1z0-489 Practice Exam Questions with Answers SPARC M6-32 and SPARC M5-32 Servers Installation Essentials Certification

Question # 6

Which two statements are correct regarding the power and cooling requirements of a SPARC M5-32 server?

A.

The airflow is from the front to the back of the server. The approximate server airflow is: Maximum; 4200 CFM Typical: 2500 CFM

B.

Only a raised floor with perforated tiles in front of the server is supported.

C.

Cooling from ceiling vents is not supported.

D.

If using a raised floor, you need to arrange seven perforated tiles in front of the server so thatcold air from the tiles can flow into the server. Each perforated tile should support an airflow of approximately 600 CFM.

Full Access
Question # 7

Email alert notifications have stopped working. Which two targets should be checked to confirm that email alert configuration has been set up correctly?

A.

/SP/clients/smtp

B.

/SP/clients/snmp

C.

/SP/faultmgmt

D.

/SP/config

E.

/SP/alertmgmt/rules

Full Access
Question # 8

Which three components require IP addresses when you configure the SP network?

A.

SPO

B.

SP1

C.

ACTIVE_SP

D.

SPARE_ SP

E.

SLAVE_SP

Full Access
Question # 9

When you perform a firmware upgrade at a customer’s site, what three things actually get updated?

A.

Oracle ILOM firmware

B.

OpenBoot PROM firmware

C.

POST firmware

D.

Oracle Solaris firmware

E.

Disk firmware

Full Access
Question # 10

After completing an installation, you need to collect the system’s configuration. Which two actions do you perform?

A.

Explorer on the SPs

B.

Explorer on the PDoms

C.

Snapshot on the SPs

D.

Snapshot on the PDoms

Full Access
Question # 11

You need to power down HOST 1 to add additional memory to a CMU. Which command do you execute?

A.

power -off /HOST1

B.

set keyswitch off /HOSTI

C.

power /HOST1 off

D.

stop /HOSTI

Full Access