Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

OMG-OCSMP-MBA400 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

OMG-OCSMP-MBA400 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: OMG-Certified Systems Modeling Professional - Model Builder – Advanced
  • Last Update: May 2, 2024
  • Questions and Answers: 90
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

OMG-OCSMP-MBA400 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

OMG-OCSMP-MBA400 Practice Exam Questions with Answers OMG-Certified Systems Modeling Professional - Model Builder – Advanced Certification

Question # 6

Choose the correct answer

A company is executing a large distributed engineering project. More than a dozen engineers are contributing to the system model, working from different locations spread across three time zones The lead engineer has decided that it is essential to maintain a single model. The department director has expressed concern that the project may have trouble employing its engineers productively while still maintaining configuration control of this common model.

Which configuration management strategy is likely to be most successful*?

A.

Use a centralized repository for the model files Allow only engineers in the eastern-most time zone to upload changes to the model files in the mornings, and the western engineers in the afternoons. Either can download and view the model files at any time. This will assure maximum productivity while minimizing the possibility of collisions

B.

Use a configuration management tool to manage model elements. Assign ownership of model elements at the package level- Only the owner of a package may make changes to elements in that package Note that each relationship between model elements must be

contained within a single package

C.

Use a configuration management tool to manage model elements. Allow packages to be checked out by any user for editing, which locks the elements therein contained Packages may be viewed in read-only mode by any user at any time All model users receive alerts when a package they are viewing has been modified and checked-in. and changes are highlighted Packages may not remain checked out overnight

D.

Co-locate the modeling team Trying to maintain configuration of a model across a distributed team is extremely difficult and may not succeed

Full Access
Question # 7

Choose the correct answer.

An engineering learn has been charged to design and build an embedded real-time control system using COTS (Commercial Off-The-Shelf) purchased components where possible A technical risk for such a control system is that the system will miss (i.e . fail to respond to) critical inputs The project has the additional risk that there may not be any components on the market that will meet both timing and cost constraints

Given this, what information must be in the model before the engineering team can begin selecting and procuring COTS components?

A.

timing constraints for all behaviors involved in responding to a critical input

B.

(1) liming constraints for all behaviors involved in responding to a critical input (2) total system production cost provided by the customer

C.

(1) minimum period of time between any two successive critical inputs

(2) maximum acceptable time to produce all outputs for a critical input

(3) allocation of (2) to all behaviors involved in responding to a critical input

(4) total system production cost provided by the customer

D.

(1) minimum period of time between any two successive critical inputs

(2) maximum acceptable time to produce ail outputs for a critical input

(3) allocation of (2) to all behaviors involved in responding to a critical input

(4) total system production cost provided by the customer

(5) allocation of (4) to system components

E.

(1) minimum period of time between any two successive critical inputs

(2) maximum number of critical inputs that will arrive in a given time interval

(3) maximum acceptable time to produce all outputs for a critical input

(4) allocation of (3) to all behaviors involved in responding to a critical input

(5) total system production cost provided by the customer

(6) allocation of (5) to system components

Full Access
Question # 8

Choose the correct answer.

A project is evaluating several modeling tools which comply in vanous degrees to SysML abstract and concrete syntax The customer will allow some deviation from full compliance, as long as technical risk is minimized.

Which tool characteristics are required for this project?

A.

full compliance with abstract syntax, and limited deviations from concrete syntax

B.

full compliance with concrete syntax, and limited deviations from abstract syntax

C.

limited deviations from abstract and concrete syntax

D.

full compliance with both abstract and concrete syntax, nothing less is adequate

Full Access
Question # 9

Choose the correct answer

If a systems modeling tool conforms to the XMI specification and includes the XMI representation of the UML Profile for SysML and the XMI representations of Model Libraries defined by SysML. what does the tool provide?

A.

the import and export of only SysML diagrams from one tool to another

B.

the import and export of only SysML model data from one tool to another

C.

the import and export of both SysML diagrams and model data from one tool to another

D.

the ability to perform model checking to verify model conformance

Full Access
Question # 10

Choose the correct answer

A design team is applying the MARTE profile to its model to add information about timing and resources

What is a best practice to provide the MARTE information to the engineers who require it?

A.

Define a viewpoint and conform views for the engineers

B.

Always show the MARTE stereotypes and properties in the diagrams

C.

Define a model library that encapsulates the MARTE data for the engineers

D.

Create a separate model for the MARTE data and import it into the system model.

Full Access
Question # 11

Choose the correct answer

What are two cross-cutting mechanisms within SysML that can be used to establish traceability between the systems model and a UML software model?

A.

packages and parametrics

B.

profiles and stereolypes

C.

allocations and stereotypes

D.

requirement relationships and allocations

Full Access
Question # 12

Choose the correct answer.

When defining a stereotype, a modeler may wish to put some constraints on the stereotype, its properties, or its relationships. What is the most suitable language to accomplish this?

A.

DSL

B.

OCL

C.

VSL

D.

XMI

E.

XML