We at Crack4sure are committed to giving students who are preparing for the Pure Storage FlashArray-Implementation-Specialist Exam the most current and reliable questions . To help people study, we've made some of our Pure Certified FlashArray Implementation Specialist (FAIS) Exam exam materials available for free to everyone. You can take the Free FlashArray-Implementation-Specialist Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.
For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity.
How will this affect the installation process?
After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
Where can the NVRAM on a FlashArray//E be located?
Refer to the following output:
Ping successful with CCM
What does this indicate?
A customer's management network connectivity is NOT available at the time of array deployment. Which switch should an Implementation Engineer use to avoid those checks during puresetup flow?
An Implementation Engineer is installing a FlashArray//XR4 and needs to add an extra card to support a second DirectFlash Shelf.
What will be the resulting pair of interfaces?
Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
An Implementation Engineer performs a controller upgrade. What is the command to check I/O health?
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?
An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller.
How should the Implementation Engineer complete the installation?
An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Personality Mode).
What is the next step the Implementation Engineer should take to continue the upgrade?
An Implementation Engineer performs a controller upgrade. What command should the Implementation Engineer run to check I/O health?
An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks. After rebooting the controllers, which user account should the Implementation Engineer use to log in?
What is the speed of the Ethernet ports to connect a FlashArray //E to a DFS?
During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?
A FlashArray arrives with Purity 5.3.8 applied out of the factory. The account team requests that the array be configured with Purity 6.1.21. Which steps should the Implementation Engineer select to meet this requirement?
An evacuation is already in progress when the Account Team informs the Implementation Engineer that the customer wants to include another data pack to the evacuation. How should the Implementation Engineer proceed with this request?
When accessing the FlashArray GUI, which management IP address is recommended for use?
An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?
A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123".
What is the issue with this array name?
When transforming an array from SAS to NVMe with the Evergreen XFORM upgrade, when should a swing shelf be installed?
A customer has scheduled the installation of a FlashArray//X70R4. Core services such as DNS, NTP, and SMTP are currently unavailable due to a network outage, but the Implementation Engineer proceeds with the installation as planned.
What should the Implementation Engineer expect during the installation?
Which enablement feature will cause Mirrored Write statistics to appear in the Analysis section of the FlashArray Purity 6.x GUI?
In a situation where FC cards need to be re-used during a controller upgrade, which is a valid transfer path?
What upgrade scenario required an upgrade of power supplies?
An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit. What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?
A customer has a FlashArray X20R3 with 22/22 data packs in the chassis at 80% space usage and wishes to swap one of the data packs for a 45TB pack. What step needs to be taken to facilitate this consolidation?
After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?
An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?
Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?
An Implementation Engineer is getting ready to install four DFMs into a 16-module efficiency bundle and notices that the new modules are DFMDs while the installed modules are DFMs.
What should the Implementation Engineer do to get the array using a 20-module wide write group?
After completing an HWNDU, what command should an Implementation Engineer run to confirm if any open alerts are transitioning to a 'closing' status?
An Implementation Engineer is performing a FlashArray//X to FlashArray//XL HWNDU. After rebooting a controller, the new controller fails to reach a ready state. Which command should the Implementation Engineer run to resolve the issue?
Which cards are required to connect a DirectFlash Shelf to an FlashArray//XLR5?
Which command should the Implementation Engineer use to easily verify connectivity to Pure1 from a FlashArray?
Support requests a powercycle on a newly-installed FlashArray. What is the correct way to perform this action?
An Implementation Engineer needs to run the puresetup replace procedure on a FlashArray//XR5 during a controller upgrade. What command should the engineer run to identify the array model?
What is the rack unit height of a FlashArray//XL?
Before installing array rails, where should the cage nuts be placed?
During a hardware NDU from FlashArray//XR2 or XR3 to an XR4 model, which default service on-board ports are NO longer present in the XR4 controller design?
An Implementation Engineer is deploying a FlashArray//XLR5 with two DirectFlash Shelves. The engineer wants to ensure the shelves are installed in the preferred PCIe slots to achieve optimal performance and support. Which PCIe slots should the Implementation Engineer use for connecting the DFS shelves?
What is the minimum number of physical Ethernet ports per controller that should be dedicated to the file-services interface to ensure redundancy?
An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU.
At what step should the Implementation Engineer contact support for assistance?
An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis.
What type of controller is required to complete the upgrade?
An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray. Which command should the Implementation Engineer run to verify that the cabling was completed correctly?
On a FlashArray running Purity 6.9.2+, what is the recommended way to initiate a planned controller failover during a FlashArray//XR5 HWNDU?
How can an Implementation Engineer confirm for the customer that data-at-rest encryption is enabled on a newly installed FlashArray?
For FlashArray//XL, which PCIe card slot is reserved for control upgrades?
At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?
An Implementation Engineer is installing a second DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. How should the Implementation Engineer complete the installation?
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?
An Implementation Engineer is scheduled to install a FlashArray and a DirectFlash Shelf (DFS). What action should the Implementation Engineer perform?
On a FlashArray//XR4, which port is enabled for the management service by default?
When performing an install on a FlashArray, what step should be taken first?
After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?
The Customer’s Implementation Workbook specifies that the SMTP reply is “outlook.microsoft.com:587”. What correction should be made for array initialization to be successful?
An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?
What command should the Implementation Engineer run to view NVRAM install and update status?
An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller. Which ports should the Implementation Engineer use for the connection?
During a FlashArray//XR5 upgrade, when should the Implementation Engineer run start_ndu controller-ndu to set the HWNDU specific tunable?
Which PCIe slot must be used for a SAS HBA on R4B revision controllers?
An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit.
What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?