Weekend Special - 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: spcl70

MB-335 PDF

$42

$139.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

MB-335 PDF + Testing Engine

$57

$189.99

3 Months Free Update

  • Exam Name: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert
  • Last Update: Feb 17, 2025
  • Questions and Answers: 178
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

MB-335 Engine

$48

$159.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

MB-335 Practice Exam Questions with Answers Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Certification

Question # 6

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Full Access
Question # 7

You are a production manager at a company which produces large batches of coffee and creamers.

After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.

You need to add 20 grams of sugar and stir the product for an additional 0.S hours.

What three actions are required on the rework order? Each correct answer presents pan of the solution.

NOTE: Each correct selection is worth one point.

A.

Manually reserve batch 120008 after estimating the batch order.

B.

Add a route operation for 0.5 run time hours of stirring.

C.

Add 20 grams of sugar to the production formula.

D.

Delete all items from the production formula except for 20 grams of sugar.

E.

Delete all route operations except for a half an hour stirring operation.

Full Access
Question # 8

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.

The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.

You need to ensure that the system is set up to support the manufacturing process.

Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.

Does the solution meet the goal?

A.

Yes

B.

No

Full Access
Question # 9

You must ensure that the firepit product is available for sale. How should the product be released?

A.

Release the engineering product version and then assign the route.

B.

Connect the BOM to an engineering product version before release.

C.

Connect a route to an engineering version before release.

D.

Release the engineering product version and then assign BOM.

Full Access
Question # 10

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 11

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Set product readiness to manual,

B.

Copy link and products.

C.

Define business impact.

D.

Change product lifecycle state.

E.

Set product readiness to automatic.

Full Access
Question # 12

You need to set up the state control for sales of motorcycles.

Which two actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

B.

Create an inclusive restricted product list for United States and add the motorcycle part to the list.

C.

Create an exclusive restricted product list for California and add the motorcycle part to the list.

D.

Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

Full Access
Question # 13

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

A.

Engineering attributes

B.

Change management for process manufacturing

C.

Engineering product variants

D.

Engineering change management

E.

Production floor execution management

Full Access
Question # 14

You need to create the production orders for standard model bicycles.

Which method should you use?

A.

Sales order line

B.

Master planning execution

C.

Supply schedule form

D.

Released item

E.

All production orders form

Full Access
Question # 15

You need to configure the bicycles’ production resource.

Which option should you use?

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Full Access
Question # 16

You need to configure each item for plastic manufacturing.

Which production types should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 17

A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You create the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.

You need to set up a new item model group for the service item.

Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 question answer

Full Access
Question # 18

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 question answer

Full Access
Question # 19

You need to configure the system to track the cost and delivery performance of VendorZ.

Which two actions should you perform? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Add an activity to the production route for deliveries.

B.

Create a service product and set Stocked product - Yes.

C.

Add an activity to the production flow for deliveries.

D.

Create a service product and set Stocked product = No.

Full Access
Question # 20

You need to set up the chocolate items.

Which values should you select? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 21

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 22

You need to determine the batch values on the combined mix batches for OperatorA.

Which values should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 23

You need to configure the system to meet the requirements.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 24

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Set up configuration and weight for partial visibility.

B.

Create a product master with predefined variants for ounces and boxes.

C.

Set up configuration and weight for full visibility.

D.

Create a catch weight item.

Full Access
Question # 25

You need to resolve the issue for UserF.

What should you configure? To answer, select the appropriate options in the answer area.

MB-335 question answer

NOTE: Each correct selection is worth one point.

Full Access
Question # 26

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 27

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic

Full Access
Question # 28

STION NO: 1

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

A.

Implies[Trim==Legend,Seat==ML]

B.

Seat!=ML

C.

[Trim==Legend|Seat==ML]

D.

Implies[Seat==ML,Trim==Legend]

Full Access
Question # 29

NO: 3 HOTSPOT

You need to configure system attributes.

Which attribute types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 30

You need to set up the configuration model to price the motorcycles correctly. What should you do?

A.

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Full Access
Question # 31

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

MB-335 question answer

Full Access
Question # 32

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 33

You need to configure production control parameters for liquid cleaning solution manufacturing.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Require an electronic signature when the formula is approved.

B.

Select Block editing and approve the formula.

C.

Select the Block removal of approval option for the formula

D.

Select the Block editing option only.

D18912E1457D5D1DDCBD40AB3BF70D5D

Full Access
Question # 34

You need to configure lot number control for inventory. Which option should you use?

A.

Physical inventory

B.

Blank receipt allowed

C.

Blank issue allowed

D.

Primary socking

Full Access
Question # 35

You need to configure the system to meet the order requirements for unscented cleaning solution. Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Configure the ingredient as a restricted and regulated product.

B.

On the inventory management parameters, set the value for the Print Product Safety Data Sheet and Prevent Sales Pack Slip/Invoke Posting to TRUE

C.

Add the ingredients for unscented cleaning solution to a regulated products inclusion list

D.

Ensure that the PSDS file is active and within the expiration date requirements.

E.

In Document Handling, associate the PSDS file with the PSDS record and set restriction field set to Internal

Full Access
Question # 36

You need to plan scheduling for Customer1’s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Schedule production based on the availability of raw material.

B.

Split and plan operations in detail for each of the resources.

C.

Schedule productions based on the capacity of the resources.

D.

Run master planning with a specific time fence.

E.

Plan scheduling of the production at the resource group level.

Full Access
Question # 37

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 38

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 39

You need to implement the scheduled Kanban requirements.

Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 40

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Full Access
Question # 41

You need to resolve the ModelA charging issue.

Which two configurations should you set on the work order finite capacity? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Ignore scheduled execution

B.

Asset

C.

Tool

D.

Worker

E.

Ignore schedule

Full Access
Question # 42

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 43

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 44

You need to configure the controller's ModelB asset requirements for the off-season.

What should you do?

A.

Use the default functional location

B.

Create a functional location.

C.

Create a location profile.

D.

Create a location type.

Full Access
Question # 45

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Service subscription

B.

Counter-based maintenance plan lines

C.

Maintenance plan lines for the location

D.

Service type item

E.

Time-based maintenance plan lines

Full Access
Question # 46

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 47

You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

MB-335 question answer

Full Access
Question # 48

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Assign new engineering version for parent BOM.

B.

Enable active for planning for lifecycle status.

C.

Assign lifecycle state for parent BOM.

D.

Disable active for planning for lifecycle status.

E.

Assign lifecycle state for subassembly.

Full Access