Summer Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

CORE PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CORE PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Supply Management Core Exam
  • Last Update: Sep 12, 2025
  • Questions and Answers: 312
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CORE Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CORE Practice Exam Questions with Answers Supply Management Core Exam Certification

Question # 6

An exploration firm's supply manager meets with the fleet operations team to plan for the acquisition of vehicles to be used in company operations on a remote Pacific island. As removing the old vehicles from the island has proven to be a significant problem, the team requests the inclusion of a "take-back" requirement in the contract. Which of the following is the BEST way for the supply manager to respond to this request?

A.

The supply manager should oppose the idea, as a take-back program from a remote island would be cost prohibitive.

B.

The supply manager should oppose the idea, as the sourcing process should be focused on acquisitions.

C.

The supply manager should refer the issue to the environmental quality manager.

D.

The supply manager should include this requirement in the firm's upcoming procurement.

Full Access
Question # 7

Supplier X is awarded an exclusive contract by a resort chain to supply bulk peanuts for the chain's snack bars. A contract is signed with the term to begin in three months and extend for two years. Pricing per shipment is to be determined by the average monthly price for the previous month, less a fixed discount rate. Before any orders have been placed against this contract, the resort chain’s supply manager finds that other suppliers are offering deeper discounts. How, If at all, can the resort chain avoid its commitment to Supplier X and save money by buying elsewhere?

A.

The resort chain can challenge Supplier X's method of determining domestic pricing.

B.

The resort chain can claim that, without a quantity term, there has been no agreement, and therefore no contract.

C.

The resort chain cannot avoid its commitment and is obligated to obtain its annual peanut requirements from Supplier X or be liable for damages.

D.

The resort chain can inform Supplier X that nuts are to be phased out of the snack bars in order to comply with stricter allergen regulations.

Full Access
Question # 8

A manufacturing firm which prides itself on excellent customer service, quality, and prompt delivery decides to outsource several of its high volume, cost-driven products. The firm's supply manager is tasked with ensuring that service level expectations are maintained during the transition. Which of the following is the BEST step for the supply manager to take to ensure a smooth transition?

A.

Promote supply management staff as examples of change leaders

B.

Emphasize the focus on relationship management to support customers

C.

Direct staff to concentrate on execution and teamwork

D.

Redesign the department for better end-to-end supply management

Full Access
Question # 9

A supply management department obtains executive support to adopt category management. Which of the following is a key step in establishing the categories to be managed?

A.

Developing a category management governance structure

B.

Conducting a Pareto analysis

C.

Developing category-specific action plans

D.

Conducting a spend and forecast analysis

Full Access
Question # 10

DEF, Inc. has a choice of several transportation providers in the immediate area. The firm decides to conduct a spend analysis to identify opportunities for cost savings through service standardization. In this situation, which of the following will be MOST Important for the company to analyze?

A.

Pricing for alternative travel modes such as rail and air

B.

Labor rates for frequently utilized locations

C.

Local laws and regulations regarding transportation

D.

Pricing at international locations

Full Access
Question # 11

The ability to explain how and why decisions are made in support of business plans is important because it allows a supply manager to

A.

influence internal stakeholders

B.

reduce the amount of needed input from key stakeholders

C.

align goals to supply management's mission

D.

prevent supply chain disruptions

Full Access
Question # 12

Which of the following is considered the HIGHEST level in a supply chain's strategic plan?

A.

Objective of the organization

B.

Commodity segmentation

C.

Supplier differentiation

D.

Acquisition planning

Full Access
Question # 13

A supply manager of a U.S. publicly listed company is conducting an internal audit of the procurement department to ensure compliance with applicable laws and regulations. Top management has communicated the importance of financial reporting and effective controls within the organization's procurement processes. In order to carry out the audit in alignment with top management's direction, the supply manager should be particularly familiar with which of the following?

A.

Uniform Commercial Code

B.

Sarbanes-Oxley Act

C.

Sherman Antitrust Act

D.

Federal Trade Commission Act

Full Access
Question # 14

A sourcing manager is negotiating a contract with a human resources supplier that has access to employee data, including social security numbers. The supplier proposes an annual cap of $10,000 on overall liability. In this situation, which of the following is the MOST important stakeholder for the sourcing manager to consult in regard to this supplier?

A.

Risk Management

B.

Operations

C.

Legal

D.

Information Technology (IT)

Full Access
Question # 15

Which of the following explains external category market conditions by describing competitive factors within an industry?

A.

SWOT analysis

B.

Request for information

C.

Supplier analysis

D.

Porter's Five Forces

Full Access
Question # 16

GHI, Inc. manufactures and sells high-end headphones. Each pair of headphones is packaged with a kit of customizable parts. GHI sources these customizable parts from a specialty supplier. Recently, GHI received a shipment of the parts from the supplier, and although the materials arrived on time, they were not bagged and labeled individually as the contract requires, but rather arrived in bulk.

GHI needs the parts as soon as possible to complete its holiday orders. Given this situation, which of the following is the BEST course of action for GHI's supply manager to take?

A.

Send GHI's quality team to the supplier's facility

B.

Have the parts properly packaged with the supplier's agreement to cover the costs

C.

Refuse to pay any invoice until the supplier corrects the mistake by repackaging the materials

D.

Return the materials as nonconforming items for replacement

Full Access
Question # 17

ABC, Inc. has a supply management department responsible for placing orders. In spite of this, a designer from ABC's engineering department places an order with Supplier X for several products.

When the shipment arrives, it is rejected by the receiving department, as they cannot verify the order with supply management. To avoid this situation, the designer should have

A.

notified the supervisor of the engineering department of the immediate need for the item

B.

requested supply management issue an "after the fact" purchase order

C.

coordinated product needs with supply management prior to order commitment

D.

delayed placing the order until after looking at comparable items from other suppliers

Full Access
Question # 18

A supply manager is drafting a request for proposal (RFP) for courier services. Which of the following requirements is MOST likely to affect external stakeholder satisfaction?

A.

Accuracy of invoices

B.

Fuel efficiency of delivery vehicles

C.

Liability insurance coverage

D.

On-time delivery

Full Access
Question # 19

A large manufacturing firm has offices across the country. The company wants to obtain the best price and reduce administrative costs associated with procuring office supplies. Which of the following would be BEST suited to the firm's needs?

A.

Blanket agreement

B.

Indefinite delivery contract

C.

Master purchasing agreement

D.

Manufacturing resource planning

Full Access
Question # 20

At what point in a business relationship with a supplier should discussions be held about which party has responsibility for specific costs, in the event the relationship needs to end?

A.

At any point in the relationship

B.

At no point in the relationship

C.

When the relationship needs to end

D.

In the beginning of the relationship

Full Access
Question # 21

A manufacturing company signs a cost-reimbursable contract with a new customer that needs a large volume of its product manufactured in a short period of time. The product is difficult and time consuming to fabricate. The contract provides generous flexibility for cost but has severe consequences if the deadline is missed. To ensure the timely completion of the contract, the manufacturer plans to negotiate with a lower-tier supplier for a critical sub-component.

Given this situation, which of the following negotiation objectives is MOST closely aligned with the interests of the manufacturing firm?

A.

Expediting fabrication and delivery of the sub-component

B.

Implementing enhanced quality inspections prior to shipment

C.

Achieving a 10% reduction in price

D.

Providing a 5% discount for prompt payment of invoices

Full Access
Question # 22

A procurement manager solicits bids for renovation of a building and writes a service level agreement. The agreement includes language regarding the proper disposal of waste. This is an example of a(n)

A.

regulatory requirement

B.

zead time requirement

C.

cost goal

D.

engineering specification

Full Access
Question # 23

Parts characterized by high cost/value and low technical complexity are categorized as

A.

specialized

B.

custom

C.

off-the-shelf

D.

standardized

Full Access
Question # 24

A product is approaching end-of-life, and the firm is considering its various options. While long-term, ongoing conflicts have occurred between the current supplier and the buying organization, there are few other supply options available for this particular component. In this situation, which of the following is the BEST course of action for the firm to take to ensure continued supply?

A.

Instruct accounts payable to pay supplier invoices in advance

B.

Make the component in-house

C.

Attempt to resolve conflicts with the existing supplier to maintain continuity of supply

D.

Have the legal department instruct the existing supplier to comply with the contract terms

Full Access
Question # 25

Developing a category management plan can BEST be accomplished by

A.

speaking with a supplier account manager

B.

searching the internet and obtaining articles about the category

C.

collecting spend data and business strategy from stakeholders

D.

meeting with management to learn more about the category

Full Access
Question # 26

A supply manager is preparing the department's budget for the next year. Which of the following is the FIRST step in this process?

A.

Controlling expenditures during the budgetary year

B.

Reviewing the organization's goals

C.

Defining the needed resources

D.

Presenting the budget for review

Full Access
Question # 27

A supply management team reviews all documents dealing with processes and procedures for the supply management function. Each team member reviews the documents and reports back to the group on the accuracy of the information, particularly concerning financial transactions. Any discrepancies are documented, updated, and submitted to senior management for approval. Which of the following is the MOST important legal requirement for this activity?

A.

Ensuring processes meet the requirements of Sarbanes-Oxley and similar laws

B.

Ensuring processes address issues and requirements of contract and commercial laws

C.

Ensuring processes adhere to requirements of anti-corruption/anti-bribery laws

D.

Ensuring processes address the concerns of the legal team on intellectual property laws

Full Access
Question # 28

A supply manager Is conducting the following activities:

•Mapping between category codes and category maps

•Normalizing supplier information

•Performing supplier mapping

•Refining mapping with financial systems data

Which of the following is the supply manager engaged in?

A.

Risk analysis

B.

Spend analysis

C.

Market analysis

D.

Cost/price analysis

Full Access
Question # 29

Which of the following is MOST important to review before employing a low-cost country sourcing (LCCS) strategy in a remote region located in a distant geographical location?

A.

Litigation and arbitration laws

B.

Geo-political risks

C.

Access to basic infrastructure needs

D.

Unemployment and crime in the region

Full Access
Question # 30

A U.S. firm receives several blds for a piece of specialized testing equipment. A supplier from Japan quotes a price of 360,000 Yen. If the current exchange rate is 90 Yen per U.S. Dollar, what will the price be in U.S. dollars?

A.

$3,240

B.

$40,000

C.

$32,400

D.

$4,000

Full Access
Question # 31

FGH, Inc. has purchased components from Supplier A for many years. The supplier's performance has been very good, with reliable deliveries and consistently high quality. As contract renewal approaches, Supplier A informs FGH's supply manager that a significant price increase is anticipated, based primarily on the costs of building a new production facility. The supply manager has been directed to negotiate a new contract with Supplier A only if it agrees to maintain current pricing. Which of the following is the BEST way for the supply manager to prepare for negotiations with Supplier A?

A.

Determine if the parts made by Supplier A can be produced elsewhere

B.

Discuss alternate product designs with engineering

C.

Enlist FGH's executive management to participate in negotiations

D.

Research into whether Supplier A's recent expansion costs are reasonable

Full Access
Question # 32

A supply manager is seeking waterproofing consulting services to be used in the construction of a critical materials warehouse. It is the firm's first time procuring this type of service. Given this situation, the supply manager would be BEST served by

A.

preparing a flexible scope of work

B.

Identifying preferred consultants

C.

hiring a staffing agency

D.

subcontracting the work to the general contractor

Full Access
Question # 33

A machining company outsources its recycling program to a third party. The third party recycles the metals from the production area, but neglects to recycle the aluminum cans from the break room, as this stipulation was not included in the service-level agreement. This situation is MOST likely a result of the supply manager's failure to have an appropriate

A.

scope of work

B.

performance goal

C.

warranty

D.

conflict management plan

Full Access
Question # 34

A supply manager Is seeking potential suppliers to recreate a now obsolete custom component. The supply manager identifies five suppliers who have the technology to manufacture the part. The supply manager wants to understand the capability of these suppliers prior to bidding. Which of the following should the supply manager use in this instance?

A.

Collaborative optimization

B.

E-Design

C.

E-RFx

D.

E-Sourcing

Full Access
Question # 35

A supplier's willingness to deal with rejected materials, fill surges in orders, and provide technical support will be MOST affected by which of the following?

A.

Creating teaming agreements with suppliers

B.

Negotiating Inclusive terms and conditions

C.

Maintaining good supplier relationships

D.

Including such conditions in the statement of work

Full Access
Question # 36

Which of the following is the FIRST step in developing a negotiation plan?

A.

Engage with the internal customer and other internal stakeholders to identify their needs and wants, as well as educate them as to how supply management can add value in the negotiation process

B.

Engage in an analysis of the organization's risk tolerance, and review the key suppliers' capabilities, financials and legal and regulatory compliance, as well as the risks of supply chain disruption

C.

Review the organization's logistics category strategy by analyzing anticipated spend, how the renewal will affect purchasing leverage with other suppliers, and the current characteristics of the supply market

D.

Identify the most advantageous payment terms for the renewal through an analysis of buyer and seller cash flow considerations, early payment discount opportunities and potential third-party financing options

Full Access
Question # 37

During negotiations, each side adopts a point of view, and then both parties work to close the gap by exchanging concessions. Which of the following tactics is being used?

A.

Positional bargaining

B.

Logical reasoning

C.

Power and influence

D.

Relational persuasion

Full Access
Question # 38

A foundation maintains ongoing relationships with agents in several remote locations. The agents are recruited to serve as instructors for the foundation's microbusiness development program. The foundation's supply manager learns that one of the agents has gone outside the defined area of responsibility by having repairs made to the local office after a storm. The agent explains that the building was unusable and potentially dangerous, and had to be repaired. The agent tried to contact the foundation headquarters to request approval for the repairs, but communications were down. Which of the following is the BEST course of action for the supply manager to take?

A.

Reprimand the agent in writing, and consider termination if the agent oversteps authority again

B.

Require the agent to bear the cost of all repairs made without approval

C.

Create a new reporting structure for satellite offices to mitigate communication problems

D.

Ratify the action and authorize payment for repairs made at the agent's direction

Full Access
Question # 39

A supply management department is asked to obtain lower prices from suppliers. Through its efforts, the department manages to achieve a 5% reduction in indirect spend categories. However, some stakeholders request more items, keeping total expenditures about the same despite lower per-item costs.

Which of the following will be the BEST long-term approach for supply management to improve upon this situation?

A.

Refrain from processing orders for additional items unless there is a compelling justification

B.

Report the problem to top management, citing the departments with the poorest records

C.

Work with leadership to implement a more effective demand management program

D.

Accept additional orders only if the requesting department has at least a 5% overall reduction in spend

Full Access
Question # 40

MNO, Inc. has been one of XYZ Company's most valuable customers for a number of years. During a formal competitive bid event for a new product introduction, MNO becomes a supplier to XYZ. In this situation, which of the following should be of GREATEST concern to these organizations?

A.

Progress reports

B.

Conflict resolution

C.

Reciprocal relationship

D.

Customer feedback

Full Access
Question # 41

XYZ Inc. is a chemical manufacturing company. XYZ requires high levels of consistency and precision from certain suppliers in their machining work. In order to drive continuous improvement with these suppliers, XYZ should develop KPIs to track performance in which of the following areas?

A.

Cost

B.

Quality

C.

Cycle Time

D.

Service

Full Access
Question # 42

Which of the following is the BEST long-term strategy for creating top line revenue growth and increased sales for both an organization and its key suppliers?

A.

Identifying low cost options for high volume components

B.

Reaching out to suppliers for innovative ideas on products and services

C.

Reviewing current scope of work (SOW) standards with suppliers

D.

Asking sales and marketing for the latest information on industry trends

Full Access
Question # 43

A legal protection that covers an invention, the discovery of a process, or a machine or method of manufacturing, is known as a

A.

design patent

B.

copyright

C.

utility patent

D.

plant patent

Full Access
Question # 44

As interest rates rise, what will MOST likely be the effect on supply?

A.

Suppliers will lock in raw material prices in anticipation of price increases.

B.

Suppliers will delay shipments by selling to other customers.

C.

Bond prices will rise, forcing suppliers to pay more for capital investments.

D.

The risk of supplier stock outs will increase due to higher costs of holding inventory.

Full Access
Question # 45

A service provider has experienced diminished value and stagnant results within an important category. Which of the following is the BEST course of action the firm can take to improve the category strategy?

A.

Open existing contracts and retender them

B.

Network with suppliers and launch RFIs to look at alternative solutions

C.

Conduct category rotation to bring a different viewpoint to the management of the category

D.

Conduct an in-house survey with key stakeholders

Full Access
Question # 46

PQR, Inc. is a small manufacturing firm that is rebuilding its customer base after emerging from bankruptcy. PQR now projects growing demand for its products. PQR's supply manager is planning negotiations with a key supplier that has worked well with the firm in the past. Which of the following is the STRONGEST factor the supply manager can use to improve PQR's negotiating position?

A.

There is considerable competition among suppliers.

B.

Delivery schedules can be more flexible than in the past.

C.

PQR has a reputation for innovation in its industry.

D.

PQR wants to enhance long-term supplier relationships.

Full Access
Question # 47

Which of the following BEST describes the strategic sourcing process?

A.

The issuing of materials according to a schedule or to a job at its start time

B.

An analysis of the expected demand, supply market, and specific suppliers used by the organization

C.

The solicitation and evaluation of bids and proposals to meet the organization's material needs

D.

A series of actions to identify suppliers to provide needed products/services for the organization

Full Access
Question # 48

When developing a sourcing strategy, which of the following is the BEST source of data on the spend profile of a category?

A.

A sales representative from the supplier

B.

An internal stakeholder

C.

Information from an internal database

D.

The Internet

Full Access
Question # 49

To weigh the benefits and risks of outsourcing a function, a supply manager conducts due diligence from cost, cultural, and service perspectives. The skills the supply manager is employing can BEST be described as

A.

project management

B.

technical knowledge

C.

analytical problem solving

D.

functional interaction

Full Access
Question # 50

An organization is preparing its budget for the next fiscal year. Management challenges the procurement team to reduce MRO purchasing costs. The procurement team has reduced the janitorial services budget by 2.5%, but corporate management wants a 5% reduction. Which of the following is the BEST approach for the team to take in order to meet management's expectation?

A.

Demand that the current supplier reduce costs to meet the required budget

B.

Contact the current supplier and develop a solution to reduce costs

C.

Send out a request for quotation (RFQ) to all possible qualified suppliers

D.

Conduct a root-cause analysis, and then negotiate with the current supplier

Full Access
Question # 51

A chief procurement officer (CPO) is asked by the company corporate travel department to present strategies and tactics related to the acquisition of travel services. Which of the following approaches will BEST demonstrate an understanding of the travel department's needs?

A.

Presenting benchmarks on the average costs of domestic and international airline tickets, to employ during negotiations over airline contracts

B.

Highlighting the negotiating of airline contracts, given that air travel represents the largest element of the budget and other travel spend categories are less important and harder to control

C.

Focusing on supply (e.g. airlines, hotels) and demand (e.g. company travel policy, classes of travel), and how supply management can optimize both

D.

Emphasizing the company-wide implementation of a corporate card as a tool to monitor every aspect of the travel spend

Full Access
Question # 52

A corporation acquires a startup company, with the objective of branching out into a new product line. The firm's procurement team needs to enlarge the supply base in order to meet the new production requirements. Which of the following is the BEST way for the team to ensure suppliers are aligned with organizational goals?

A.

Contact current suppliers to determine their maximum production capacity at the necessary quality levels

B.

Conduct market research to Identify characteristics needed by potential suppliers

C.

Facilitate meetings between internal stakeholders and external stakeholders

D.

Compare the firm's vision and mission to potential suppliers' capabilities

Full Access
Question # 53

A supply manager is leading a negotiation team. This team will negotiate with several finalists supplying complex services. Prior to the negotiations, the supply manager briefs the team on strategies, roles and responsibilities. The team members seem to understand the importance of these factors, but shortly after the negotiations commence, several members begin to make mistakes such as arguing witF each other and failing to pay attention. Which of the following is the BEST course of action for the supply manager to take at this point?

A.

Call a caucus and reiterate the negotiation rules and their Importance In interactions with suppliers

B.

Remove the offending stakeholders from the negotiations, as they are not following the instructions

C.

End the negotiations and begin another round with different team members

D.

Contact the team members’ supervisors and express concern over the way they acted during the negotiations

Full Access
Question # 54

A supply manager Is leading a team in developing a strategic sourcing strategy for the company's corporate-wide desktop and laptop computer procurement. Several business unit managers get into a heated debate over the relative Importance and exposure of desktop computers for their specific business units. Some units consider the desktop computer to be a low risk/low value commodity, while others consider them to be high risk/high value critical items. How should the supply manager proceed?

A.

Conduct a regression analysis to more accurately assess the risk and value of the desktop computers

B.

Develop a desktop computer sourcing strategy based on medium risk and medium value

C.

Tell the business unit managers to come to an agreement on the risk and value assessment of the computers

D.

Divide the desktop computers into two groups: one high risk/high value, and the other low risk/low value

Full Access
Question # 55

DEF, Inc. conducts a Request for Information (RFI) to identify suppliers who will be invited to participate in a Request for Proposal (RFP) for technical support. The RFI requires audited financial statements. DEF receives an inquiry from a publicly traded supplier asking if their 10K statement will suffice, and a privately held supplier states that it will only provide its audited financial statement after receiving a nondisclosure agreement from DEF.

Given this situation, which of the following is the BEST course of action for DEF to take?

A.

Issue a revision to the current RFI listing alternate methods and conditions acceptable in demonstrating financial health

B.

Maintain the requirement for audited financial statements so that all respondents are graded on the same basis

C.

State that DEF reserves the right to use information other than that received in response to the RFI to evaluate respondents' financial condition

D.

Negotiate with all respondents for more financial information

Full Access
Question # 56

GHI, Inc. is a manufacturer of batteries. GHI's supply manager reads an industry publication describing a new innovation from DEF Company that extends battery capacity, which could be of tremendous benefit to GHI. DEF happens to be a supplier to GHI, and yet DEF's sales representative has never mentioned the innovation to the supply manager. In order to strengthen the business relationship and enhance future collaboration between GHI and DEF, the supply manager should

A.

enter into a strategic alliance

B.

launch a joint process improvement program

C.

conduct comprehensive business reviews

D.

implement a supplier forum

Full Access
Question # 57

A supply manager for an electronics distributor is asked to buy new routers for the company's wireless network. The supply manager is provided with a detailed scope of work and a list of potential bidders. However, the firm is also interested in investigating alternative solutions available on the market. The original equipment was purchased over 5 years ago and the budget is unknown, but it is roughly estimated at $250,000.

Given these circumstances, the MOST appropriate approach for the supply manager would be to issue which of the following?

A.

Request for quote

B.

Invitation to bid

C.

Request for proposal

D.

Request for information

Full Access
Question # 58

Which of the following is the MOST important function within category management?

A.

Implementing a standardized sourcing process

B.

Mandating the evaluation of performance

C.

Centralizing the administration of contracts

D.

Searching for potential sources of supply

Full Access
Question # 59

Rebates are considered part of which of the following types of cost management?

A.

Cost avoidance

B.

Cost reduction

C.

Cost mitigation

D.

Cost containment

Full Access
Question # 60

For many years, BCD Inc. has purchased electronic assemblies from Supplier X. Based on Supplier X's past reliability, BCD eliminated incoming inspection of these assemblies several years ago. Recently, increasing quality problems have emerged, causing significant delays in BCD's manufacturing process. BCD's supply manager believes Supplier X is falling behind the market in technological advances and wants to assess the market for new opportunities. Given this situation, which of the following should the supply manager do FIRST?

A.

Begin the seven-step strategic sourcing process

B.

Begin a supplier quality improvement process with Supplier X

C.

Present a global business case for another supplier, as the market for the assemblies is international

D.

Conduct a value analysis of the assemblies to present to BCD’s and Supplier X's management

Full Access
Question # 61

A bottleneck supplier consistently poses a risk of shutting down a company's production lines due to delivery issues. Which of the following is the BEST long-term solution to this problem?

A.

Conduct daily meetings with the supplier to manage its production schedule

B.

Pay expediting fees to get the parts from the supplier delivered sooner

C.

Impose financial penalties on the supplier each time the firm is negatively impacted by overdue parts

D.

Qualify more suppliers who can deliver the same product

Full Access
Question # 62

The price of raw materials for a critical product is highly volatile. The supplier will not commit to long-term pricing due to the dramatic swings of raw material price. In this situation, the buying

organization should

A.

find another supplier for the product who can propose a method to manage volatility

B.

source the material itself to get better pricing directly from the raw material manufacturer

C.

demand that the supplier maintain pricing for a longer period of time to mitigate the raw material price swings

D.

allow the supplier to change pricing on a fixed schedule based on a price index with a maximum allowable change

Full Access
Question # 63

Motivated by public relations considerations, a company decides to insource the manufacture of a major product. This decision was MOST likely made to bring about

A.

improved community ties

B.

increased profit margins

C.

shorter lead times

D.

decreased product risk

Full Access
Question # 64

A firm wants to leverage supply contracts by making maintenance, repair, and operations (MRO) supplies available to all of its subsidiaries. Which of the following is the MOST efficient and cost-effective way to provide product details to potential users?

A.

Require suppliers to provide secure ordering portals tailored to specific contracts

B.

Conduct train-the-trainer sessions for supply management staff at the subsidiaries

C.

Create internal online catalogs with ordering instructions and links to suppliers' sites

D.

Email a list of suppliers' websites to contacts at each subsidiary

Full Access
Question # 65

A company currently has contracts with several temporary labor suppliers with detailed requirements for the same skill set. The hourly rates charged by each of these suppliers vary widely. The firm wants to have all temporary labor services provided by one supplier at the lowest possible cost. Given this situation, which of the following is the BEST course of action for the firm to take?

A.

Conduct a reverse auction with a clear statement of work

B.

Transition the services to direct employees

C.

Issue a request for proposal (RFP) to preselected suppliers

D.

Negotiate for lower pricing with one of the suppliers

Full Access
Question # 66

A company's major supplier of sub-assemblies provides excellent quality and reasonable costs. However, shipping delays and damage in transit make this supplier less reliable than desired. The supply manager would like to retain this supplier if possible, but is concerned about the reliability issues. Given this situation, which of the following is the BEST course of action for the supply manager to take?

A.

Negotiate lower prices to compensate for the impact of delivery problems

B.

Collaborate with the supplier to improve its outbound logistics

C.

Increase forecasting lead times and safety stock for the supplier's products

D.

Give the supplier a deadline by which to remedy unsatisfactory performance

Full Access
Question # 67

A supply manager issues a Request for Quotation (RFQ) for software development services. Two suppliers respond to the solicitation, and both suppliers' quotes are well above the target range. In this situation, which of the following is the FIRST course of action the supply manager should take?

A.

Postpone any negotiations with the bidders and ask the firm's stakeholders to look for ways to reduce the project scope

B.

Share the target range with the providers and ask for requotes

C.

Use a BATNA option and look to develop the software in-house

D.

Negotiate with both suppliers to attempt to meet the target cost

Full Access
Question # 68

ABC, Inc. Is a large accounting partnership with member firms In 120 countries. ABC's international sourcing team is responsible for establishing contracts with the company’s suppliers around the world.

While the quality of negotiated and executed contracts remains impeccable, the sourcing team has received numerous complaints about delays in processing contracts. The delays primarily occur at the contract execution stage, when the assigned sourcing specialist must obtain internal approvals from multiple parties, including international suppliers and member firms. Because of these delays, suppliers must wait until a contract is duly executed before they can start providing services, which has a significant impact on the member firms' commitments to their clients.

Which of the following is the BEST course of action for the sourcing team to take to address this issue?

A.

Allow suppliers to start the implementation of services as soon as they reach an agreement in principle, and formalize the paperwork later on

B.

Subscribe to a digital signature service and execute contracts online, rather than sending the paperwork overseas via courier

C.

Hire additional sourcing staff to manage the volume and reduce delays, and have the member firms cover the extra budget

D.

Allow member firms to execute contracts directly with their suppliers, in order to avoid processing delays

Full Access
Question # 69

Which of the following is the PRIMARY benefit of supply base rationalization?

A.

With fewer suppliers, the chances of purchase order errors are decreased.

B.

With fewer suppliers, fewer supply management personnel are required.

C.

With fewer suppliers, the chances of larger volume discounts are increased.

D.

With fewer suppliers, fewer quality issues are to be expected.

Full Access
Question # 70

A supply manager ensures that each stage of the negotiation process is documented, beginning with the preparations for the negotiation. What is the PRIMARY purpose of maintaining such information?

A.

To identify weaknesses in the supplier's position

B.

To clarify specifications and performance expectations

C.

To provide justification for any concessions made

D.

To ensure team members have accurate data

Full Access
Question # 71

XI Corporation awards a contract for the building of a prototype critical to its introduction of a new product line. To protect itself against delays and unsatisfactory quality, which of the following is MOST appropriate for Xi's supply manager to require from the contractor?

A.

Performance bond

B.

Letter of credit

C.

Earnest money

D.

Payment bond

Full Access
Question # 72

A sourcing manager is asked by a stakeholder to purchase electronic signature software. To avoid additional license fees, the stakeholder wants an inclusive price covering all of the software's functionality. However, the budget available for the purchase is limited, and an all-inclusive package will drive up price. Given this situation, which of the following is MOST important for the stakeholder to provide before the sourcing manager contacts potential suppliers?

A.

The complete project timeline

B.

A list classifying software functions as either "must have" or "nice to have"

C.

An explanation of why the avoidance of additional license schedules is justified

D.

A complete list of software functionality

Full Access
Question # 73

A team from RST, Inc. is conducting a negotiation session with a supplier. During the session, RST's lead negotiator perceives that various members of the supplier's team are being evasive on the issue of the supplier's capacity to handle the project. However, there is no apparent sign that the other members of RST's team share this perception. Given this situation, which of the following is the BEST course of action for the lead negotiator to take?

A.

Continue the negotiation session, but be sure to discuss the concerns with colleagues before any additional sessions are scheduled or any deal is executed

B.

Request a caucus, discuss the concerns privately with the team, and obtain their Input before deciding whether (and how) to proceed

C.

Call for a suspension of the session, and leave open the possibility of rescheduling it for a later date, after the supplier's capacity can be investigated

D.

Continue with the negotiation session, as concerns over supplier capacity are generally handled in the warranties section of the contract

Full Access
Question # 74

Which of the following is the GREATEST benefit of inviting suppliers to visit the buyer's facility?

A.

Attendees can see how their products are used in the buying company's products.

B.

Attendees have a chance to analyze and benchmark against the competition.

C.

Attendees are given insight into new initiatives and strategic imperatives.

D.

Attendees can meet the customer's supply management team.

Full Access
Question # 75

For several years, an environmental services company has contracted on a single-source basis with a supplier that offers highly specialized testing procedures. The supplier’s performance is excellent, but it has Instituted frequent rate increases. The company’s supply manager is under pressure to reduce costs wherever possible, but developing other sources will be time-consuming. Given this situation, which of the following actions should the supply manager take FIRST?

A.

Negotiate a maximum yearly limit on price increases with the current supplier

B.

Issue an RFI to identify other potential sources

C.

Perform a 'should cost' analysis of the current supplier's pricing

D.

Inform the current supplier that the contract will be terminated If it does not reduce prices

Full Access
Question # 76

Which of the following is a factor to be considered in a Total Cost of Ownership analysis for fleet automobiles?

A.

Disposal

B.

Regulations

C.

Income

D.

Indemnification

Full Access
Question # 77

When developing a category management plan, which of the following is the BEST reason for soliciting cross-functional input?

A.

It facilitates Input from stakeholders and other functional areas to ensure a long-term solution.

B.

It provides an opportunity to demonstrate non-linear leadership.

C.

It allows the category manager to gain important insights from the supply management team.

D.

It enables the category manager to resolve conflicting views and priorities for goods or services.

Full Access
Question # 78

XYZ, Inc. currently has a transactional relationship with suppliers, but would like to work strategically with them. The firm wants to initially focus attention on the most critical suppliers. To do this, they should FIRST reach out to

A.

suppliers with the highest dollar sales volume

B.

suppliers with whom the firm rarely or never has face-to-face meetings

C.

suppliers with the highest unit volume

D.

suppliers rated as vital according to key department metrics

Full Access
Question # 79

Which of the following Is a strategic deliverable whereby proactive steps are identified in order to execute tactical-level actions within the sourcing process?

A.

Supplier forum

B.

Category management plan

C.

Benchmarking

D.

Business review

Full Access
Question # 80

A supplier is awarded a contract to network all of a buying company's production and forecasting applications. The supplier completes the work on time. However, follow-up tests by the buying organization's IT department determine that performance does not meet contract specifications. Given this situation, which of the following is the BEST course of action for the buying firm to take?

A.

Review the contract warranty terms and remedies

B.

Accept the network and sign a maintenance contract to fix the problems

C.

Have another supplier review the network to estimate the cost of repairs

D.

Have IT attempt to repair the network so it works correctly

Full Access
Question # 81

Due to growth, a private school system finds that its costs for support, including maintenance and janitorial services, have increased dramatically. Though supply management generally does a good job in managing service contracts, there Is no strategic plan or systematic method for reviewing costs on a long-term basis.

The school's board has made the development of a strategic plan the supply manager's priority assignment for the next school year. Given this situation, which of the following should be the supply manager's FIRST step in developing this plan?

A.

Determine how supply management can minimize costs and reduce risks

B.

Create specific goals and objectives for addressing changes in how support services are to be managed

C.

Meet with the board chair to discuss organization-level strategies impacted by support services

D.

Identify opportunities to make specific changes In the purchasing and contracting processes

Full Access
Question # 82

Which of the following refers to a matrix that reflects the segmentation of spend based on an assessment of the value of the spend relative to the market risk to acquire?

A.

Evaluation matrix

B.

Keiretsu matrix

C.

Determination matrix

D.

Kraljic matrix

Full Access
Question # 83

Of the following, the BEST way for supply management to effectively support stakeholders is to ensure that

A.

communications with stakeholders are held face-to-face

B.

stakeholders are regarded as equally important

C.

goals are given precedence over a team environment

D.

communications are tailored to each stakeholder

Full Access
Question # 84

During negotiations with a supply manager from FGH Inc., a supplier states that if FGH buys the 200 gigabyte version of its software package at a price of $700, the supplier will include a never-before-sold malware license valued at $147. FGH needs both the malware and the software package. If the supply manager agrees to the offer, FGH may claim a

A.

cost savings

B.

cost variance

C.

cost avoidance

D.

cost reduction

Full Access
Question # 85

A commodity manager at company headquarters is given responsibility for consolidating spend among all the company's locations, with the goal of leveraging larger volumes. The manager collects data on spend categories, analyzes the information by supplier and type of material, and sends out goals for combining spend and reducing the number of suppliers. Several locations express reluctance to participate, saying that their needs for quality and delivery of critical parts have not been taken into consideration. Based on this situation, which of the following errors was MOST likely made by the commodity manager?

A.

Data were collected for too short a period of time.

B.

Sourcing files were insufficiently documented.

C.

Stakeholder Input was not sought or considered.

D.

Analysis factors were poorly chosen.

Full Access
Question # 86

A director of supply management is tasked with determining where savings can be found in indirect cost categories. If needed, the company will consider hiring additional staff to negotiate and administer contracts. Which of the following is the FIRST step the supply manager should take?

A.

Assess skills already available in supply management

B.

Identify a cross-functional team to brainstorm solutions

C.

Develop a new supplier relationship model

D.

Establish a baseline using current spend data

Full Access
Question # 87

A product's labor content is $10 and its overhead is $12.50. The product sells for $36.50 per unit. Over the past year, supply management has reduced the product's cost of materials from $14 per unit to $12.

How much have supply management's efforts contributed to profit?

A.

$2.00

B.

$2.50

C.

$3.00

D.

$4.00

Full Access
Question # 88

A cross-functional team meets on a monthly basis to review the status of various projects. During the most recent meeting, it is determined that several of the projects lack innovation and are at risk of being behind schedule and over-budget. Which of the following is the BEST approach for preventing these issues from happening in future projects?

A.

Leveraging the expertise, knowledge and experience of the suppliers

B.

Utilizing e-supply management tools

C.

Crowd-sourcing on the internet to gather ideas from outside the company

D.

Employing an alternative to the cross-functional team approach

Full Access
Question # 89

Which of the following BEST describes a single source supply strategy?

A.

Awarding purchases to one supplier in preference over other suppliers

B.

Designing requirements so that only one supplier can meet the needs of the organization

C.

Selecting two or more suppliers for the same product, but purchasing from only one of them to increase the volume discount

D.

Purchasing a product from one supplier for a period of time, then switching purchases to a new supplier for the same product

Full Access
Question # 90

Which of the following is the BEST course of action to take in order to develop a positive working relationship with a supplier?

A.

Invite engineering and production to meet with the supplier

B.

Work with the supplier one-on-one to develop a personal relationship

C.

Involve upper management in discussions with the supplier

D.

Involve Internal customers in team discussions with the supplier

Full Access
Question # 91

IJK, Inc. is currently under contract with Supplier X to provide parts utilized in retail products manufactured by IJK. Demand for UK's products is expected to increase dramatically, and thus the firm's supply manager wants to explore possible cost savings. Supplier X has been a reliable supplier for many years and provides excellent quality, on-time service, and a willingness to work with UK on improvements. However, the supply manager believes Supplier X’s price is too high, as a competitor is offering a lower price. Given this situation, which of the following is the BEST course of action for UK's supply manager to take?

A.

Demand concessions from Supplier X

B.

Meet with Supplier X with the intent of working to reduce costs

C.

Do nothing for the moment, but wait to see how much volume increases

D.

Transition to the competitor offering the lower price

Full Access
Question # 92

The chief executive officer (CEO) of a candy company directs the firm to source, produce and market a line of organic clothing. The firm's internal stakeholders are not in agreement with the CEO. In this situation, which of the following courses of action should supply management take?

A.

Create a steering committee

B.

Poll external stakeholders for input

C.

Select the best source of supply

D.

Perform cost regression analysis (CRA)

Full Access
Question # 93

When evaluating bids, the MOST critical aspect Is ensuring the quote meets the solicitation's

A.

quality requirements

B.

specifications

C.

technical capabilities

D.

terms and conditions

Full Access