3 Months Free Update
3 Months Free Update
3 Months Free Update
Which three of the following options are available for database consolidation on Exadata?
You must drop all celldisks on all the storage servers in an X9M-2 quarter rack as part of a reconfiguration project.
Which three statements describe the account on the storage servers which you should use and the tool that may be used to drop the celldisks?
I/O performance of the prod database on your Exadata Database Machine has degraded slightly over the past month. The database has been allocated to the OLTP I/O Resource Management (IORM) category.
Which two monitoring tools might be useful in examining I/O performance for the prod database?
In order two support a new application, you are planning to add a RAC VM cluster to an existing Oracle Exadata X9M-2 deployment.
Which two methods can be considered?
You have a script with several CELLCLI commands that must be executed on each cell in your Exadata full rack. The script must run on each cell simultaneously. How must you achieve this?
A new Exadata Quarter Rack with 2 Database Servers and 3 HC Storage Servers and 3-phase 15kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU.
Which statement is correct?
Which two options describe the flash memory capabilities of the Exadata X9M-2 database and storage severs?
You are working on a remote Exadata Database Machine with current software and firmware. You now need to start a storage server after hardware maintenance.
Which ILOM command starts the storage server?
Exadata X9M enables virtualization using KVM. Which statement is true about virtualization on Exadata X9M?
Which two statements are true about the types of Exadata X9M-2 storage servers: the High Capacity (HC) storage server, the Extreme Flash (EF) storage server and the Extended server?
What are the two benefits of using Oracle Exadata Deployment Assistant (OEDA)?
Which three statements are true concerning the configuration or use of Enterprise Manager Cloud Control to monitor and manage Exadata Database Machine components?
How many 128GB Persistent Memory DIMMS are included in Exadata X9M-2 Extended (XT) Storage Servers?
You are hardening the security posture of your Exadata Database Machine. Before disabling ssh access to the storage servers, what should you do to enable REST access to the MS process?
You have configured a multirack Database Machine with two X9M-8 full racks all in a single cluster and storage grid comprising a total of 4 X9M-8 Database servers and 28 X9M-8 Storage servers.
Which two options are true regarding the servers on which Enterprise Manager agents must be deployed in order to monitor all components of this multirack configuration?
Examine these commands:
1. Execute "crscti stop cluster -all" as the grid user from one database server.
2. Execute "crscti stop cluster -all" as root from one database server.
3. Power off all network switches.
4. Execute "crscti stop cluster" as root from one database server.
5. Execute "crscti stop cluster" as the grid user from one database server.
6. Power off the rack using the power switches on the PDUs.
7. Execute "shutdown -h now" on all database servers.
8. Execute "shutdown -h now" on all Exadata storage servers.
Which is the correct order or the required commands to completely power off an Exadata Database Machine in an orderly fashion?
What is the minimum Exadata System Software version required for Exadata X9M?
Which are two correct statements about backing up Exadata Database Machine?