We at Crack4sure are committed to giving students who are preparing for the Pure Storage FlashArray-Implementation-Specialist Exam the most current and reliable questions . To help people study, we've made some of our Pure Certified FlashArray Implementation Specialist (FAIS) Exam exam materials available for free to everyone. You can take the Free FlashArray-Implementation-Specialist Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.
Which PCI cards must be validated on the Bill of Materials (BOM) to allow an Implementation Engineer to attach a DirectFlash Shelf to a FlashArray//XL130R5?
An Implementation Engineer is deploying a FlashArray//XLR5 with two DirectFlash Shelves. The engineer wants to ensure the shelves are installed in the preferred PCIe slots to achieve optimal performance and support. Which PCIe slots should the Implementation Engineer use for connecting the DFS shelves?
Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?
At the completion of an upgrade, which command is used to send phonehome logs?
At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?
An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?
The customer has completed the installation document and has stated that the proxy server address is “10.24.18.120”. What additional information is required?
During a hardware NDU from FlashArray//XR2 or XR3 to an XR4 model, which default service on-board ports are NO longer present in the XR4 controller design?
An Implementation Engineer has installed a data pack and the list command shows the drives in "unadmitted" status. Which command should the Implementation Engineer run to complete the admission?
What slot does a PCIe SAS card need to be installed in a FlashArray//XR2/3?
An Implementation Engineer is onsite to install a new DFM data pack (DP) to CH0.BAY10-CH0.BAY19 of a FlashArray. After adding the drives to the chassis, which command should the Implementation Engineer run to verify if the new DP is in a wide write group?
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversion Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?
What is the the minimum supported capacity requirement for a FlashArray//XL170R5?
An Implementation Engineer is replacing a failing component in a FlashArray//XR4 and must ensure proper service clearance at the front and rear of the array. What is the required service depth clearance for the front and rear panels Of the FlashArray//XR4?
An Implementation Engineer is planning to add a DirectFlash Shelf to a FlashArray//XL with an existing DirectFlash Shelf. Which PCIe slot must be used for shelf connectivity?
What is the redundancy of the FlashArray//XL PSUs?
What is the rack unit height of a FlashArray//XR2/3?
Which PCIe slot supports 4-port FC cards on FlashArray//XL?
Before leaving the site after an install, who is required to provide completion sign-off?
A client needs to upgrade Purity on their FlashArray, but is unable to wait for an available upgrade date from support. What action should the customer take?
An Implementation Engineer completes an installation running 6.x and needs to log back into the array to run final health checks. After rebooting the controllers, which user account should the Implementation Engineer use to log in?
Prior to installing a new FlashArray controller, which terminal display settings must the Implementation Engineer configure?
What are the interface names for a 4-port FC card in slot 1 in an XR2/3 array?
After completing planned maintenance, what command should the Implementation Engineer run to verify connectivity to pure services?
FlashArray//C and //E models use which flash storage architecture, identifiable by gray tabs on the DirectFlash Module carriers?
For FlashArray//XL, which PCIe card slot is reserved for control upgrades?
An Implementation Engineer is upgrading a FlashArray//X50R3 to an //X50R4. The array has 10 SAS and 10 DirectFlash modules in the chassis. What type of controller is required to complete the upgrade?
What are the starter configurations of DFMDs in a Gen 2 DirectFlash Shelf?
Which PCIe slot must be used for a SAS HBA on R4B revision controllers?
A customer needs to have arrays installed and configured with ActiveCluster and ETH replication. The installation document contains 3 IP addresses. How many additional IP addresses are needed?
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?
During a deployment, an Implementation Engineer attempts to name a FlashArray corporate Lab-0L, but the array rejects the name. What is the reason for the failure?
On a FlashArray//XR20R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?
A customer has ordered several FlashArrays and wants to have ActiveCluster configured. What is the maximum quantity of arrays supported with ActiveCluster?
Prior to running the puresetup command, which command should an Installation Engineer run on a new install of a FlashArray//XR4 array?
An Implementation Engineer needs to run the puresetup replace procedure on the FlashArray//X during a controller upgrade. Which command should the Implementation Engineer run on the new controller to determine its model?
Before proceeding with a controller upgrade, phonehome logs must be sent. What command will verify that the logs have been sent?
In a situation where iSCSI cards need to be re-used during a controller upgrade, which is a valid transfer path?
What is the maximum number of DirectFlash Shelves supported for FlashArray//XL?
What is the rack unit height of a FlashArray//XL?
If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?
3 Months Free Update
3 Months Free Update
3 Months Free Update