Summer Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

PfMP PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

PfMP PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: Portfolio Management Professional (PfMP)
  • Last Update: Sep 12, 2025
  • Questions and Answers: 495
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

PfMP Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

PfMP Practice Exam Questions with Answers Portfolio Management Professional (PfMP) Certification

Question # 6

Assume you are putting together for the Portfolio Review Board several options for consideration of potential components and current components. You are using an approach with different probabilities to determine outcomes and EMV. Which of the following would you recommend realizing Components A and B are new, while C and D are in progress:

PfMP question answer

A.

Component A

B.

Component B

C.

Component C

D.

Component D

Full Access
Question # 7

You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio. Which of the following capability and capacity analysis is used to limit the number OR size of components the organization can execute?

A.

Knowledge Basis

B.

Financial

C.

Human Resources

D.

Assets

Full Access
Question # 8

A new portfolio manager in your organization is currently preparing his portfolio charter and has come to you asking advice about what should be present in charter

A.

Justification, Scenario Analysis, Capability & Capacity Analysis

B.

Key dependencies, critical success criteria, high-level timelines

C.

All internal and external dependencies, components fixed timelines

D.

Justification, Scenario Analysis

Full Access
Question # 9

You have been assigned as a consultant to give your expertise on a failing portfolio which is critical to the success of your client's organization. You are now in the process of reviewing the portfolio management plan. What do you expect to see as part of this plan?

A.

Portfolio Justification, high-level scope and high-level timelines

B.

Vision for the portfolio, which is based on the alignment with the organization’s goals and objectives

C.

Balancing portfolio and managing dependencies

D.

The major components of the portfolio which are aligned chronologically to achieve portfolio value

Full Access
Question # 10

Assume you are managing a high visibility project in your company that once it is completed will transform it into new markets and be the leader in the soft phone field. You are keeping the project a secret from external stakeholders, and you and your team have signed Non-disclosure agreements (NDAs). However, the executives and those on the Portfolio Review Board want status information on this project every two weeks. You provide it:

A.

To those on the portfolio distribution list

B.

Electronically in a format that cannot be printed or forwarded

C.

To the members of the Board and executives verbally

D.

To the portfolio manager

Full Access
Question # 11

As you grow older, you gain more experience and things that once seemed hard to assimilate, can become very easy. One junior member of your portfolio management team is confused on the relationship between the Optimize, Authorize and Provide Oversight processes. What could your advice to him be?

A.

The provide portfolio oversight process may trigger the other two processes as part of the review meetings

B.

The three processes are not related and are in different focus areas

C.

The Optimize portfolio comes first, then authorize portfolio and finally Provide Portfolio oversight

D.

The Optimize portfolio process is used to balance the portfolio so that the authorize portfolio and Provide Portfolio Oversight processes can start

Full Access
Question # 12

Your company acquired another company. The sponsor asked you to check the other company's current inventory of work and see what could be added to your current portfolio. You have a meeting coming up to show the sponsor the portfolio dependencies. Which document should you be showing him?

A.

Portfolio Roadmap

B.

Portfolio Charter

C.

Portfolio Management Plan

D.

Portfolio Strategic Plans of both, your portfolio and the ones of the other company

Full Access
Question # 13

Strategies are changing, the portfolio mix is changing, the portfolio is progressing and you are doing a great job optimizing the mix of components. What tools and techniques are you using in the case?

A.

Weighted Ranking and scoring techniques, Portfolio Component inventory, Categorization

B.

Integration of Subsidiary Plans, Organizational Structure Analysis, Elicitation techniques

C.

Capability & Capacity Analysis, Weighted Ranking and scoring techniques, Graphical Analytical Methods, Quantitative & Qualitative Analysis, PMIS

D.

Capability & Capacity Analysis, Weighted Ranking and scoring techniques, Graphical Analytical Methods, Quantitative & Qualitative Analysis

Full Access
Question # 14

When managed correctly, the balanced scorecards can change the way an organization does business. Balanced scorecards keep focus on results. Which of the following are factors that can be targeted by the Balanced Scorecards method?

A.

Product Manufacturing, core competencies, response times, maintenance costs, shareholder value

B.

Reward, Leveraging Skills, Leveraging Information Systems, core competencies

C.

Product Manufacturing, core competencies, response times, reward, shareholder value

D.

Learning & Growth, Internal Process, Customer, Financial, Reward, maintenance costs, market value, supplier value

Full Access
Question # 15

Working to ensure the portfolio management process is one that is followed and is embraced has been a major challenge. As the portfolio manager, assume you set up meetings with the Portfolio Governance Group bi-weekly since there is constant change in your telecom company. You also want the portfolio process to be transparent. To do so, a useful tool to communicate status is:

A.

Reports on funding decisions

B.

A governance decision register

C.

The portfolio roadmap

D.

Key portfolio milestones

Full Access
Question # 16

Each portfolio risk should have a designated person as its owner. As the portfolio manager assigns the owner, the main responsibility is to:

A.

Analyze the risk for its overall impact on portfolio success

B.

Determine an appropriate response and implement it as soon as the risk occurs

C.

Monitor the situation as long as the risk is current

D.

Strive to take a negative risk and turn it into a positive opportunity

Full Access
Question # 17

Optimizing the portfolio is a major recurring process that the portfolio manager performs throughout the portfolio life cycle in order to balance the mix of portfolio components. During this process, the portfolio manager uses a number of graphical analytical methods to help him ease the process. Which of the following is not a graphical analytical method used in this process?

A.

Pie Charts

B.

None of the options

C.

Risk vs. Return charts

D.

Histograms

Full Access
Question # 18

One of the major resources on your portfolio is needed by two of the components at the same time. This resource has high technical knowledge and is aware of all the business needs. Which of the following tools and techniques can you use in order to solve this issue?

A.

Sequencing Techniques

B.

Capability and Capacity Analysis

C.

Scenario Analysis

D.

Interdependency Analysis

Full Access
Question # 19

One of your components' managers came to you stating that she cannot find a key stakeholder by email and if she cannot find him, a major decision will be delayed, thus affecting the entire portfolio. What should you, as a portfolio manager do?

A.

Tell her that she needs to try to send him one more e-mail, and in the case the problem persists, she needs to send him a formal letter

B.

Tell her that she needs to carefully monitor this risk

C.

Tell her that she needs to escalate this issue directly to the executive management

D.

Go and meet this stakeholder face to face and collaborate with him to solve this communication issue

Full Access
Question # 20

Assume you are the portfolio manager for your training company. It decided to implement portfolio management in a major way to ensure it remained competitive in the changing market and could offer a variety of methods to deliver courses rather than only in a face-to-face setting. The company set up a Portfolio Management Group, and you are responsible for providing information on portfolio status and then providing information to those interested stakeholders about the Board's decisions. You want to make sure the reports meet stakeholder requirements. After performing a detailed communications requirements analysis, you found it interesting that stakeholders wanted information about:

A.

Portfolio infrastructure costs

B.

Goal achievement

C.

Benefit realization

D.

Changes in the roadmap

Full Access
Question # 21

Assume your automotive company is new to formal portfolio management. It has had for years a strategic plan and tries to be first to market for new and improved features on its vehicles each model year. You were hired as the portfolio manager to provide a more disciplined approach for determining new products to pursue as well as existing ones that should be terminated. So far, you have set up an approach, established categories for the various components, and determined a method to rank and score new proposals for consideration. Now you are working to set up practices to follow to optimize the portfolio. In doing so, it is important to note that:

A.

The criteria to optimize the portfolio may be the same as that used in the scoring model

B.

A portfolio management information system should be set up

C.

Future investment requirements are a key criterion to consider

D.

Compliance with organizational standards cannot be overlooked

Full Access
Question # 22

One of the ten underlying principles of portfolio management involves a strategic focus. Assume you are going to have a short meeting with your CEO tomorrow, and you want to succinctly describe it. You will tell the CEO it is important since it:

A.

Emphasizes the need for portfolio management to attain strategic objectives

B.

Provides a clear basis for decision making

C.

Includes processes and change initiatives to accomplish organizational strategies

D.

Balances conflicting demands

Full Access
Question # 23

You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the performance closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust performance management plan. What is expected to be found in this plan?

A.

Identified stakeholder expectations

B.

Resources required by type and quantity

C.

Resource optimization and Benefits Realization

D.

Portfolio Vision and measurable goals and guidance

Full Access
Question # 24

In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. Which of the following are considered outputs to the Manage Portfolio Information process?

A.

Portfolio Process Assets updates, Portfolio Roadmap updates, Portfolio updates, Portfolio Management Plan updates, Enterprise Environmental Factors updates

B.

Portfolio Process Assets updates, Portfolio Management Plan updates, Portfolio Reports

C.

Portfolio Process Assets updates, Portfolio Charter updates, Portfolio updates, Portfolio Management Plan updates, Enterprise Environmental Factors updates

D.

Portfolio Process Assets updates, Portfolio Charter updates, Portfolio Reports updates, Portfolio Management Plan updates, Portfolio Component Reports updates

Full Access
Question # 25

A portfolio manager needs to continuously balance the need and requirements with the available resources to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to developing the charter, and in order to complete the portfolio structure, the capability and capacity analysis is used to

A.

Measure the internal resource capacity and establish the external resources availability

B.

Measure internal and external resources capabilities and capacities

C.

Measure the internal resource availability and establish the external resources capacity

D.

Measure availability and capability of internal resources and forecast the use of external resources

Full Access
Question # 26

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You are currently in the process of identifying and analyzing risk, in addition to developing risk responses and monitoring and controlling risk. Which documents can help you achieve this?

A.

Portfolio Management Plan, Organizational Process Assets, Portfolio Reports, Enterprise Environmental Factors

B.

Portfolio Management Plan, Organizational Process Assets, Portfolio Process Assets, Portfolio

C.

Portfolio Management Plan, Organizational Process Assets, Portfolio Process Assets, Enterprise Environmental Factors, Portfolio, Portfolio Reports

D.

Portfolio Management Plan, Portfolio, Portfolio Reports, Enterprise Environmental Factors

Full Access
Question # 27

Assume your consulting company tried portfolio management in the past, but it was not embraced. Instead, people received bonuses if they were able to acquire new work regardless if it fit the company's strategic plan. However, the company was sold, and the new executive team asked you to be the portfolio manager. You explained it did not work in the past, but the new team has pointed A. out while a lot of work was won competitively, much of it was for small dollar amounts, and resources are misallocated. The new approach is to focus on business value, which has as its goal to:

B. As chieve the greatest return on investment to the organizationBb. aximize productivity and increase overall customer satisfaction

C. Deliver the maximum value aligned with strategic objectives

D. Focus on those opportunities that have the greatest likelihood of successful completion

Full Access
Question # 28

The Portfolio Management Office (PMO) provides support to the portfolio manager throughout the portfolio life cycle. Which of the below is not something that the PMO supports the portfolio manager with?

A.

Define Portfolio Management best practices

B.

Formulating component management standards

C.

Define Portfolio Management standards

D.

Formulate organizational standards

Full Access
Question # 29

Updates to schedules i.e. resource, funding, benefits, are results of Developing the Portfolio Performance Management Plan process. Where should these updates be recorded?

A.

Portfolio Management Plan updates

B.

Enterprise Environmental Factors Update

Portfolio Process Assets updates

C.

Portfolio update

Full Access
Question # 30

The portfolio manager defines the portfolio based on a listing of already existing work in the organization and selects the right components in order to be able to prioritize them. What do you use for defining the portfolio based on the listing of work?

A.

Prioritization

B.

Inventory of Work

C.

Portfolio Component Inventory

D.

Elicitation technique

Full Access
Question # 31

When managed correctly, the balanced scorecards can change the way an organization does business. Balanced scorecards keep focus on results. As a portfolio manager, you know that the purpose of using the balanced scorecards is

A.

All of the options

B.

Translate a high level strategic plan into an operational action plan

C.

Measure performance against goals

D.

Bring a feedback loop to strategic planning

Full Access
Question # 32

Managing Strategic Change is an integral part of any portfolio in order to remain aligned with the strategic objectives. Your portfolio has undergone a major strategic change and you are currently determining the volume of work required to do in order to re-align the portfolio. What are you currently using?

A.

Change Analysis

B.

Gap Analysis

C.

Readiness Assessment

D.

Stakeholder Analysis

Full Access
Question # 33

By setting up portfolio categories and using a pair-wise comparison approach to rank components, as the portfolio manager, you feel that you are finally setting up and getting people to follow standard portfolio practices. Since portfolio management still is relatively new, progress is under way. As some components are added, and others are not continued, you are making sure if a component is terminated that it does not have dependencies with others in the portfolio. You need to then:

A.

Revise the ranking model

B.

Inform all stakeholders

C.

Update the roadmap

D.

Upgrade to a more detailed scoring model that includes dependencies with components

Full Access
Question # 34

Capability and capacity analysis are useful tools in portfolio performance management. In using this type of analysis a best practice is to:

A.

Employ a resource management process

B.

Evaluate knowledge, skills, and competencies

C.

Use it once portfolio resources are included in the portfolio performance management plan

D.

Evaluate resource optimization

Full Access
Question # 35

Assume your telecom company is time constrained and needs to be first to market with new smart phones with features that are different from those of the competition and also have the traditional features desired by your existing customers. The Portfolio Review Board meets weekly to assess performance and to consider new components. Lack of technical resources is a recurring issue. To make the case for acquiring new resources, you decided to assess capability and capacity. This approach is:

A.

Part of the PMIS

B.

Included in finite capacity planning and reporting

C.

Used to prepare a detailed forecast of ongoing and future capability needs

D.

Used to identify resource capacity and capability

Full Access
Question # 36

Your company's new CEO has set an aggressive target and informed everyone that the target needs to be met by all means in order for the company to be able to realize benefits and avoid bankruptcy. What is the best management approach that the portfolio manager should take in this case?

A.

Directing

B.

Advising

C.

Leading

D.

Supporting

Full Access
Question # 37

For governments worldwide, you normally have a lot of people reluctant to change and to using new technology tools especially for communication. You are managing a governmental portfolio and planning for a transformational endeavor. You are currently depicting the various communication media and methods to be used, where is this information normally used?

A.

Communication Matrix

B.

Stakeholder Communication Strategy Matrix

C.

Stakeholder Groups

D.

Stakeholder Matrix

Full Access
Question # 38

Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options helps in comparing the current portfolio mix to the new strategic direction in order to determine the needed changes?

A.

Interdependency Analysis

B.

Prioritization Analysis

C.

Portfolio Component Inventory

D.

Gap Analysis

Full Access
Question # 39

You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. For this you start by developing the strategic plan. What output do you expect from this process?

A.

Portfolio, Portfolio Strategic Plan

B.

Portfolio, Portfolio Strategic Plan, Portfolio Reports

C.

Portfolio, Portfolio Strategic Plan, Enterprise Environmental Factors updates

D.

Portfolio Process Assets updates, Inventory Of Work, Portfolio, Portfolio Strategic Plan

Full Access
Question # 40

Working to monitor the portfolio especially in terms of its value to the organization, you had each component manager prepare monthly variance reports. Of the components ranked in the top 10, six of them realized they would not require some of their initial funding and still would be completed as planned. This means:

A.

Three-point estimating should be used as funds are allocated

B.

Next year's budget can be adjusted

C.

Historical data would be useful on estimates versus actual costs

D.

The amount of contingency and management reserves can be decreased

Full Access
Question # 41

Assume you are the portfolio manager for a telecommunications company. Your company was about to launch a new and easy to use smart phone with more features than any existing phones on the market at a lower price. However, although the phone was due to market in five days, the Federal Communications Commission issued today a regulation that would make your new phone not available for use in airplanes. Thus additional work must be done, and your executives are wondering whether a new phone should be developed for this new feature. You are ensuring that if a new phone is developed, or if the almost completed product is not to be marketed, there is still alignment to the organization's strategy. As you complete an analysis of alternatives, you also should ensure results of the analysis are reflected in the:

A.

Benefits realization plan

B.

Portfolio process assets

C.

Portfolio roadmap

D.

Portfolio performance plan

Full Access
Question # 42

Resources allocation and optimization for use is key to a successful portfolio. You have assigned human resources, funds and other required assets to a component that you have initiated recently. What should have been done prior to being able to to that?

A.

Managed Portfolio Value

B.

Communicated the decision to all stakeholders

C.

Prioritized the component

D.

Authorized the component

Full Access
Question # 43

In your opinion as a portfolio manager, which of the following is considered one of the portfolio's concerns?

A.

Determining how to balance components given the organization’s capacities and capabilities

B.

Maximizing financial value of the portfolio

C.

All of the options

D.

Tailoring the fit of the portfolio to the organizational strategy and objectives

Full Access
Question # 44

Risk Management is integrated in all the other processes and process groups and is an integral recurrent activity throughout the portfolio life cycle. Which of the following is considered the most effective method for analyzing the effect of risks on portfolio strategic objectives, and determining whether they have high or low effect

A.

Tornado Diagram

B.

Risk vs. Return charts

C.

Burn Down/Up charts

Monte Carlo Analysis

Full Access
Question # 45

Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options shows a clear path from the "as-is" to the "to-be" vision?

A.

Portfolio

B.

Portfolio Charter

C.

Portfolio Strategic Plan

D.

Portfolio Roadmap

Full Access
Question # 46

Your company works closely with the government on the implementation of water pumps for rural areas. You are constantly dealing with new and updated regulations, and periodically adapting the portfolio to the changes. When it comes to regulatory components, how do you include the components in the portfolio?

A.

Normally categorize, score and rank the components, however, include them in the final portfolio regardless of the results

B.

Normally categorize, score and rank the components and include them similar to any other component in the portfolio

C.

Reject them if they are not strategically aligned with the portfolio objectives

D.

Include them directly in the portfolio without categorization, ranking and scoring

Full Access
Question # 47

As soon as you complete the portfolio risk management plan, and you have been working on it now with a team, you realize you need to update some organizational process assets such as:

A.

Risk checklists

B.

Risk register

C.

Lessons learned

D.

Risk interview guide

Full Access
Question # 48

Working to prepare the portfolio performance management plan, assume you have been involving others in the process to help secure their later support of the plan. You also reviewed historical information and other artifacts. Not to be overlooked is a/an:

A.

Benefit schedule

B.

Organization chart

C.

Regulatory requirements

D.

Governance model

Full Access
Question # 49

As a portfolio manager you try to use all the information available to you in order to get the best out of the existing information and to better plan and manage the portfolio. The Enterprise Environmental Factors are important and referenced throughout the portfolio life cycle. Which of the following is correct regarding their purpose and focus?

A.

Forecasts how and when the portfolio will deliver value to the organization

B.

High-level prioritization mapping of the portfolio

C.

Organization’s overall governance processes

D.

Establish communication requirements

Full Access
Question # 50

Your company got recently acquired by another company and the strategic directions which your portfolio is based on have been changed. Which document do you, as a portfolio manager, change to reflect the portfolio new vision?

A.

Portfolio Strategic Plan

B.

Portfolio Management Plan

C.

Communication Management Plan

D.

Portfolio Roadmap

Full Access
Question # 51

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you continuously report risks and issues to stakeholders. One of the key stakeholders is furious as he cannot find an issue that has occurred a week ago in the risk register. What should you do in this case?

A.

Inform the stakeholder that risk that have occurred are removed from the risk register and not used anywhere else

B.

Inform the stakeholder that issues are risks that have occurred and are tracked as part of the issue register

C.

Inform the stakeholder that you will directly fix this and include it in the risk register

D.

Inform the stakeholder that when positive risks occur they become realized opportunities and when negative risks occur they become realized threats

Full Access
Question # 52

The Portfolio Management Office plays an integral role in Portfolio Management and offers support to the portfolio manager throughout the portfolio life cycle. What is the role of the PMO with respect to the portfolio performance metrics?

A.

PMO does not have a role in the development or update of performance metrics; it should only offer support to Portfolio Manager with the needed templates to develop metrics

B.

The Portfolio Manager develops and updates the portfolio metrics and the PMO approves them

C.

PMO should work hand in hand with the governance board to approve the performance metrics

D.

PMO should be prepared to develop new metrics when appropriate and delete or change metrics that are no longer relevant

Full Access
Question # 53

Your sponsor has urged you to analyze Portfolio Risk before the end-of-week governance board meeting as the CEO will be present and is interested in Portfolio risk data in particular. Currently, you do not have adequate risk information in order to analyze data and give recommendations. Which tool is the most suitable for you to use in this case?

A.

Cumulative distribution

B.

Weighted Ranking and Scoring Techniques

C.

Delphi

D.

Graphical Analytical methods

Full Access
Question # 54

As part of the portfolio communication management, multiple documents are prepared in order to effectively manage communications. The Stakeholder matrix is one of the prepared documents, what does it include?

A.

Stakeholders quadrants showing the level of interest and influence

B.

Stakeholders roles, interests, expectations and groups

C.

Intended recipients, communication vehicles, frequency and communication areas

D.

Representation of all of the communication for the portfolio and their frequency over a period of time

Full Access
Question # 55

The portfolio management process ensures the components are aligned to goals. However, it is driven by:

A.

Viability

B.

Value and benefits

C.

Organizational strategy and objectives

D.

Interdependencies and resource constraints

Full Access
Question # 56

You have set a series of meetings with your portfolio team members as an answer to the identification and update of the organization near-term budget and plans. As a result you have defined and developed the portfolio strategic goals, near-term budgets, and plans, and you now want to start managing ongoing portfolio activities. What is the focus of what you are doing?

A.

Authorizing the portfolio

B.

All of the options

C.

Achieving Results

D.

Initiating the portfolio

Full Access
Question # 57

As you are the portfolio manager for your state government agency, which is undergoing a series of budget cuts, you are focusing attention on managing risks to the portfolio as the budget is reduced. You realize in this process the time and budget for risk management also will be reduced; these data are in the:

A.

Portfolio performance plan

B.

Portfolio strategic plan

C.

Portfolio management plan

D.

Portfolio financial plan

Full Access
Question # 58

Enterprise environmental factors (EEFs) may constrain portfolio management options and may have a positive or negative influence on the outcome. Which of the following is not considered part of the EEFs?

A.

Personnel administration

B.

Stakeholder risk tolerances

C.

Existing human resources

D.

Component Managers Roles and Responsibilities

Full Access
Question # 59

You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio. Which of the following capability and capacity analysis is used to just limit the number of components the organization can execute?

A.

Knowledge Basis

B.

Financial

C.

Human Resources

D.

Assets

Full Access
Question # 60

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You started with developing the plan that will be used as guideline for the component plans to manage risks at their level. What are the outputs of this plan?

A.

Portfolio Management Plan updates, Portfolio updates, Portfolio Reports, Enterprise Environmental Factors updates

B.

Portfolio Management Plan updates, Organizational Process Assets updates, Portfolio Process Assets updates

C.

Portfolio Management Plan updates, Organizational Process Assets updates, Portfolio Reports, Enterprise Environmental Factors updates

D.

Portfolio Management Plan updates, Organizational Process Assets updates, Portfolio Process Assets updates, Portfolio updates

Full Access
Question # 61

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. Risk Categories, criteria and probability and impact are updated as a result of Developing the Risk Management Plan. These updates are recorded in which of the following?

A.

Portfolio Management Plan updates

B.

Portfolio Process Assets updates

C.

Organizational Process Assets updates

D.

Portfolio Reports

Full Access
Question # 62

Programs and projects in your company, one of the largest banks in the world, are required to submit metrics as to their individual progress each month. To simplify the collection and reporting process, you held interviews with members of the Portfolio Review Board to see their areas of greatest interest and also with program and project managers to determine how difficult it would be to collect the data. You then selected 10 possible metrics to the Board, with a goal that five would be regularly reported. It is important to note that:

A.

Quantitative metrics are preferable

B.

The value is realized when components are used

C.

Customer satisfaction is the most important goal

D.

If components have interdependencies with other components, their metrics should be reported as a group

Full Access
Question # 63

You are managing a large portfolio and are approaching to a major checkpoint. As a portfolio manager, you are now collecting information and reports from various components for aggregation and presentation. What method/tool can you use to support you in this process?

A.

Elicitation

B.

PMIS

C.

Manage Portfolio Information

D.

Communication methods

Full Access
Question # 64

The PMO in your company is newly established and one of its first results was allowing the portfolios to use a new communication method to disseminate the information faster. With relation to your portfolio, where should this new communication be stored?

A.

Portfolio Reports

B.

Portfolio Process Assets updates

C.

Portfolio Management Plan updates

D.

PMO Management Plan

Full Access
Question # 65

In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. Which of the following help you with managing the portfolio value?

A.

PMIS, Elicitation techniques, Communication Requirements Analysis, Communications Methods

B.

Elicitation techniques, Capability & Capacity Analysis, PMIS

C.

Elicitation techniques, Communication Requirements Analysis, Stakeholder analysis

D.

Scenario Analysis, Capability & Capacity Analysis, Quantitative & Qualitative

Full Access
Question # 66

Assume you are the portfolio manager for a company that specializes in software, including portfolio management software. It has many components under way to enhance the existing product line but also to move the company into Cloud computing. You regularly prepare reports on the portfolio status but lately have had a large number of stakeholders request ad hoc reports. You decided to survey your stakeholders to learn about their information needs. You next decided to hold some one-on-one interviews with several interested and influential stakeholders in terms of communications requirements. From these interviews you are concerned that some stakeholder groups may be missing so you decided to:

A.

Conduct another survey

B.

Hold some lessons learned sessions

C.

Have a brainstorming session

D.

Convene a focus group

Full Access
Question # 67

You are the portfolio manager for a large and complex portfolio with a low risk appetite. You are currently planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes. Which of the following tools focuses on pricing and sales forecast?

A.

Market Payoff variability

B.

Trade-Off Analysis

C.

Market Requirement Variability

D.

Budget Variability

Full Access
Question # 68

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. One of your team members came to you asking about the order of the steps used to perform risk management activities. What should be your answer to him?

A.

Risk Identification, Risk Assessment, Response Planning, Risk Response

B.

Risk Planning, Risk Assessment, Risk Response

C.

Response Planning, Risk Identification, Risk Assessment, Risk Response

D.

Risk Identification, Response Planning, Risk Assessment, Risk Response

Full Access
Question # 69

As you work to determine which of four possible components to optimize the portfolio, assume you are using the internal rate of return as the key crite rion to make your recommendation. Only one new component can be added based on financial constraints. Each of the four potential components has benefits that support the strategic plan. Based on the following data, you recommend:

PfMP question answer

A.

Project A

B.

Program A

C.

Program B

D.

Project B

Full Access
Question # 70

Risk is inherent in all activities and managing risk is critical to a successful portfolio. Risks perspectives differ within the organization between executive management, operations management, portfolio management and project/program management. When it comes to Portfolio management, which of the following is a risk concern?

A.

Issues with Product development

B.

Time, cost and scope commitments

C.

Reporting and data accuracy

D.

Time to market

Full Access
Question # 71

Your CEO is keen to know the expected value of multiple components that interest him and wants you to give him a comparison of the expected value across components. You are currently looking for a tool to facilitate comparison of expected value across components and support informed portfolio decision making. What are you looking for?

A.

Manage Portfolio Value

B.

Portfolio Strategic Plan

C.

Value Measurement Framework

D.

Portfolio Process Assets

Full Access
Question # 72

Portfolio Prioritization Model is included in the Portfolio management plan and guides the ongoing decisions as to which portfolio components should be added, terminated, or changed; which of the following is correct regarding the Prioritization Model purpose and content?

A.

All of the options

B.

Ensures benefits are comprehensively and holistically taken into consideration

C.

Contains criteria to ensure alignment to strategic goals, expected return on investment (ROI), investment risks, and dependencies

D.

Establishes and tailors the decision-making rights and authorities

Full Access
Question # 73

Chartering the portfolio is an important step towards the initiation of the endeavor. It authorizes the portfolio managers to use the resources and marks the first step towards the allocation of resources to the components upon their initiation. Which of the below can help you while developing the charter?

A.

Strategic Alignment Analysis, Prioritization Analysis, Portfolio Component Inventory

B.

Prioritization Analysis, Interdependency Analysis, Cost-Benefit Analysis

C.

Scenario Analysis, Capability & Capacity Analysis

D.

Gap Analysis, Readiness Assessment, Stakeholder Analysis

Full Access
Question # 74

As a portfolio manager you visit and re-do the Optimize Portfolio process continuously. Which of the following, in your opinion, is the objective/purpose of the Optimize Portfolio Process?

A.

Balance the portfolio for performance and value delivery

B.

Make Governance Decisions

C.

Create an up-to-date list of qualified portfolio component

D.

Allocating resources to develop component proposals or execute portfolio components

Full Access
Question # 75

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risks is key to success, and you are coaching your team on the same. While planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes. Which of the following tools determines the effects of portfolio velocity?

A.

Budget Variability

B.

Market Payoff variability

C.

Time-To-Market Variability

D.

Trade-Off Analysis

Full Access
Question # 76

While managing portfolio communications, the portfolio manager needs to account for the communication needs of the component teams in order for them to stay in the loop of the big picture. Which of the following can be of interest to this group of stakeholders?

A.

To know about the portfolio changes, risks and issues that may affect their components

B.

To be informed regularly of the portfolio progress so they can adjust their work accordingly

C.

To be informed of all portfolio changes so they can assess which changes affect their components

D.

To know about the portfolio changes, risks and issues that may affect their components, and to do interdependency management in order to cover any dependent component's issues

Full Access
Question # 77

The interest, influence, and communication needs of business operational stakeholders who are looking to ensure alignment between portfolio components, while minimizing negative impact and maximizing positive benefits of all portfolio-managed changes to their business operations, relate to which type of stakeholders?

A.

Internal and External Stakeholders

B.

External Stakeholders

C.

Does not relate to stakeholders

D.

Internal Stakeholders

Full Access
Question # 78

As you work to determine which stakeholders had the highest degree of influence over the portfolio, you wanted to especially know about the members of the Portfolio Governance Board because:

A.

They would have numerous interrelationships with other stakeholders

B.

They would be best suited to work with people who were not portfolio management supporters

C.

The governance processes affect information requirements

D.

All of the portfolio changes, risks, and issues would be of interest to them

Full Access
Question # 79

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You have just finalized the development of the risk management plan. What do you normally expect to find in a Portfolio Risk Management Plan?

A.

Communication policies/constraints

B.

Organizational risk tolerance

C.

Governance Model

D.

Roles and Responsibilities for risk management

Full Access
Question # 80

You have just finished the development of the Portfolio Communication Management Plan. The portfolio team is looking for portfolio value assessment, status reports, and portfolio forecast with variance to plan. Where should they find this information?

A.

Portfolio

B.

None of the options

C.

Portfolio Management Plan

D.

Portfolio Process Assets

Full Access
Question # 81

Your company, which has been in the blimp business for over 50 years, prides itself on its robust portfolio management process, which is especially useful now that the demand for blimps of various sizes is much greater than the capacity to produce them. One of the reasons the blimp company has been so successful over the years is it has central management of all of its resources. This approach is important:

A.

Since the various types of needed resources may be limited

B.

To ensure the right resources are assigned

C.

To monitor resource allocation

D.

As a way to assess whether existing resources have the competencies to support the components in the portfolio

Full Access
Question # 82

With the introduction of new legislation in your company, anyone now is entitled to medical services regardless of whether or not they are employed or have any pre-existing health conditions. Your insurance company's executives have been tracking this legislation as it means significant changes for your company; many employers who obtained insurance through your company may go elsewhere for lower costs. Recognizing this legislation may lead to a loss of revenue, your company decided to merge with another insurance firm to obtain greater market share. This merger, though, means some existing projects may not be needed, and the workforce will be reduced by 20 percent, Such a significant change will impact how components are categorized in your portfolio leading to:

A.

The need for a re-constituted oversight group

B.

Portfolio rebalancing

C.

A requirement to update the portfolio management plan

D.

A new portfolio prioritization model

Full Access
Question # 83

You have set a meeting with your portfolio team members as an answer to the identification and update of the organization near-term budget and plans. One of your team members asked you of the goal of what is being done. Your answer to him should be

A.

All of the options

B.

Authorizing the portfolio

C.

Initiating the portfolio

D.

Developing specific portfolio assets

Full Access
Question # 84

In a portfolio you have a continuous interaction between the portfolio and its components. The approach is top down when it comes to offering guidelines and approaches and becomes bottom up when the components report status and progress to the portfolio. What is the relation between the portfolio and portfolio components when it comes to defining the performance measures and targets (metrics)?

A.

Portfolio metrics are not related to component metrics, each is used at its own level

B.

Metrics are defined at portfolio level and given as guidelines to components in order to define their own metrics

C.

Portfolio metrics used at the portfolio level are the same used at components level

D.

Metrics are defined at components level and rolled up to the portfolio level

Full Access
Question # 85

You are currently creating portfolio scenarios (what-if analysis) by reviewing components against prioritization criteria and using analysis techniques (e.g., options analysis, risk analysis, SWOT analysis, financial analysis). You are doing this in order to

A.

Understand the strategic priorities

B.

Create a basis for decision making

C.

Evaluate and select viable options

D.

Provide a guiding framework to operationalize the organizational strategic goals and objectives

Full Access
Question # 86

A new project manager was given an assignment on one of the components in your portfolio. What will you do as a portfolio manager in order to align the project manager with the strategic direction and integrate him/her with the work in progress?

A.

Let him check the Project Charter and ask you in the case where he needs your help

B.

Let him check the Portfolio Charter and ask you in the case where he needs your help

C.

Update the roles and responsibilities in the Portfolio Management Plan

D.

Train him on the portfolio management processes

Full Access
Question # 87

Consider you have the following efficient frontier graph with multiple portfolios on it. Which portfolio do you choose?

Larger image

A.

Portfolio D

B.

Portfolio B

C.

Portfolio C

D.

Portfolio A

Full Access
Question # 88

Assume you work for a technology company that is publically owned, and the value of its stock is tracked daily by the CFO and is reported to the portfolio manager. Quarterly meetings are held with stockholders as the company went public through an Initial public offering (IPO) last year. These stockholders:

A.

Have different communications requirements than other stakeholders

B.

Typically receive information as to the portfolio health before each meeting

C.

Want to attend all Portfolio Review Board meetings

D.

Are considered external stakeholders

Full Access
Question # 89

One key artifact to review as the portfolio communications management plan is prepared is the:

A.

Portfolio management plan as it shows all elements in it have communications requirements

B.

Portfolio performance plan as it sets forth needed reports and their frequency

C.

Portfolio strategic plan since it shows the need for strategic alignment

D.

Portfolio benefits realization plan to determine reports on progress in benefit realization, transition, and sustainment

Full Access
Question # 90

Managing value is key to success as portfolio are undertaken to ultimately deliver an outcome that is strategically aligned and which delivers value to the organization. While managing value, the portfolio manager invokes the Benefits Realization Analysis activity. Which of the following is part of this activity?

A.

Assessing Changes, dependencies and impacts

B.

Indicating Resource bottlenecks and over or under allocations

C.

Allowing the portfolio’s governing bodies to evaluate the expected net benefits of a given portfolio or portfolios to prioritize portfolio efforts

D.

All of the options

Full Access
Question # 91

You are currently in the process of defining a portfolio by forming the qualified list of components that will be later evaluated, selected and prioritized. What do you expect as outputs from this process?

A.

Portfolio Management Plan updates, Portfolio Roadmap updates, Portfolio updates

B.

Portfolio Management Plan updates, Portfolio Roadmap updates, Portfolio updates, Portfolio Strategic Plan updates

C.

Portfolio Strategic Plan updates, Portfolio Roadmap updates, Portfolio updates

D.

Portfolio Strategic Plan update, Portfolio Management Plan updates

Full Access
Question # 92

Assume you are a member of your company's Portfolio Review Board. Your Board meets quarterly to determine which new components to undertake and selects them even if it means the portfolio then will require rebalancing. As you consider the proposed business case for a component and assess the suggestions of the other Board members, a key factor is:

A.

The depth of the proposal in terms of identification of key benefits

B.

Total available resources

C.

Overall stakeholder interest

D.

Component feasibility studies

Full Access
Question # 93

Efficiency is highly regarded when managing a portfolio and spans all activities i.e. risk management, communication management, etc. A portfolio is considered efficient if it

A.

lies above the curve

B.

Minimizes risks to the maximum

C.

lies below the curve

D.

Has the best possible expected level of return for its level of risk

Full Access
Question # 94

Your IT company has been successful as it is able to deliver projects on time without the need for rework and within the allocated budget. Your customers have been astonished with the results and are using your company for additional work, plus they have been recommending your company to others. Your company is experiencing tremendous growth and wants to ensure it can take on the new work with existing resources, both people and systems, or whether it will need to use outsourcing. Given its outstanding reputation, your executives wish to avoid the need to outsource. You have been asked to perform a capacity analysis. A best practice is to:

A.

Prepare a model of the current configuration and modify it to determine future capacity requirements

B.

Determine and document existing assumptions

C.

Inventory staff members to assess their level of competencies and existing workload

D.

Use resource leveling in an enterprise project management information system

Full Access
Question # 95

Portfolios have a lot of components in them and are executed along an extended lifecycle. For this, as a portfolio manager, you continuously monitor and control the progress and status. What input can you use to help you with this?

A.

Roadmap, Portfolio Management Plan, Portfolio, Portfolio Reports, Enterprise Environmental Factors

B.

Roadmap, Portfolio Management Plan, Portfolio, Portfolio Reports, Portfolio Process Assets

C.

Roadmap, Portfolio Management Plan, Portfolio, Portfolio Reports, Portfolio Organizational Process Assets

D.

Roadmap, Portfolio Strategic Plan, Portfolio, Portfolio Reports, Portfolio Process Assets

Full Access
Question # 96

You are the portfolio manager in a large organization including a diversity of stakeholders. From the start, you knew the importance of correctly managing the stakeholders requirements and concerns and you grouped them in order to

A.

Group stakeholders as internal and external

B.

Facilitate stakeholders identification

C.

Group stakeholders from the same functional area

D.

Group stakeholders having same concerns and interests

Full Access
Question # 97

Which of the following depicts the use of the burn-down and burn-up charts?

A.

All of the Options

B.

They show the planned vs accrued Earned Value

C.

They show the execution of the portfolio against the overall budget and time

D.

They show the burned cost and time against planned ones

Full Access
Question # 98

You are managing a portfolio linked to multiple business units and you set clear roles and responsibilities from the beginning to avoid delays and to enhance the decision making process. An unanticipated issue occurred last week, which relates to one of your team members missing to check the market fluctuating currency. In which of the following documents should you look to know which member was responsible of this?

A.

Strategic Plan

B.

Governance Model

C.

Risk Register

D.

Risk Roles & Responsibilities

Full Access
Question # 99

Assume it was your suggestion to the executive team as the newly appointed Chief Financial Officer for your organization to implement portfolio management. While someone has been identified to be the portfolio manager, you are developing the charter and the structure. In doing so, guidance is provided by the:

A.

Portfolio strategic plan

B.

Organization's strategic plan

C.

Portfolio roadmap

D.

Plans, policies, and documentation of stakeholder expectations

Full Access
Question # 100

Along your portfolio lifecycle, you have been conducting multiple review meetings to ensure continuation from one phase to another and to ensure the alignment and value delivery, in addition to communicating decisions and valuable information to the related stakeholders. Changes to the approach of portfolio governance may be a result of review meetings. Which of the following options include updates to the governance model?

A.

Portfolio Management Plan updates

B.

Portfolio Process Assets updates

C.

Portfolio Reports

D.

Portfolio Strategic Plan updates

Full Access
Question # 101

One of your company's junior portfolio managers came to you for advice. He noticed while checking the roadmap that it does not include all the portfolio components. What should be your advice to him?

A.

The roadmap does not include all of the portfolio components, it is used as a high-level timeline

B.

The roadmap should include all of the portfolio components in order to correctly depict the different timelines and milestones

C.

Whether the roadmap includes all or a part of the portfolio components, is the decision of the portfolio manager

D.

Whether the roadmap includes all or a part of the portfolio components, is the decision of the portfolio sponsor

Full Access
Question # 102

You have just finished a major checkpoint in your portfolio and the portfolio has to undergo several changes in order to re-align with the strategies. One component of your portfolio has been cancelled and the resources are going to be reallocated to other components. Which process does these activities?

A.

Manage Supply & Demand

B.

Authorize Portfolio

C.

Manage Portfolio Oversight

D.

Optimize Portfolio

Full Access
Question # 103

Assume you are the portfolio manager for your pork producing company, the market leader in your country. Over time, the industry has recovered from trichinosis as a risk. Your company has added new components to its portfolio, and many have been to demonstrate to the public that its products are safe. It implemented the Agriculture Department's and Food and Drug Administration's Hazard Analysis and Critical Control Point (HACCP) regulations and is enhancing its image as 'the other white meat'. However, now the entire industry is faced with a new epidemic known as porcine epidemic virus, which is affecting pigs in 22 different states, and profits have decreased significantly. New components now must be added to the portfolio. This situation shows:

A.

Resource re-allocation is required

B.

Risk management is essential

C.

The ROI of the new components must be determined

D.

Portfolio rebalancing has led to the new components being in the top five priority list

Full Access
Question # 104

Along the course of the portfolio, you will be recommending the initiation, termination and update of components. The governance bodies will be approving or rejecting your recommendations as part of their role in the authorization of the portfolio. As a portfolio manager, which of the following, in your opinion, is the objective/purpose of the Authorize Portfolio Process?

A.

Make Governance Decisions

B.

Allocating resources to develop component proposals or execute portfolio components

C.

Create an up-to-date list of qualified portfolio component

D.

Balance the portfolio for performance and value delivery

Full Access
Question # 105

Assume you are a functional manager in your medical device company in research and development. Your scientists have determined a new product that will be a breakthrough for the company, and you want to serve as the sponsor for this component and present it to your Portfolio Review Board. You will need resources from other parts of the company to commercialize it. As you prepare your proposal you are following the key descriptors set up by the portfolio staff and will include:

A.

Risk reduction

B.

Regulatory and compliance issues

C.

Internal and external dependencies

D.

Qualitative benefits

Full Access
Question # 106

After the stakeholder analysis is complete, a best practice is to put stakeholders into a matrix to develop a communications management strategy. A simple but useful approach is to set it up to show:

A.

Level of authority and level of interest

B.

Level of authority and level of involvement

C.

Level of influence and level of impact

D.

Level of influence and level of interest

Full Access
Question # 107

Your company has decided to invest in a revolutionary product that will make the delivery of online orders easier and will cut down the delivery time by no less than 35%. While measuring the value of the new component with relation to the market, which of the following should be used?

A.

Comparative Advantage Analysis

B.

Market Requirement Analysis

C.

Weighted Ranking and Scoring

D.

Cost-Benefit

Full Access
Question # 108

Moving from project management to program management and now being appointed as the first portfolio manager in your cyber warfare company, you know you always wondered what happened to the various reports you had to prepare, and the metrics you had to collect. You are working now to determine critical metrics for portfolio management and decided to involve as many people as possible through questionnaires and surveys. You also held some focus groups. The purpose is to:

A.

Ensure the metrics that are collected support the SMART principle

B.

Maximize portfolio value

C.

Represent the vital few rather than the trivial many

D.

Can be gathered with minimal disruption

Full Access
Question # 109

An organization decided to increase its business by 80% and approach new different clients. This strategy is followed because previously this organization was depending with its sales on only one client. With this new approach, you can describe the organization as being

A.

Pessimistic

B.

Risk Averse

C.

Risk Taker

D.

Optimistic

Full Access
Question # 110

Your goal as a portfolio manager is to develop a strong communications management plan to keep interested stakeholders informed about your progress in portfolio management. Although you have reached out to numerous stakeholders, you know other portfolio processes also can help in this process such as:

A.

Strategy

B.

Finance

C.

Governance

D.

Performance

Full Access
Question # 111

In your web app company, the portfolio is constantly changing. It is not unusual for a new proposal to be submitted each day and for other components to be terminated as a competitor was first to market. The Portfolio Review Board usually meets daily in this fast-paced environment as it:

A.

Evaluates the portfolio for specific actions it needs to take

B.

Ensures there are no open issues from past meetings that affect different components

C.

Provides a high-level view of the portfolio's direction

D.

Addresses organizational strategy

Full Access
Question # 112

When we talk about portfolios, programs and projects, it is inevitable to mention the business value which is the sum of tangible and intangible assets of an organization, also known as the net quantifiable benefit.

When it comes to business value, at which level of the organization is the pursuit of Business Value optimized?

A.

Program

B.

Portfolio

C.

Operational

D.

Project

Full Access
Question # 113

Your company is currently on the verge of bankruptcy due to the lack of transparency within the organization; this alerted the CEO to take decisive actions and request that new reporting lines be established in order to be fully transparent. The new reporting lines triggered changes in roles & responsibilities for managing communication and communication policies & constraints. Where are these changes reflected when it relates to your portfolio?

A.

Portfolio Process Assets updates

B.

Portfolio Updates

C.

Portfolio Management Plan updates

D.

Organizational Process Assets updates

Full Access
Question # 114

Assume you are working in a division in your country's Department of Interior. The Department is set up in Bureaus, and your work falls within Natural Resources. Your division is the Water Resource Division. You are responsible as the portfolio manager for the work in this Division. As you work on the portfolio for the upcoming year, you point out to the members of the Portfolio Review Committee that:

A.

The projects in the portfolio have interdependencies between them

B.

Your portfolio reflects your Division's objectives

C.

Each program and project in the portfolio have related objectives

D.

Your portfolio addresses different strategies than those in other parts of the Department

Full Access
Question # 115

The Monitor Portfolio Value process, while ongoing, has proved to be successful as you work to implement portfolio management. Within six months, you were able to show the usefulness of a simple scoring model to the Oversight Group, and they requested a more sophisticated approach in which weights could be assigned to criteria. This shows:

A.

An acceptance of portfolio management in the organization

B.

The usefulness of the portfolio roadmap

C.

A link between using scoring models and benefits analysis

D.

The importance of documenting lessons learned

Full Access
Question # 116

Communication is one of the largest activities that the portfolio manager does along the portfolio lifecycle. As an experienced portfolio manager, you know that communication and information needs vary between portfolios, programs and projects. How do you define the difference in those three levels of Project Management?

A.

Communications at a Program level are more diversified than at project and portfolio levels Communications at a Portfolio level are more diversified than at project and program levels

B.

Communications at a Project level are more diversified than at portfolio and program levels

C.

Criticality of the communication with relation to the organization is highest at a project level as the business value is acquired at this level

Full Access
Question # 117

A new portfolio is initiated with you as the portfolio manager, you started by developing the portfolio strategic plan and are currently reviewing the Organizational Process Assets; which of the options can be a part of this input?

A.

List of portfolio components and Portfolio component selection criteria

B.

Portfolio Components files

C.

Inventory of Work

D.

IT Strategies and Policies

Full Access
Question # 118

Each time the Portfolio Governance Group meets the goal is to review the existing components and any that are proposed to ensure the portfolio has the best mix to attain strategic objectives. As the portfolio manager, you find these meetings, if facilitated accordingly, are effective decision-making sessions. However, you tend to have open issues after every meeting. These open issues:

A.

Should be tracked in an issue register

B.

Are managed as described in the charter

C.

Are considered portfolio process assets

D.

Require an owner to manage them until they are closed

Full Access
Question # 119

The Portfolio Performance Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Performance Management Plan purpose and focus?

A.

Identifies recipients for information associated with the portfolio management process

B.

Shows how and when the portfolio resources will be planned, balanced, and allocated to the portfolio components

C.

Describes the approach and intent of management in identifying, approving, procuring, prioritizing, balancing, managing, and reporting a portfolio

D.

Articulates the options, preferences, and factors that will be considered in a specific portfolio

Full Access
Question # 120

Working as a portfolio manager in the Water Resources Department of the U.S. Geological Survey, you are following a scorecard approach to report progress to your executives on the components in your portfolio. You submit the scorecards monthly, and based on their results, your executives decide if a Portfolio Review Board meeting should be held. Your emphasis in these reports is to:

A.

Chart progress toward strategic goals and objectives

B.

Measure performance against targets and thresholds

C.

Display raw data in a visual graph

D.

Display data using a traffic light approach

Full Access
Question # 121

Working to manage portfolio value is a continuous task. In doing so, as the portfolio manager, you review the monthly and any ad hoc reports submitted by component managers. This month you saw there was an excellent opportunity for major cost savings in two components in the top five on the portfolio list; however, to realize this cost reduction, these components require resources to be reallocated from other components in progress for six months. These forecasts then:

A.

Should be verified by independent estimators for accuracy

B.

Require validation by the CFO and his staff

C.

Should be accompanied by an analysis of earned value data to ensure the components are using the same method of reporting

D.

Are recommended for consideration by the Portfolio Review Board

Full Access
Question # 122

You have been newly appointed as a portfolio manager and found out that your predecessor did not develop a Portfolio Risk Management plan as he thought that it is not necessary in the case where he has a risk register. One of your first activities was to develop the missing plan. To do this, you needed to consult with stakeholders in order to fetch risk information in order to identify risks and plan risk management. Which of the following inputs to this process will help you in identifying which stakeholders to analyze?

A.

Portfolio Process Assets

B.

Portfolio Communication Management Plan

C.

Portfolio Risk Management Plan

D.

Elicitation technique

Full Access
Question # 123

Your State Governor is fiscally conservative and has limited significantly the financial resources to be provided to each University in the eight Universities in the State's system. Recognizing your University is going to have a 55% reduction in its budget, your Chancellor is re-evaluating all the work that is under way to see how much it can do with fewer resources. Every department will have layoffs at all levels. However, the University does have a portfolio management process in place, which people support. This means for effective portfolio management:

A.

Each portfolio in the University should have the same restrictions in terms of available funding

B.

An effective resource assignment process is required

C.

Pareto analysis should be used to focus attention on those components with the greatest impact

D.

Portfolio maturity should be a factor in determining plans and decisions

Full Access
Question # 124

Each time a strategic change occurs, it requires a number of updates, and it includes the need to update the portfolio process assets including:

A.

Timelines

B.

Prioritization model

C.

Lessons learned

D.

Communication requirements

Full Access
Question # 125

In a portfolio, data is an abundant asset, and managing the information aiming for a a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. These methods are performed in 4 of the portfolio management processes and serve a slightly different purpose in each and every one of them. When it comes to the optimizing portfolio, what is the purpose of using this analysis?

A.

Performing Status and trend analysis, Rebalancing methods, Investment choice tools, exposure charts

B.

Performing resource leveling, project sequencing techniques and dependency analysis

C.

Performing Quantitative analysis and Sensitivity analysis

D.

Performing Cost-benefit analysis, quantitative analysis, scenario analysis, probability analysis, SWOT analysis, Market/competitor analysis and business value analysis

Full Access
Question # 126

Assuming a portfolio manager position means one has more stakeholders than in program, project, or operational roles. The goal is to identify all interested stakeholders but often overlooked are:

A.

Consumer groups

B.

Alliances

C.

Associations

D.

External resource providers

Full Access
Question # 127

Your CEO was fired because of a decline in the company's profits by the Board of Directors. They have now hired a new CEO, who plans to re-shape the portfolio and has changed the company's strategic goals and objectives. The new CEO will continue the existing product line of soap products that the company has manufactured for the past 50 years but now will manufacture new products to focus on the baby boomer generation as they retire but desire to maintain a youthful appearance. It also will offer other products to new high school and college graduates who want to appear older. As the portfolio manager you should:

A.

Determine the overall impact to the portfolio performance

B.

Determine investment requirements to move to these markets

C.

Assess the competencies of the existing staff to support these new products

D.

Evaluate whether the new products can be outsourced to reduce time to market

Full Access
Question # 128

With the increasing use of drywall, your company, which has been in the plaster business for over three generations, is finding it harder to maintain a share of the market and to achieve a positive return on its investments. Three years ago, the corporate executives implemented a portfolio process, and they serve as the Portfolio Governance Council. They meet monthly, and after each meeting, you prepare a report of their decisions. This report is:

A.

Sent to all employees in the company as it focuses on employee empowerment and involvement

B.

Distributed only to the Governance Council to serve as a record of their meetings

C.

Is used to authorize the portfolio

D.

Is used to analyze the effects of their decisions on the company's portfolio

Full Access
Question # 129

As the portfolio manager you have worked to consider the complexities involved of the interdependencies in your programs, projects, and ongoing work. As your portfolio process has been implemented for three years, a key challenge is that senior executives tend to change priorities often even though programs and projects are being implemented. Often these programs and projects are cross-functional, and the result is your process is not coordinated. You recognize there is a need to change, and you met with the Chair of the Portfolio Review Board and have her support for a transparent approach for portfolio standards and prioritization. You should:

A.

Revise the balancing process

B.

Revise the portfolio management plan

C.

Revise the scoring model

D.

Set up a standard method to communicate change

Full Access
Question # 130

Different stakeholders will have different portfolio reporting requirements. Sponsors for example will have a great interest in:

A.

If the portfolio will meet organizational strategy

B.

Status in achieving benefits

C.

Overall portfolio value

D.

Status in terms of other authorized components

Full Access
Question # 131

Your probability and impact assessment work is complete, and you are using the results to prepare the portfolio risk management plan. As you do so, it also is useful to:

A.

Define the assurance levels of the risk and its performance measures

B.

Validate with your stakeholders that your analysis meets their expectations

C.

Communicate the results with others in the organization for greater transparency

D.

Identify specific trends for each risk using qualitative and quantitative analysis

Full Access
Question # 132

A new sponsor was appointed by the company in order to push more on the investments underway. The new sponsor wants detailed information on time and money and wants to get things done quickly. Which element of the portfolio management plan will be referred to for managing the sourcing of key resources?

A.

Portfolio Oversight

B.

Governance Model

C.

Communication Management Plan

D.

Performance Management Plan

Full Access
Question # 133

You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You have just finalized managing the strategic change and you are expected to present the following documents:

A.

Portfolio Strategic Plan update, Portfolio Roadmap update, Portfolio Charter update, Portfolio Process Assets update, Portfolio update

B.

Portfolio Strategic Plan update, Portfolio Management Plan update, Portfolio Roadmap update, Portfolio Charter update, Portfolio Process Assets update, Portfolio update

C.

Portfolio Strategic Plan update, Portfolio Roadmap update, Portfolio Charter update, Portfolio Process Assets update, Organizational Process Assets update

D.

Portfolio Strategic Plan update, Portfolio Roadmap update, Portfolio Charter update, Organizational Process Assets update, Portfolio Management Plan update

Full Access
Question # 134

When managed correctly, the balanced scorecards can change the way an organization does business. Balanced scorecards keep focus on results. As a portfolio manager, you use the balanced scorecards while developing the Portfolio Management Plan in order to

A.

Ensure alignment to organizational strategy and objectives

B.

Ensure alignment to investment risk, and dependencies

C.

Ensure alignment to expected return on investment (ROI)

D.

All of the options

Full Access
Question # 135

When it comes to managing the portfolio value, one of the junior portfolio managers came to you asking about the relation between cost-benefit analysis and the efficient frontier analysis. What should your answer to her be?

A.

The Efficient frontier analysis is used while performing the Cost-benefit analysis in order to get the confidence factor in the estimates

B.

Efficient frontiers are not static, and organizations should monitor cost-benefit ratios on a continual basis

C.

Efficient frontier tracks the realized value against planned costs; thus is another way of cost-benefit analysis

D.

Cost-Benefit analysis are not static, and organizations should monitor the efficient frontier ratios on a continual basis

Full Access
Question # 136

Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. Risk is incorporated in all process groups as well. As a portfolio manager, how do you map the risk management elements to process groups?

A.

Risk Planning (Defining) - Risk Assessment & Response (Aligning)

B.

Risk Assessment (Defining) - Risk Planning (Aligning) - Risk Response (Authorizing & Controlling)

C.

Risk Planning (Defining) - Risk Assessment (Aligning) - Risk Response (Authorizing & Controlling)

D.

Risk Planning (Defining) - Risk Assessment (Planning) - Risk Response (Authorizing & Controlling)

Full Access
Question # 137

As part of the annual planning, PMO has started to group initiatives managed under each portfolio in the organization. The collected list will be used in developing the new Portfolio Strategic Plan. What is this collected list called?

A.

Portfolio

B.

Portfolio Component Inventory

C.

Portfolio Process Assets (PPAs)

D.

Inventory of Work

Full Access
Question # 138

What can you tell about the following portfolio status, having CPI weight = 80% and SPI weight = 20%

Larger image

A.

Work is not performing well and outside of range

B.

Work is not preforming well but within range

C.

Work is progressing as planned and within range

D.

Work is progressing as planned but outside range

Full Access
Question # 139

Your company has a stated policy that all stakeholders are to be treated in an ethical manner. It is one of the largest project management training firms in the world and is a Registered Educational Provider with the Project Management Institute as well as with other associations. It is active in portfolio management to ensure it is offering the most beneficial products and services, both leading edge and traditional, to its customers. Its policy toward its stakeholders is:

A.

Documented in the stakeholder expectations plan

B.

Considered as a legitimate right

C.

Part of the portfolio communications strategy

D.

A portfolio governance process

Full Access
Question # 140

Information and direction about the organization's vision, mission, prioritization, and resources should be obtained before the portfolio's strategic plan is developed by reviewing:

A.

Knowledge repositories

B.

Portfolio roadmap

C.

Organizational process assets

D.

Governance model

Full Access
Question # 141

As a result of optimization, one of the components was deemed necessary to be terminated. One of the executive managers found about this and called you telling you that you should leave this component as it is of interest to her and she wants to see it finalized and that she will make resources available to it if needed. What should be your best course of action?

A.

Ask the steering committee for more resources in order to be able to continue with this component

B.

Ask the senior manager directly for resources as you know that this component requires additional resources

C.

Highlight the issue in the governance board meeting and recommend termination based on facts and thorough analysis

D.

Continue working on the component as you have the support of one of the senior managers

Full Access
Question # 142

The sponsor came to you asking for a high level timeline to depict the approach that you will take to execute this portfolio. What tools and techniques is useful in your case?

A.

Strategic Alignment Analysis, Prioritization Analysis, Portfolio Component Inventory

B.

Gap Analysis, Readiness Assessment, Stakeholder Analysis

C.

Scenario Analysis, Capability & Capacity Analysis

D.

Prioritization Analysis, Interdependency Analysis, Cost-Benefit Analysis

Full Access
Question # 143

You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. The Portfolio Risk Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding its purpose and focus?

A.

Updates standard criteria to allow the portfolio team to assess the risks that are identified

B.

Identifies recipients for information associated with the portfolio management process

C.

Shows how the portfolio component progress and resource-related issues and risks are integrated with the resource management activities

D.

Articulates the options, preferences, and factors that will be considered in a specific portfolio

Full Access
Question # 144

Due to multiple issues, there were changes in the reporting process in your portfolio; the meetings with their frequencies have been changed and this will also affect the reporting cycle times. In order to meet this new change you will update which of the following documents?

A.

Communication Strategy Matrix

B.

Communication Calendar

C.

PMIS

D.

Communication Matrix

Full Access
Question # 145

Assume after the acquisition of the natural gas transmission company by your company, a natural gas distribution company, was approved by the various regulatory agencies. You now are overseeing more components with this acquisition as the portfolio manager. While you had each of the components in your company set up in various categories, this approach had not been followed by the transmission company. You explained to its portfolio manager and staff such an approach enables:

A.

Common criteria for portfolio optimization

B.

A similar approach to track contribution to strategic goals

C.

A way to set up a common set of decision filters

D.

An alignment with the prioritization model

Full Access
Question # 146

In a portfolio, data is an abundant asset, and managing the information aiming for a a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. These methods are performed in 4 of the portfolio management processes and serve a slightly different purpose in each and every one of them. Considering that you are currently working to ensure resource capacity is optimally allocated against resource requirements or demand based on known organizational priorities and potential value, how can you make use of the quantitative and qualitative analysis?

A.

Performing Status and trend analysis, Re-balancing methods, Investment choice tools, exposure charts

B.

Performing Quantitative analysis and Sensitivity analysis

C.

Performing Cost-benefit analysis, quantitative analysis, scenario analysis, probability analysis, SWOT analysis, Market/competitor analysis and business value analysis

D.

Performing resource leveling, project sequencing techniques and dependency analysis

Full Access
Question # 147

Portfolios include a lot of work and as a portfolio manager you need to keep an eye on the value realization while maintaining the strategic alignment. You are currently aggregating value delivered by the portfolio components. What outputs do you expect to get out of this?

A.

Roadmap updates, Portfolio Management Plan updates, Portfolio Reports, Portfolio Process Assets updates, Portfolio Component Reports updates

B.

Roadmap updates, Portfolio Management Plan updates, Portfolio Reports, Portfolio Process Assets updates

C.

Roadmap updates, Portfolio Management Plan updates, Portfolio Reports, Portfolio Process Assets updates, Portfolio Strategic Plan updates

D.

Portfolio Reports, Portfolio Management Plan updates, Portfolio Process Assets updates

Full Access
Question # 148

comes to this type of organizations, which of the following statements is true?

A.

Human Resources should be fixed and work should be allocated based on the capacity and capability

B.

Resource Supply is continuously adjusted through permanent and temporary resources

C.

Projects that align with strategic objectives should be initiated even if the ROI is negligible

D.

All incoming projects and customers’ requests should be accepted and resources should be supplied whether permanently or temporarily