Consider the pseudo code provided below:
Which of the following options provides a set of test cases that achieves 100% decision coverage for this code fragment, with the minimum number of test cases?
Assume that in the options, each of the three numbers in parenthesis represent the inputs for a test case, where the first number represents variable “a”, the second number represents variable “b”, and the third number represents variable “c”.
A software company based in Spain that develops mobile applications expects many small updates in the future, e.g., due to changing configurations and customer feedback. The company also wants to focus on being able to change the software effectively and efficiently during initial development without introducing new defects.
Which maintainability sub-characteristic should be covered by the test approach during the initial development?
You are a senior Technical Test Analyst on a new government project for the Air Force. The software you are testing is used to control the hydraulics for the landing gear for a supersonic, stealth aircraft. You are responsible for organizing the white-box testing that will be performed for this project.
Which of the following would be the most appropriate technique to apply in this situation?
Which TWO of the following statements about Maintainability testing are TRUE?
A) It should start as soon as the draft design documents are available for review
B) An application can be considered maintainable when static analysis and code review defects have been fixed
C) It tests the regression impact of software or environmental changes to an operational system
D) It can be performed during Operational Acceptance Testing by multiple departments
E) It can be performed during User Acceptance Testing to ensure business processes can be maintained
An enhancement to a Social Media application allows for the creation of new Groups. Any number of existing application members can be added to a
Group. An attempt to add a non-existing member of the application to a Group will result in an error. Members can also be removed from an existing Group.
Existing Groups can also be deleted but only if there are no current members attached to it.
Which keyword-driven input table provides an adequate test of this enhancement?
When conducting a data flow analysis of following section of pseudo code:
Declare Function_Biggest integer (inputl integer. Input2 Integer) }
Declare output Integer
Set output = inputl
If input2 > output then
Set output = input2
Endif
Return output
}
Which of the variables utilized above has a potential anomalie?
Which TWO of the following are generic PRODUCT risk factors that should be considered by a Technical Test Analyst?
a)A high number of performance efficiency defects in the software
b)Inaccurate arithmetic calculations in key business areas cj Particularly complex code
d) Communication issues with geographically distributed teams
e) Usability-’ issues with the design of the user interface
Which of the following statements is TRUE regarding tools that support component testing and the build process?
Which of the following elicitation techniques is BEST usedwhen questioning a large number of stakeholders specifically to obtain information for non-functional acceptance criteria?
SELECT ONE OPTION
A medical company has performed a safety criticality analysis using the IEC61508 standard. The software components to be developed have been categorized by Safety Integrity Level (SIL). Most components have been rated at SIL 1 or 2, and a few components at SIL 4.
After some discussions with the QA manager, the project has decided to adhere to the recommendations for test coverage provided by the IEC61508 standard.
Which level and type of test coverage should at least be used for the components rated at Safety Integrity Level (SIL) 2?
Within the world of consumer electronics, the amount of embedded software is growing rapidly. The amount of software in high-end television sets has increased by a factor of about eight over the last six years. In addition, the market of consumer electronics has been faced with a 5 -10% price erosion per year. The price of a product is, among a number of other things, determined by the microcontroller used. Therefore, the use of ROM and RAM remains under high pressure in consumer electronic products, leading to severe restrictions on code size.
Within a new high-end TV project, it has been decided to apply dynamic analysis.
Which of the quality goals listed below is MOST appropriate to the project context?
You have been assigned the task of conducting the performance efficiency testing for a new Internet toolbar. Which of the following would be a valid test condition for this quality characteristic?
You are conducting security tests on an e-commerce application. Many core areas have been tested and found to have no issues. Protection of users' private information has also been verified. You are now focusing on testing the UI, which captures query information from the user. Which of the following defect types should you target in your testing?
Given the following code:
If x > y and z = 3 statement!
elseif z = 4 statement
endif;
What is the minimum number of tests needed to achieve 100% decision coverage?
A unit test should be isolated Which option correctly describes the meaning of 'isolated' as a characteristic of a unit test?
SELECT ONE OPTION
Whenever it is run under the same conditions, it should produce the same results.
Which of the following statements is TRUE regarding tools that support component testing and the build process?
As Technical Test Analyst on a test automation project covering the acquisition of a commercial test execution tool, what would you MOST likely be responsible for?
A product risk assessment has revealed the following product risks:
• lack of usability requirements
• security during on-line transactions
• perceived performance of the system and response time from the user interface
• a required availability of almost 100%
To address the 4th risk, which of the following quality characteristics for technical testing should be part of the test approach?
You have been given this piece of pseudocode to review Assume that the variables have been declared set and validated in code that precedes this piece that you are reviewing Looking only at this part of the code what requires further discussion?
If a < b then
If a > 12 then
seta = 21
else
set a = 23
endif
If b < 17 then
set a = 24
endif
lfb> 14
set a = 25
set b = 10
else
set a = 5
endif
else
set a = 7
endif
Consider the code fragment provided below:
The comment frequency of the code fragment is 13%.
To which non-functional quality characteristic does a good level of comment frequency especially contribute?
Within an embedded software project, the maintainability of the software is considered to be critical. It has been decided to use static analysis on each delivered software component.
Which of the following metrics is NOT a maintainability metric typically used with static analysis?
Which of the following statements best captures the difference between data-driven and keyword-driven test automation?
Installability testing is usually conducted during which stage in the application's SDLC and usually includes which other types of testing?
You have been assigned to perform a review on code provided below:
Which type of defect should you report as part of the code review?
Which of the following statements about Application Programming Interface (API) testing is TRUE?
You are working for a video game manufacturer You have a new title being released Market interest in the product is at an all time high and everyone in the company has been promised huge bonuses if the launch is successful You are responsible for portability testing Which area, m particular should you emphasize in your testing?
There are multiple activities the Technical Test Analyst performs regarding test automation. Which of the following activities is a typical test automation activity that the Technical Test Analyst will perform?
You are responsible for the performance testing of a new web application. In particular, you are interested in determining if you have enough and the right type of servers to handle 10,000 concurrent users. Which is the primary consideration when you are selecting your performance testing tools?
What is the common name for a type of automated testing technique that separates test input data and expected test results from the control script used to execute all of the tests?
Which of the following is a valid reason for including security testing in a test approach?
You are working on a project to develop an application that allows users to collaborate via bespoke, online whiteboards. The first release, delivering core functionality, highlighted misunderstandings of the user stories between testers, developers and the product owner during sprint development Since that release, the developers have agreed to implement a TDD approach for future software development.
Creation of the product backlog for the second release is underway and you have recommended to the project stakeholders that an atdd approach be adopted for the backlog's user stories. What would be a GOOD REASON for making this recommendation?
SELECT ONE OPTION
The following characteristics were identified during an early product risk-assessment for a software system:
• the software system needs to manage synchronization between various processes
• microcontrollers will be used that will limit product performance
• the hardware that will be used will make use of timeslots
• the number of tasks supported in parallel by the software system is large and are often highly complex.
Based on the information provided, which of the following non-functional test types is MOST appropriate to be performed?
Which of the following are activities that the Technical Test Analyst performs when setting up a test automation project?
1.Schedule the manual testing
2.Define interface requirements between tools
3.Perform a code review on the functional specifications
4.Determine whether to use a rule-dnven approach
5.Tram the test analysts to use and supply the data
You have identified existing test cases that require re-factoring, Which is the NEXT task you should perform?
SELECT ONE OPTION
Your Agile team is developing a web-based system that will allow users to browse and buy online from a store's shopping catalogue. Continuous Integration has been implemented and technically it is working well, running several times per day, but each run is taking almost as much time as the team is prepared to allow. It is clear that after a few more iterations, as the number of tests needed grows with the product, it will be taking too much time.
Which of the four options contains a pair of solutions that will BOTH help to solve this problem?
a.Only include unit and component integration tests in the automated Cl runs.
b.Schedule low priority tests to be the first ones executed in each run, in order to provide rapid build verification.
c.Reduce the extent to which the automated tests go through the user interface, using technical interfaces instead.
d.Reduce the number of Cl cycles run each day.
e.Select a subset of automated tests for the daytime Cl runs, and run as many of the other tests as possible in an overnight cycle.
SELECT ONE OPTION
What is the earliest stage in the application's SDLC at which performance efficiency testing can be performed?
Consider the following statements regarding Performance Efficiency Testing:
A) Static Analysis tools can analyze code to identify performance bottlenecks
B) Code reviews are an effective way of detecting performance issues
C) Scalability and Load testing are usually performed during the System test level
D) Performance test execution cannot begin until a production-like environment is available
Which TWO of these statements are TRUE?
A risk-based approach is being taken to test a new web-based retail application. Which of the following activities is the Technical Test Analyst NOT usually expected to perform?
You are part of an agile team creating a user story.
Which of the following requirements engineering techniques would you use to provide a visual representation of the system and help to see the 'overall* story with the functional flow?
SELECT ONE OPTION
The F in the mnemonic FIRST stands for Fast Which option correctly states the meanings of the other four letters (IRST)?
SELECT ONE OPTION