A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support.
What action should the customer take?
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversation Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?
For FlashArray//XL, which PCIe card slot is reserved for control upgrades?
An Implementation Engineer is setting up a customer environment and has specified a number of NTP servers.
Which command should the Implementation Engineer run to list the NTP servers that have been configured?
Upon completion of a hardware upgrade activity, which command should be used to unset the maintenance tag?
Which enablement feature will cause Mirrored Write statistics to appear in the Analysis section of the FlashArray Purity 6.x GUI?
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?
What is the speed of the Ethernet ports to connect a FlashArray //E to a DFS?
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
An Implementation Engineer is beginning a controller upgrade. Which command should be run to stop Purity?