Summer Sale Coupon - 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sbfdisc

NCSC-Level-1 PDF

$44

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

NCSC-Level-1 PDF + Testing Engine

$70.4

$175.99

3 Months Free Update

  • Exam Name: Nutanix Certified Services Consultant (NCSC): Level 1
  • Last Update: Apr 18, 2024
  • Questions and Answers: 78
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

NCSC-Level-1 Engine

$52.8

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

NCSC-Level-1 Practice Exam Questions with Answers Nutanix Certified Services Consultant (NCSC): Level 1 Certification

Question # 6

A consultant is using a customer’s switch for installation. Although the 10GbE ports for each of the hosts are connected to the switch, the nodes fail to be discovered.

What is causing the issue?

A.

IPv6 is not enabled on the switch.

B.

IPMI port is not plugged in.

C.

Foundation VM is running on a Windows host.

D.

10GbE ports are configured with the incorrect duplex setting.

Full Access
Question # 7

After installation, network ports are properly configured with the default active-backup bonding.

One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.

What should the consultant enable to resolve this issue?

A.

LACP on switch

B.

PAgP

C.

Portfast

D.

Jumbo frames

Full Access
Question # 8

An existing Nutanix customer has several clusters in production and is adding a new cluster. The customer wants to create an AHV cluster that has already been racked and powered on remotely, with the factory image, using Prism Central.

Which step should the consultant take next?

A.

Build the cluster with the Foundation Applet

B.

Build the cluster with the Foundation VM.

C.

Bare metal image the nodes with the Foundation VM.

D.

Build the cluster with Foundation Central.

Full Access
Question # 9

A consultant is onsite with a customer running Foundation VM (FVM) and discovers that there is no connectivity between the FVM and their laptop. The consultant verifies the following:

* The consultant’s laptop and Nutanix nodes are plugged into a flat switch.

* The laptop, switch and nodes are plugged into supported power supplies.

* The laptop network adapters and FVM are configured with their corresponding IP addresses.

What is the cause for the connectivity failure to the FVM?

A.

The switch is not plugged into the power supply.

B.

Desktop Firewall is blocking ping requests.

C.

Network cables are not connected.

D.

Laptop WiFi configured to use DHCP.

Full Access
Question # 10

A consultant needs to review a customer’s switch port configuration to identify any issues. Other customer requirements are as follows:

* Leverage LACP

* Native VLAN will not be used

* Use Multiple Upstream switches

* Use VLANs 20-25 and 30

* LACP Fallback has been Enabled

* vPC or MLAG has been configured

What must be included in a configuration in order to meet these requirements?

A.

Native VLAN set to default

Ports trucked to allow all necessary VLANs

B.

Native VLAN set to default

Ports in access mode to allow all necessary VLANs

C.

Native VLAN set to 30

Ports Trunked to allow all necessary VLANs

D.

Native VLAN set to 30

Ports in access mode to allow all necessary VLANs

Full Access
Question # 11

A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured with the Route based on physical NIC load load balancing option. The customer does not see the option when editing the Teaming and Failover settings for the switch.

How should the consultant resolve this issue?

A.

Change the load balancing option on the switch.

B.

Add a vSphere Distributed Switch

C.

Add another physical NIC to the team.

D.

Install a vCenter server to manage the switch

Full Access