Spring Special Sale - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: spcl70

Practice Free M2 Commercial Mechanical Inspector Exam Questions Answers With Explanation

We at Crack4sure are committed to giving students who are preparing for the International Code Council M2 Exam the most current and reliable questions . To help people study, we've made some of our Commercial Mechanical Inspector exam materials available for free to everyone. You can take the Free M2 Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.

Question # 6

Exposed solar thermal equipment protected by motor vehicle impact may be installed at what height?

A.

Directly on finished floor

B.

6 feet above finished floor

C.

18 inches above finished floor

D.

48 inches above finished floor

Question # 7

Where the cooking surface has exposed flame and burners, the minimum distance between the lowest edge of a grease filter and the cooking or heating surface shall be _____ inches.

A.

18

B.

24

C.

42

D.

48

Question # 8

Termination of vents for appliances listed for and installed outdoors that incorporate integral venting shall:

A.

terminate not less than 5 feet vertically above the lowest connected appliance draft hood outlet or flue collar.

B.

terminate not less than 5 feet vertically above the highest connected appliance draft hood outlet or flue collar.

C.

be installed in accordance with their listings and the manufacturer’s installation instructions.

D.

be installed in accordance with the design professional’s plans as approved by the local building official.

Question # 9

Exhaust outlets that terminate at a temperature exceeding 600°F shall be designed as a:

A.

Class I duct.

B.

Class II duct.

C.

Class III duct.

D.

single-wall metal chimney.

Question # 10

An 8-inch Type B venting system with a listed vent cap must terminate a minimum of _____ feet above the flat roof through which it passes.

A.

1

B.

2

C.

4

D.

5

Question # 11

Which of the following is not a required mechanical inspection?

A.

Final

B.

Rough-in

C.

Underground

D.

Annual system test

Question # 12

ERV systems shall not be installed in which of the following except:

A.

systems utilizing coil-type exchangers.

B.

common exhaust systems for clothes dryers.

C.

exhaust systems emitting corrosive materials.

D.

equipment designed to assist in the evacuation of occupants.

Question # 13

Given: single-wall vent, which serves only one appliance, and has a height of 10 feet.

The maximum horizontal length permitted for a 5-inch diameter vent connector serving this vent is _____ feet.

A.

5

B.

7.5

C.

9

D.

10

Question # 14

Shutoff valves in plastic pipe ground-source heat pump loop systems shall be installed on both sides of which one of the following?

A.

Expansion tanks

B.

Heat-fusion joints

C.

Change-in-material joints

D.

Pressure-reducing valves

Question # 15

A low-pressure steam heating boiler is a boiler furnishing a maximum steam pressure of _____ psi.

A.

[option text not fully visible in the material you sent]

B.

15

C.

[option text not fully visible in the material you sent]

D.

80

M2 PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

M2 PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Commercial Mechanical Inspector
  • Last Update: Apr 5, 2026
  • Questions and Answers: 50
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

M2 Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included