  • Exam Name: SAP Certified Application Associate - Master Data Governance
  • Last Update: Nov 7, 2025
  • Questions and Answers: 80
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_MDG_1909 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_MDG_1909 Practice Exam Questions with Answers SAP Certified Application Associate - Master Data Governance Certification

Question # 6

You want to enhance the data model in SAP Master Data Governance by adding a new custom entity. Which of the following properties can be defined? Note: There are 3 correct answers to this question.

A.

Attributes of the entity

B.

Relationship between entity types

C.

configuration of the entity

D.

Storage and use type of the entity

E.

Change request types of the entity

Full Access
Question # 7

Which of the following cards are available on SAP Master Data Governance process analytics? Note: There are 3 correct answers to this question.

A.

Open Consolidation and Mass Processes

B.

Longest Running Change Requests

C.

Filter for Business Object Type

D.

Business Context Viewer

E.

Change Requests with My Participation

Full Access
Question # 8

You are enhancing a standard data model with a new custom entity and attributes. An additional step is required in the workflow process when the new attribute is populated. What activities would you perform to route the workflow to the additional approval step? Note: There are 2 correct answers to this question.

A.

Create a custom change request status with an additional step and assign it to the workflow.

B.

Create a custom step type and assign this as the next change request step.

C.

Adjust the rule-based workflow using the rule-context preparation BAdl.

D.

Define a new business activity and a new change request type.

Full Access
Question # 9

You want to enable parallel processing of a single material in more than one change request at a time. Additionally, you need to provide a step-specific user interface. What activities would you perform? Note: There are 3 correct answers to this question

A.

Select the Parallel Change Request (PCR) checkbox in Create Change Request Type and choose MATERIAL as main storage and use type 1 entity.

B.

Configure a flex parallel workflow process for MATERIAL entity and implement U DYNAMIC_AGENT_DETERMINATION BAdI to enable parallel processing.

C.

Select the required entities with storage and use type 4 related to the MATERIAL entity to be used in Scope on Entity Type Level.

D.

Use the rule-based workflow and standard workflow in parallel for the same change request L-' type with MATERIAL as the main entity.

E.

Configure properties of the change request step by providing the step-specific user interface ^ application and configuration ID for the change request type step.

Full Access
Question # 10

What are the three main areas that can be configured for the Business Context Viewer? Note: There are 3 correct answers to this question.

A.

Search integration

B.

New change request type

C.

Data providers

D.

User interface

E.

Query management

Full Access
Question # 11

Which technology/tool can you use to load data directly into thestaging area? Choose the correct answer.

A.

It is not possible to load data directly into the staging area

B.

ALE or SAP Data Services using IDocs

C.

Legacy System Migration Workbench (LSMW) using XLSX workbook

D.

Data Import Framework (DIF) using XML file format

Full Access
Question # 12

Which of the following options best describes the basic layout of the Analytical List page in the SAP Master Data Governance data quality management app? Choose the correct answer.

A.

Header and Content Area

B.

Search and Result Column

C.

General and Contact Details

D.

Tables and Focus Area

Full Access
Question # 13

Which options are available when performing data load using SAP Master Data Governance consolidation? Note: There are 2correct answers to this question.

A.

Find duplicates based on matching rules

B.

CSV or XLSX file format to upload source records

C.

External load using business partner SOAP service

D.

Validate against central governance checks

Full Access
Question # 14

You are using a single-object change request to create material for SAP Master Data Governance for Material. When would a temporary ID assigned to a change request be replaced by the material number? Choose the correct answer.

A.

When all the mandatory fields are maintained

B.

When the request is saved/submitted

C.

When the material group is maintained

D.

When the request is activated

Full Access
Question # 15

Which of the following statements are true for editions in SAP Master Data Governance, Financials? Note: There are 2 correct answers to this question.

A.

They ensure consistent financial master data across the entire organization.

B.

They can be used to collect and release changes together at a certain date

C.

They ensure high-quality master data and a single version of the truth.

D.

They are used to control the validity of the master data.

Full Access
Question # 16

What are the use cases and implementation styles of the consolidation process in SAP Master Data Governance? Note: There are 3 correct answers to this question.

A.

Monitor data quality for remediation

B.

Correctness and accuracy for initial load before central governance

C.

Financial control in Central Finance integration (cFIN) projects

D.

Consolidation for mergers and acquisitions

E.

Data consistency for analytical purposes

Full Access
Question # 17

You want to upload and change master data in SAP Master Data Governance mass processing using a CSV or Open Office XML file (XLSX workbook). Which of the following statements are correct? Note: There are 3 correct answers to this question.

A.

Long Text fields such as MARA_STXL are not supported by XLSX workbooks.

B.

The first line in an XLSX worksheet defines the columns.

C.

Each worksheet refers to a table in an XLSX workbook.

D.

Creating or deleting rows in the root table is allowed.

E.

All key fields in an XLSX workbook must be listed in the first worksheet.

Full Access
Question # 18

Which steps are integrated with Business Rules Framework plus(BRFplus) as a part of the

data consolidation process flow?

Note: There are 3 correct answers to this question.

A.

Validate

B.

Standardize

C.

Data Load

D.

Calculate Best Record

E.

Match

Full Access
Question # 19

Which solutions does SAP Master Data Governance offers as standard? Note: There are 2 correct answers to this question.

A.

Consolidation and mass processing

B.

Retail and fashion management

C.

Data quality and process analytics

D.

Enterprise asset management

Full Access
Question # 20

Which of the following attributes are common across business partner, customer and vendor in SAP Master Data Governance for Business Partner? Choose the correct answer.

A.

Dunning data

B.

Company code data

C.

Tax indicators

D.

Tax numbers

Full Access
Question # 21

You want to manage ERP vendors and customers using the standard business partner data model in SAP Master Data Governance (MDG). Which of the following statements are correct? Note: There are 3 correct answers to this question.

A.

SAP MDG uses the business partner data model to manage both vendors and customers.

B.

Multiple ERP vendors and ERP customers can be assigned to one business partner (BP).

C.

Customer vendor integration (CVI) configuration is not required.

D.

SAP MDG has separate data models to manage vendors and customers.

E.

The Vendor/Customer account group can be derived as per the configuration of the BP grouping.

Full Access
Question # 22

Which capabilities does consolidation provide to your customer?Note: There are 2 correct answers to this question.

A.

It provides a pipeline process with the intention to keep data clean.

B.

It provides a pipeline process where data gets standardized and matched with existing master data with the intention to eliminate duplicates.

C.

It provides a workflow-driven pipeline process with approval and audit capabilities via editions and change requests.

D.

lt provides a pipeline process with the intention to get clean data.

Full Access
Question # 23

You want to reduce the impact on system performance after a mass data load by avoiding the non-intentional replication of large amounts of data. Which replication modes are applicable?Note: There are 2 correct answers to this question.

A.

SOA-based replication

B.

Filters and change pointers

C.

Limit changes using time interval

D.

DRFLOG transaction

Full Access
Question # 24

What is the difference between the initial data load of financial master data and material master data into SAP Master Data Governance (MDG) hub? Note: There are 2 correct answers to this question.

A.

ALE and SOA are required formats to load data into SAP MDG for financials.

B.

Data Import Framework and SAP Data Services are required to load both master data.

C.

Data import for SAP MDG for materials is possible usingdifferent formats.

D.

SAP MDG Financials only supports file upload functionality.

Full Access