the project scope

C.

Allocate requirements to different releases

D.

Ensure all requirements are traceable using a matrix

Full Access
Question # 154

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Full Access
Question # 155

A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics: Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?

A.

To verify requirements

B.

To measure solution performance

C.

To validate requirements

D.

To compare solution options

Full Access
Question # 156

A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?

A.

Cost

B.

Schedule

C.

Impact

D.

Urgency

Full Access