Question # 6

Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

A.

Holding Cost Percentage

B.

Minimum Lot Size

C.

Target Service Level

D.

Transportation Lead Time Error CV

Full Access
Question # 7

For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?

A.

Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.

B.

Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.

C.

Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.

D.

Merge analytics and alerts into a new planning area from any sample planning area.

Full Access
Question # 8

You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

A.

Add a new time profile level to the time profile.

B.

Change the numbering hierarchy of the period IDs in the time profile.

C.

Change the description of the attributes in the time profile.

D.

Change the past and future horizon of the levels in the time profile.

Full Access
Question # 9

Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.

A.

Increase the use of incremental lot size beyond the frozen horizon.

B.

Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.

C.

Avoid using telescopic time buckets.

D.

Keep the number of fairshare segments small.

E.

Split into multiple planning areas to support weekly vs. daily planning needs.

Full Access
Question # 10

Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

A.

Target key figures for these snapshots must have lag as a root attribute in its base planning level.

B.

The number of lag-based snapshots are limited to nine levels.

C.

Lag-based snapshots are created in the Configuration app for a fixed time range.

D.

Target key figures for these snapshots are exposed to the user in planning views.

Full Access
Question # 11

You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

A.

Using Microsoft Excel planning views

B.

Leveraging the web-based planning capability

C.

Leveraging the functionality of SAP Workzone

D.

Using Driver-Based planning

Full Access
Question # 12

How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.

A.

Simulate heuristics run in Supply Review stage

B.

Simulate statistical forecast at the Demand Review stage

C.

Simulate demand sensing inputs for Supply Review

D.

Model inventory turns based on Target Safety stocks

Full Access