Assume you are putting together for the Portfolio Review Board several options for consideration of potential components and current components. You are using an approach with different probabilities to determine outcomes and EMV. Which of the following would you recommend realizing Components A and B are new, while C and D are in progress:
You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio. Which of the following capability and capacity analysis is used to limit the number OR size of components the organization can execute?
A new portfolio manager in your organization is currently preparing his portfolio charter and has come to you asking advice about what should be present in charter
You have been assigned as a consultant to give your expertise on a failing portfolio which is critical to the success of your client's organization. You are now in the process of reviewing the portfolio management plan. What do you expect to see as part of this plan?
Assume you are managing a high visibility project in your company that once it is completed will transform it into new markets and be the leader in the soft phone field. You are keeping the project a secret from external stakeholders, and you and your team have signed Non-disclosure agreements (NDAs). However, the executives and those on the Portfolio Review Board want status information on this project every two weeks. You provide it:
As you grow older, you gain more experience and things that once seemed hard to assimilate, can become very easy. One junior member of your portfolio management team is confused on the relationship between the Optimize, Authorize and Provide Oversight processes. What could your advice to him be?
Your company acquired another company. The sponsor asked you to check the other company's current inventory of work and see what could be added to your current portfolio. You have a meeting coming up to show the sponsor the portfolio dependencies. Which document should you be showing him?
Strategies are changing, the portfolio mix is changing, the portfolio is progressing and you are doing a great job optimizing the mix of components. What tools and techniques are you using in the case?
When managed correctly, the balanced scorecards can change the way an organization does business. Balanced scorecards keep focus on results. Which of the following are factors that can be targeted by the Balanced Scorecards method?
Working to ensure the portfolio management process is one that is followed and is embraced has been a major challenge. As the portfolio manager, assume you set up meetings with the Portfolio Governance Group bi-weekly since there is constant change in your telecom company. You also want the portfolio process to be transparent. To do so, a useful tool to communicate status is:
Each portfolio risk should have a designated person as its owner. As the portfolio manager assigns the owner, the main responsibility is to:
Optimizing the portfolio is a major recurring process that the portfolio manager performs throughout the portfolio life cycle in order to balance the mix of portfolio components. During this process, the portfolio manager uses a number of graphical analytical methods to help him ease the process. Which of the following is not a graphical analytical method used in this process?
One of the major resources on your portfolio is needed by two of the components at the same time. This resource has high technical knowledge and is aware of all the business needs. Which of the following tools and techniques can you use in order to solve this issue?
One of your components' managers came to you stating that she cannot find a key stakeholder by email and if she cannot find him, a major decision will be delayed, thus affecting the entire portfolio. What should you, as a portfolio manager do?
Assume you are the portfolio manager for your training company. It decided to implement portfolio management in a major way to ensure it remained competitive in the changing market and could offer a variety of methods to deliver courses rather than only in a face-to-face setting. The company set up a Portfolio Management Group, and you are responsible for providing information on portfolio status and then providing information to those interested stakeholders about the Board's decisions. You want to make sure the reports meet stakeholder requirements. After performing a detailed communications requirements analysis, you found it interesting that stakeholders wanted information about:
Assume your automotive company is new to formal portfolio management. It has had for years a strategic plan and tries to be first to market for new and improved features on its vehicles each model year. You were hired as the portfolio manager to provide a more disciplined approach for determining new products to pursue as well as existing ones that should be terminated. So far, you have set up an approach, established categories for the various components, and determined a method to rank and score new proposals for consideration. Now you are working to set up practices to follow to optimize the portfolio. In doing so, it is important to note that:
One of the ten underlying principles of portfolio management involves a strategic focus. Assume you are going to have a short meeting with your CEO tomorrow, and you want to succinctly describe it. You will tell the CEO it is important since it:
You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the performance closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust performance management plan. What is expected to be found in this plan?
In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. Which of the following are considered outputs to the Manage Portfolio Information process?
A portfolio manager needs to continuously balance the need and requirements with the available resources to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to developing the charter, and in order to complete the portfolio structure, the capability and capacity analysis is used to
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You are currently in the process of identifying and analyzing risk, in addition to developing risk responses and monitoring and controlling risk. Which documents can help you achieve this?
Assume your consulting company tried portfolio management in the past, but it was not embraced. Instead, people received bonuses if they were able to acquire new work regardless if it fit the company's strategic plan. However, the company was sold, and the new executive team asked you to be the portfolio manager. You explained it did not work in the past, but the new team has pointed A. out while a lot of work was won competitively, much of it was for small dollar amounts, and resources are misallocated. The new approach is to focus on business value, which has as its goal to:
B. As chieve the greatest return on investment to the organizationBb. aximize productivity and increase overall customer satisfaction
C. Deliver the maximum value aligned with strategic objectives
D. Focus on those opportunities that have the greatest likelihood of successful completion
The Portfolio Management Office (PMO) provides support to the portfolio manager throughout the portfolio life cycle. Which of the below is not something that the PMO supports the portfolio manager with?
Updates to schedules i.e. resource, funding, benefits, are results of Developing the Portfolio Performance Management Plan process. Where should these updates be recorded?
The portfolio manager defines the portfolio based on a listing of already existing work in the organization and selects the right components in order to be able to prioritize them. What do you use for defining the portfolio based on the listing of work?
When managed correctly, the balanced scorecards can change the way an organization does business. Balanced scorecards keep focus on results. As a portfolio manager, you know that the purpose of using the balanced scorecards is
Managing Strategic Change is an integral part of any portfolio in order to remain aligned with the strategic objectives. Your portfolio has undergone a major strategic change and you are currently determining the volume of work required to do in order to re-align the portfolio. What are you currently using?
By setting up portfolio categories and using a pair-wise comparison approach to rank components, as the portfolio manager, you feel that you are finally setting up and getting people to follow standard portfolio practices. Since portfolio management still is relatively new, progress is under way. As some components are added, and others are not continued, you are making sure if a component is terminated that it does not have dependencies with others in the portfolio. You need to then:
Capability and capacity analysis are useful tools in portfolio performance management. In using this type of analysis a best practice is to:
Assume your telecom company is time constrained and needs to be first to market with new smart phones with features that are different from those of the competition and also have the traditional features desired by your existing customers. The Portfolio Review Board meets weekly to assess performance and to consider new components. Lack of technical resources is a recurring issue. To make the case for acquiring new resources, you decided to assess capability and capacity. This approach is:
Your company's new CEO has set an aggressive target and informed everyone that the target needs to be met by all means in order for the company to be able to realize benefits and avoid bankruptcy. What is the best management approach that the portfolio manager should take in this case?
For governments worldwide, you normally have a lot of people reluctant to change and to using new technology tools especially for communication. You are managing a governmental portfolio and planning for a transformational endeavor. You are currently depicting the various communication media and methods to be used, where is this information normally used?
Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options helps in comparing the current portfolio mix to the new strategic direction in order to determine the needed changes?
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. For this you start by developing the strategic plan. What output do you expect from this process?
Working to monitor the portfolio especially in terms of its value to the organization, you had each component manager prepare monthly variance reports. Of the components ranked in the top 10, six of them realized they would not require some of their initial funding and still would be completed as planned. This means:
Assume you are the portfolio manager for a telecommunications company. Your company was about to launch a new and easy to use smart phone with more features than any existing phones on the market at a lower price. However, although the phone was due to market in five days, the Federal Communications Commission issued today a regulation that would make your new phone not available for use in airplanes. Thus additional work must be done, and your executives are wondering whether a new phone should be developed for this new feature. You are ensuring that if a new phone is developed, or if the almost completed product is not to be marketed, there is still alignment to the organization's strategy. As you complete an analysis of alternatives, you also should ensure results of the analysis are reflected in the:
Resources allocation and optimization for use is key to a successful portfolio. You have assigned human resources, funds and other required assets to a component that you have initiated recently. What should have been done prior to being able to to that?
In your opinion as a portfolio manager, which of the following is considered one of the portfolio's concerns?
Risk Management is integrated in all the other processes and process groups and is an integral recurrent activity throughout the portfolio life cycle. Which of the following is considered the most effective method for analyzing the effect of risks on portfolio strategic objectives, and determining whether they have high or low effect
Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options shows a clear path from the "as-is" to the "to-be" vision?
Your company works closely with the government on the implementation of water pumps for rural areas. You are constantly dealing with new and updated regulations, and periodically adapting the portfolio to the changes. When it comes to regulatory components, how do you include the components in the portfolio?
As soon as you complete the portfolio risk management plan, and you have been working on it now with a team, you realize you need to update some organizational process assets such as:
Working to prepare the portfolio performance management plan, assume you have been involving others in the process to help secure their later support of the plan. You also reviewed historical information and other artifacts. Not to be overlooked is a/an:
As a portfolio manager you try to use all the information available to you in order to get the best out of the existing information and to better plan and manage the portfolio. The Enterprise Environmental Factors are important and referenced throughout the portfolio life cycle. Which of the following is correct regarding their purpose and focus?
Your company got recently acquired by another company and the strategic directions which your portfolio is based on have been changed. Which document do you, as a portfolio manager, change to reflect the portfolio new vision?
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you continuously report risks and issues to stakeholders. One of the key stakeholders is furious as he cannot find an issue that has occurred a week ago in the risk register. What should you do in this case?
The Portfolio Management Office plays an integral role in Portfolio Management and offers support to the portfolio manager throughout the portfolio life cycle. What is the role of the PMO with respect to the portfolio performance metrics?
Your sponsor has urged you to analyze Portfolio Risk before the end-of-week governance board meeting as the CEO will be present and is interested in Portfolio risk data in particular. Currently, you do not have adequate risk information in order to analyze data and give recommendations. Which tool is the most suitable for you to use in this case?
As part of the portfolio communication management, multiple documents are prepared in order to effectively manage communications. The Stakeholder matrix is one of the prepared documents, what does it include?
The portfolio management process ensures the components are aligned to goals. However, it is driven by:
You have set a series of meetings with your portfolio team members as an answer to the identification and update of the organization near-term budget and plans. As a result you have defined and developed the portfolio strategic goals, near-term budgets, and plans, and you now want to start managing ongoing portfolio activities. What is the focus of what you are doing?
As you are the portfolio manager for your state government agency, which is undergoing a series of budget cuts, you are focusing attention on managing risks to the portfolio as the budget is reduced. You realize in this process the time and budget for risk management also will be reduced; these data are in the:
Enterprise environmental factors (EEFs) may constrain portfolio management options and may have a positive or negative influence on the outcome. Which of the following is not considered part of the EEFs?
You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio. Which of the following capability and capacity analysis is used to just limit the number of components the organization can execute?
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You started with developing the plan that will be used as guideline for the component plans to manage risks at their level. What are the outputs of this plan?
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. Risk Categories, criteria and probability and impact are updated as a result of Developing the Risk Management Plan. These updates are recorded in which of the following?
Programs and projects in your company, one of the largest banks in the world, are required to submit metrics as to their individual progress each month. To simplify the collection and reporting process, you held interviews with members of the Portfolio Review Board to see their areas of greatest interest and also with program and project managers to determine how difficult it would be to collect the data. You then selected 10 possible metrics to the Board, with a goal that five would be regularly reported. It is important to note that:
You are managing a large portfolio and are approaching to a major checkpoint. As a portfolio manager, you are now collecting information and reports from various components for aggregation and presentation. What method/tool can you use to support you in this process?
The PMO in your company is newly established and one of its first results was allowing the portfolios to use a new communication method to disseminate the information faster. With relation to your portfolio, where should this new communication be stored?
In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. Which of the following help you with managing the portfolio value?
Assume you are the portfolio manager for a company that specializes in software, including portfolio management software. It has many components under way to enhance the existing product line but also to move the company into Cloud computing. You regularly prepare reports on the portfolio status but lately have had a large number of stakeholders request ad hoc reports. You decided to survey your stakeholders to learn about their information needs. You next decided to hold some one-on-one interviews with several interested and influential stakeholders in terms of communications requirements. From these interviews you are concerned that some stakeholder groups may be missing so you decided to:
You are the portfolio manager for a large and complex portfolio with a low risk appetite. You are currently planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes. Which of the following tools focuses on pricing and sales forecast?
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. One of your team members came to you asking about the order of the steps used to perform risk management activities. What should be your answer to him?
As you work to determine which of four possible components to optimize the portfolio, assume you are using the internal rate of return as the key crite rion to make your recommendation. Only one new component can be added based on financial constraints. Each of the four potential components has benefits that support the strategic plan. Based on the following data, you recommend:
Risk is inherent in all activities and managing risk is critical to a successful portfolio. Risks perspectives differ within the organization between executive management, operations management, portfolio management and project/program management. When it comes to Portfolio management, which of the following is a risk concern?
Your CEO is keen to know the expected value of multiple components that interest him and wants you to give him a comparison of the expected value across components. You are currently looking for a tool to facilitate comparison of expected value across components and support informed portfolio decision making. What are you looking for?
Portfolio Prioritization Model is included in the Portfolio management plan and guides the ongoing decisions as to which portfolio components should be added, terminated, or changed; which of the following is correct regarding the Prioritization Model purpose and content?
Chartering the portfolio is an important step towards the initiation of the endeavor. It authorizes the portfolio managers to use the resources and marks the first step towards the allocation of resources to the components upon their initiation. Which of the below can help you while developing the charter?
As a portfolio manager you visit and re-do the Optimize Portfolio process continuously. Which of the following, in your opinion, is the objective/purpose of the Optimize Portfolio Process?
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risks is key to success, and you are coaching your team on the same. While planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes. Which of the following tools determines the effects of portfolio velocity?
While managing portfolio communications, the portfolio manager needs to account for the communication needs of the component teams in order for them to stay in the loop of the big picture. Which of the following can be of interest to this group of stakeholders?
The interest, influence, and communication needs of business operational stakeholders who are looking to ensure alignment between portfolio components, while minimizing negative impact and maximizing positive benefits of all portfolio-managed changes to their business operations, relate to which type of stakeholders?
As you work to determine which stakeholders had the highest degree of influence over the portfolio, you wanted to especially know about the members of the Portfolio Governance Board because:
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You have just finalized the development of the risk management plan. What do you normally expect to find in a Portfolio Risk Management Plan?
You have just finished the development of the Portfolio Communication Management Plan. The portfolio team is looking for portfolio value assessment, status reports, and portfolio forecast with variance to plan. Where should they find this information?
Your company, which has been in the blimp business for over 50 years, prides itself on its robust portfolio management process, which is especially useful now that the demand for blimps of various sizes is much greater than the capacity to produce them. One of the reasons the blimp company has been so successful over the years is it has central management of all of its resources. This approach is important:
With the introduction of new legislation in your company, anyone now is entitled to medical services regardless of whether or not they are employed or have any pre-existing health conditions. Your insurance company's executives have been tracking this legislation as it means significant changes for your company; many employers who obtained insurance through your company may go elsewhere for lower costs. Recognizing this legislation may lead to a loss of revenue, your company decided to merge with another insurance firm to obtain greater market share. This merger, though, means some existing projects may not be needed, and the workforce will be reduced by 20 percent, Such a significant change will impact how components are categorized in your portfolio leading to:
You have set a meeting with your portfolio team members as an answer to the identification and update of the organization near-term budget and plans. One of your team members asked you of the goal of what is being done. Your answer to him should be
In a portfolio you have a continuous interaction between the portfolio and its components. The approach is top down when it comes to offering guidelines and approaches and becomes bottom up when the components report status and progress to the portfolio. What is the relation between the portfolio and portfolio components when it comes to defining the performance measures and targets (metrics)?
You are currently creating portfolio scenarios (what-if analysis) by reviewing components against prioritization criteria and using analysis techniques (e.g., options analysis, risk analysis, SWOT analysis, financial analysis). You are doing this in order to
A new project manager was given an assignment on one of the components in your portfolio. What will you do as a portfolio manager in order to align the project manager with the strategic direction and integrate him/her with the work in progress?
Consider you have the following efficient frontier graph with multiple portfolios on it. Which portfolio do you choose?
Larger image
Assume you work for a technology company that is publically owned, and the value of its stock is tracked daily by the CFO and is reported to the portfolio manager. Quarterly meetings are held with stockholders as the company went public through an Initial public offering (IPO) last year. These stockholders:
One key artifact to review as the portfolio communications management plan is prepared is the:
Managing value is key to success as portfolio are undertaken to ultimately deliver an outcome that is strategically aligned and which delivers value to the organization. While managing value, the portfolio manager invokes the Benefits Realization Analysis activity. Which of the following is part of this activity?
You are currently in the process of defining a portfolio by forming the qualified list of components that will be later evaluated, selected and prioritized. What do you expect as outputs from this process?
Assume you are a member of your company's Portfolio Review Board. Your Board meets quarterly to determine which new components to undertake and selects them even if it means the portfolio then will require rebalancing. As you consider the proposed business case for a component and assess the suggestions of the other Board members, a key factor is:
Efficiency is highly regarded when managing a portfolio and spans all activities i.e. risk management, communication management, etc. A portfolio is considered efficient if it
Your IT company has been successful as it is able to deliver projects on time without the need for rework and within the allocated budget. Your customers have been astonished with the results and are using your company for additional work, plus they have been recommending your company to others. Your company is experiencing tremendous growth and wants to ensure it can take on the new work with existing resources, both people and systems, or whether it will need to use outsourcing. Given its outstanding reputation, your executives wish to avoid the need to outsource. You have been asked to perform a capacity analysis. A best practice is to:
Portfolios have a lot of components in them and are executed along an extended lifecycle. For this, as a portfolio manager, you continuously monitor and control the progress and status. What input can you use to help you with this?
You are the portfolio manager in a large organization including a diversity of stakeholders. From the start, you knew the importance of correctly managing the stakeholders requirements and concerns and you grouped them in order to
Which of the following depicts the use of the burn-down and burn-up charts?
You are managing a portfolio linked to multiple business units and you set clear roles and responsibilities from the beginning to avoid delays and to enhance the decision making process. An unanticipated issue occurred last week, which relates to one of your team members missing to check the market fluctuating currency. In which of the following documents should you look to know which member was responsible of this?
Assume it was your suggestion to the executive team as the newly appointed Chief Financial Officer for your organization to implement portfolio management. While someone has been identified to be the portfolio manager, you are developing the charter and the structure. In doing so, guidance is provided by the:
Along your portfolio lifecycle, you have been conducting multiple review meetings to ensure continuation from one phase to another and to ensure the alignment and value delivery, in addition to communicating decisions and valuable information to the related stakeholders. Changes to the approach of portfolio governance may be a result of review meetings. Which of the following options include updates to the governance model?
One of your company's junior portfolio managers came to you for advice. He noticed while checking the roadmap that it does not include all the portfolio components. What should be your advice to him?
You have just finished a major checkpoint in your portfolio and the portfolio has to undergo several changes in order to re-align with the strategies. One component of your portfolio has been cancelled and the resources are going to be reallocated to other components. Which process does these activities?
Assume you are the portfolio manager for your pork producing company, the market leader in your country. Over time, the industry has recovered from trichinosis as a risk. Your company has added new components to its portfolio, and many have been to demonstrate to the public that its products are safe. It implemented the Agriculture Department's and Food and Drug Administration's Hazard Analysis and Critical Control Point (HACCP) regulations and is enhancing its image as 'the other white meat'. However, now the entire industry is faced with a new epidemic known as porcine epidemic virus, which is affecting pigs in 22 different states, and profits have decreased significantly. New components now must be added to the portfolio. This situation shows:
Along the course of the portfolio, you will be recommending the initiation, termination and update of components. The governance bodies will be approving or rejecting your recommendations as part of their role in the authorization of the portfolio. As a portfolio manager, which of the following, in your opinion, is the objective/purpose of the Authorize Portfolio Process?
Assume you are a functional manager in your medical device company in research and development. Your scientists have determined a new product that will be a breakthrough for the company, and you want to serve as the sponsor for this component and present it to your Portfolio Review Board. You will need resources from other parts of the company to commercialize it. As you prepare your proposal you are following the key descriptors set up by the portfolio staff and will include:
After the stakeholder analysis is complete, a best practice is to put stakeholders into a matrix to develop a communications management strategy. A simple but useful approach is to set it up to show:
Your company has decided to invest in a revolutionary product that will make the delivery of online orders easier and will cut down the delivery time by no less than 35%. While measuring the value of the new component with relation to the market, which of the following should be used?
Moving from project management to program management and now being appointed as the first portfolio manager in your cyber warfare company, you know you always wondered what happened to the various reports you had to prepare, and the metrics you had to collect. You are working now to determine critical metrics for portfolio management and decided to involve as many people as possible through questionnaires and surveys. You also held some focus groups. The purpose is to:
An organization decided to increase its business by 80% and approach new different clients. This strategy is followed because previously this organization was depending with its sales on only one client. With this new approach, you can describe the organization as being
Your goal as a portfolio manager is to develop a strong communications management plan to keep interested stakeholders informed about your progress in portfolio management. Although you have reached out to numerous stakeholders, you know other portfolio processes also can help in this process such as:
In your web app company, the portfolio is constantly changing. It is not unusual for a new proposal to be submitted each day and for other components to be terminated as a competitor was first to market. The Portfolio Review Board usually meets daily in this fast-paced environment as it:
When we talk about portfolios, programs and projects, it is inevitable to mention the business value which is the sum of tangible and intangible assets of an organization, also known as the net quantifiable benefit.
When it comes to business value, at which level of the organization is the pursuit of Business Value optimized?
Your company is currently on the verge of bankruptcy due to the lack of transparency within the organization; this alerted the CEO to take decisive actions and request that new reporting lines be established in order to be fully transparent. The new reporting lines triggered changes in roles & responsibilities for managing communication and communication policies & constraints. Where are these changes reflected when it relates to your portfolio?
Assume you are working in a division in your country's Department of Interior. The Department is set up in Bureaus, and your work falls within Natural Resources. Your division is the Water Resource Division. You are responsible as the portfolio manager for the work in this Division. As you work on the portfolio for the upcoming year, you point out to the members of the Portfolio Review Committee that:
The Monitor Portfolio Value process, while ongoing, has proved to be successful as you work to implement portfolio management. Within six months, you were able to show the usefulness of a simple scoring model to the Oversight Group, and they requested a more sophisticated approach in which weights could be assigned to criteria. This shows:
Communication is one of the largest activities that the portfolio manager does along the portfolio lifecycle. As an experienced portfolio manager, you know that communication and information needs vary between portfolios, programs and projects. How do you define the difference in those three levels of Project Management?
A new portfolio is initiated with you as the portfolio manager, you started by developing the portfolio strategic plan and are currently reviewing the Organizational Process Assets; which of the options can be a part of this input?
Each time the Portfolio Governance Group meets the goal is to review the existing components and any that are proposed to ensure the portfolio has the best mix to attain strategic objectives. As the portfolio manager, you find these meetings, if facilitated accordingly, are effective decision-making sessions. However, you tend to have open issues after every meeting. These open issues:
The Portfolio Performance Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Performance Management Plan purpose and focus?
Working as a portfolio manager in the Water Resources Department of the U.S. Geological Survey, you are following a scorecard approach to report progress to your executives on the components in your portfolio. You submit the scorecards monthly, and based on their results, your executives decide if a Portfolio Review Board meeting should be held. Your emphasis in these reports is to:
Working to manage portfolio value is a continuous task. In doing so, as the portfolio manager, you review the monthly and any ad hoc reports submitted by component managers. This month you saw there was an excellent opportunity for major cost savings in two components in the top five on the portfolio list; however, to realize this cost reduction, these components require resources to be reallocated from other components in progress for six months. These forecasts then:
You have been newly appointed as a portfolio manager and found out that your predecessor did not develop a Portfolio Risk Management plan as he thought that it is not necessary in the case where he has a risk register. One of your first activities was to develop the missing plan. To do this, you needed to consult with stakeholders in order to fetch risk information in order to identify risks and plan risk management. Which of the following inputs to this process will help you in identifying which stakeholders to analyze?
Your State Governor is fiscally conservative and has limited significantly the financial resources to be provided to each University in the eight Universities in the State's system. Recognizing your University is going to have a 55% reduction in its budget, your Chancellor is re-evaluating all the work that is under way to see how much it can do with fewer resources. Every department will have layoffs at all levels. However, the University does have a portfolio management process in place, which people support. This means for effective portfolio management:
Each time a strategic change occurs, it requires a number of updates, and it includes the need to update the portfolio process assets including:
In a portfolio, data is an abundant asset, and managing the information aiming for a a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. These methods are performed in 4 of the portfolio management processes and serve a slightly different purpose in each and every one of them. When it comes to the optimizing portfolio, what is the purpose of using this analysis?
Assuming a portfolio manager position means one has more stakeholders than in program, project, or operational roles. The goal is to identify all interested stakeholders but often overlooked are:
Your CEO was fired because of a decline in the company's profits by the Board of Directors. They have now hired a new CEO, who plans to re-shape the portfolio and has changed the company's strategic goals and objectives. The new CEO will continue the existing product line of soap products that the company has manufactured for the past 50 years but now will manufacture new products to focus on the baby boomer generation as they retire but desire to maintain a youthful appearance. It also will offer other products to new high school and college graduates who want to appear older. As the portfolio manager you should:
With the increasing use of drywall, your company, which has been in the plaster business for over three generations, is finding it harder to maintain a share of the market and to achieve a positive return on its investments. Three years ago, the corporate executives implemented a portfolio process, and they serve as the Portfolio Governance Council. They meet monthly, and after each meeting, you prepare a report of their decisions. This report is:
As the portfolio manager you have worked to consider the complexities involved of the interdependencies in your programs, projects, and ongoing work. As your portfolio process has been implemented for three years, a key challenge is that senior executives tend to change priorities often even though programs and projects are being implemented. Often these programs and projects are cross-functional, and the result is your process is not coordinated. You recognize there is a need to change, and you met with the Chair of the Portfolio Review Board and have her support for a transparent approach for portfolio standards and prioritization. You should:
Different stakeholders will have different portfolio reporting requirements. Sponsors for example will have a great interest in:
Your probability and impact assessment work is complete, and you are using the results to prepare the portfolio risk management plan. As you do so, it also is useful to:
A new sponsor was appointed by the company in order to push more on the investments underway. The new sponsor wants detailed information on time and money and wants to get things done quickly. Which element of the portfolio management plan will be referred to for managing the sourcing of key resources?
You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You have just finalized managing the strategic change and you are expected to present the following documents:
When managed correctly, the balanced scorecards can change the way an organization does business. Balanced scorecards keep focus on results. As a portfolio manager, you use the balanced scorecards while developing the Portfolio Management Plan in order to
When it comes to managing the portfolio value, one of the junior portfolio managers came to you asking about the relation between cost-benefit analysis and the efficient frontier analysis. What should your answer to her be?
Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. Risk is incorporated in all process groups as well. As a portfolio manager, how do you map the risk management elements to process groups?
As part of the annual planning, PMO has started to group initiatives managed under each portfolio in the organization. The collected list will be used in developing the new Portfolio Strategic Plan. What is this collected list called?
What can you tell about the following portfolio status, having CPI weight = 80% and SPI weight = 20%
Larger image
Your company has a stated policy that all stakeholders are to be treated in an ethical manner. It is one of the largest project management training firms in the world and is a Registered Educational Provider with the Project Management Institute as well as with other associations. It is active in portfolio management to ensure it is offering the most beneficial products and services, both leading edge and traditional, to its customers. Its policy toward its stakeholders is:
Information and direction about the organization's vision, mission, prioritization, and resources should be obtained before the portfolio's strategic plan is developed by reviewing:
As a result of optimization, one of the components was deemed necessary to be terminated. One of the executive managers found about this and called you telling you that you should leave this component as it is of interest to her and she wants to see it finalized and that she will make resources available to it if needed. What should be your best course of action?
The sponsor came to you asking for a high level timeline to depict the approach that you will take to execute this portfolio. What tools and techniques is useful in your case?
You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. The Portfolio Risk Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding its purpose and focus?
Due to multiple issues, there were changes in the reporting process in your portfolio; the meetings with their frequencies have been changed and this will also affect the reporting cycle times. In order to meet this new change you will update which of the following documents?
Assume after the acquisition of the natural gas transmission company by your company, a natural gas distribution company, was approved by the various regulatory agencies. You now are overseeing more components with this acquisition as the portfolio manager. While you had each of the components in your company set up in various categories, this approach had not been followed by the transmission company. You explained to its portfolio manager and staff such an approach enables:
In a portfolio, data is an abundant asset, and managing the information aiming for a a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. These methods are performed in 4 of the portfolio management processes and serve a slightly different purpose in each and every one of them. Considering that you are currently working to ensure resource capacity is optimally allocated against resource requirements or demand based on known organizational priorities and potential value, how can you make use of the quantitative and qualitative analysis?
Portfolios include a lot of work and as a portfolio manager you need to keep an eye on the value realization while maintaining the strategic alignment. You are currently aggregating value delivered by the portfolio components. What outputs do you expect to get out of this?
comes to this type of organizations, which of the following statements is true?