Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

CTAL-TTA PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CTAL-TTA PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Certified Tester Advanced Level Technical Test Analyst
  • Last Update: May 8, 2024
  • Questions and Answers: 45
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CTAL-TTA Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CTAL-TTA Practice Exam Questions with Answers Certified Tester Advanced Level Technical Test Analyst Certification

Question # 6

Consider the pseudo code provided below:

CTAL-TTA question answer

Given the following tests, what additional test(s) (if any) would be needed in order to achieve 100% statement coverage, with the minimum number of tests?

Test 1: A = 7, B = 7, Expected output: 7

Test 2: A = 7, B = 5, Expected output: 5

A.

A=6, B=12, Expected output: Bingo! and A=7, B=9, Expected output: 7

B.

A=6, B=12, Expected output: Bingo!

C.

A=7, B=9, Expected output: 7

D.

No additional test cases are needed to achieve 100% statement coverage.

Full Access
Question # 7

Which of the following statements best captures the difference between data-driven and keyword-driven test automation?

A.

Data-driven test automation extends keyword-driven automation by defining data corresponding to business processes.

B.

Keyword-driven test automation extends data-driven automation by defining keywords corresponding to business processes.

C.

Data-driven test automation is more maintainable than keyword-driven test automation.

D.

Keyword-driven test automation is easier to develop than data-driven test automation.

Full Access
Question # 8

There are multiple activities the Technical Test Analyst performs regarding test automation. Which of the following activities is a typical test automation activity that the Technical Test Analyst will perform?

A.

Define the business process keywords and related actions.

B.

Execute the test cases and analyze any failures that may occur.

C.

Train the Test Analyst and Business Analyst to use and supply data for the test scripts.

D.

Decide regarding a test automation project based on a business case.

Full Access
Question # 9

Consider the pseudo code for the Answer program:

CTAL-TTA question answer

Which of the following statements about the Answer program BEST describes the control flow anomalies to be found in the program?

A.

The Answer program contains no control flow anomalies.

B.

The Answer program contains unreachable code.

C.

The Answer program contains unreachable code and an infinite loop.

D.

The Answer program contains an infinite loop.

Full Access
Question # 10

Which of the following statements about performance testing tools is NOT correct?

A.

Typical metrics and reports provided by performance testing tools include the number of simulated users throughout the test, and the number and type of transactions generated by the simulated users, and the arrival rate of the transactions.

B.

Significant factors to consider in the implementation of performance testing tools include the flexibility of the tool to allow different operational profiles to be easily implemented, and the hardware and network bandwidth required to generate the load.

C.

Performance testing tools typically drive the application by simulating user interaction at the graphical user interface level to more accurately measure response times.

D.

Performance testing tools generate a load by simulating a large number of virtual users following their designated operational profiles to generate specific volumes of input data.

Full Access
Question # 11

Below is the pseudo-code for the bingo program:

CTAL-TTA question answer

The bingo program contains a data flow anomaly. Which data flow anomaly can be found in this program?

A.

Variable "MIN" is not assigned a value before using it.

B.

Variable "AB is defined but subsequently not used.

C.

An invalid value is assigned to variable "B".

D.

The hard-coded value '2" should not be used.

Full Access
Question # 12

Which of the following statements BEST describes how tools support model-based testing?

A.

Finite state machines are used to describe the intended execution-time behavior of a software-controlled system.

B.

Random sets of threads of execution are generated as test cases.

C.

Large sets of test cases are generated to provide full code coverage.

D.

An engine is provided that allows the user to execute the model.

Full Access
Question # 13

At which test level would reliability testing most likely be performed?

A.

Static testing

B.

Component testing

C.

System testing

D.

Functional acceptance testing

Full Access