Winter Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

C_S43_2023 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

C_S43_2023 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management
  • Last Update: Nov 7, 2025
  • Questions and Answers: 80
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_S43_2023 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_S43_2023 Practice Exam Questions with Answers SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management Certification

Question # 6

What do you have to consider when setting up phase-based maintenance?

A.

It is mandatory for breakdown and preventive maintenance.

B.

It is not possible to configure the nine delivered phases.

C.

It can be used with any existing order type.

D.

It comes preconfigured when using the relevant Best Practices scope items.

Full Access
Question # 7

Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

A.

SAP Asset Strategy and Performance Management

B.

SAP Lumira Designer

C.

SAP S/4HANA Core Data Services

D.

SAP Predictive Analysis

Full Access
Question # 8

How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question

A.

By assigning a PFCG role with an SAP Fiori catalog

B.

By assigning a portal role with an SAP Fiori catalog

C.

By assigning a PFCG role with an SAP Fiori tile group

D.

By assigning the tiles directly

Full Access
Question # 9

Which SAP UI technology is used for the Report and Repair Malfunction app?

A.

Web Dynpro

B.

SAP GUI for HTML

C.

SAPUI5

D.

Business Server Pages

Full Access
Question # 10

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

A.

Package hierarchy

B.

Scheduling indicator

C.

Maintenance package offset

D.

Cycle modification factor

Full Access
Question # 11

What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question

A.

Overall costs are dynamically summed up on the header level.

B.

A technical object must be assigned to an order operation

C.

Costs are stored only for the operation object

D.

Purchase requisitions have the operation as account assignment.

E.

The settlement rule is maintained on the header level.

Full Access
Question # 12

How do you map a counter replacement in SAP S/4HANA Asset Management?

A.

Deactivate the current counter and create a new counter.

B.

Create a new measurement document marked as a counter replacement.

C.

Create a new measurement document and assign a valuation code for counter replacement.

D.

Assign a catalogue type for counter replacement to the measuring point category.

Full Access
Question # 13

Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

A.

Technical objects

B.

Work orders and operations

C.

ESRI Maps

D.

Cost analytics

E.

Breakdown analytics

Full Access
Question # 14

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

A.

Schedule and dispatch maintenance operations by shifts.

B.

Dispatch maintenance order operations

C.

Monitor maintenance order operations due in the next 4 weeks

D.

Print job papers from a maintenance order.

Full Access
Question # 15

You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

A.

Assign the header material of a material BOM as assembly to a task list operation.

B.

Assign the BOM usage for free assignment of material in Customizing

C.

Assign the header material of a material ROM to the assembly field of the task list header

D.

Assign a piece of equipment with allocated material BOM to a task list operation.

Full Access
Question # 16

You schedule a Maintenance Service Plan. Which call object is generated?

A.

Maintenance Order which is linked to a Service Order Header

B.

Customer Service Order with assigned DIP profile

C.

Customer Service Order with an external order operation

D.

Maintenance Order which is linked to a Service Order Item

Full Access
Question # 17

Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

A.

An Inspection Plan and a technical object must be assigned to the same class.

B.

A PM task list with inspection point type must be assigned to the maintenance order

C.

An object list must have been generated manually or automatically.

D.

A checklist type must be assigned to the maintenance order header.

Full Access
Question # 18

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

A.

Cancel status Released.

B.

Change the pronty

C.

Book a goods receipt.

D.

Change the estimated costs.

Full Access
Question # 19

A Task List contains two operations:

•Every 3 MON: pump inspection

•Every 24 MON. pump replacement

When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

A.

Assign different hierarchy levels

B.

Set the lead float

C.

Create a task list hierarchy

D.

Create a cycle set sequence

Full Access
Question # 20

To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

A.

Planner group

B.

Maintenance plan

C.

Work center

D.

Business partner

Full Access
Question # 21

You want to display additional document information within the document flow of a maintenance order.

For which type of document must this be customized?

A.

Invoice

B.

Purchase order

C.

Goods movement

D.

Service entry sheet

Full Access
Question # 22

Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

A.

QM inspection plan with assigned inspection characteristics

B.

Inspection point type assigned to the task list header

C.

Master inspection characteristics assigned to PM task list operations

D.

Classification data assigned to a technical object

Full Access
Question # 23

Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

A.

Display approved purchase requisitions for which purchase orders have been generated.

B.

Display approved purchase requisitions for which NO purchase orders have been generated

C.

Analyze overdue maintenance orders that have NOT been finally confirmed

D.

Analyze confirmed maintenance orders that have NOT been settled.

E.

Analyze maintenance orders that are still in planning and have NOT been released.

Full Access
Question # 24

What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

A.

Add a serialized material to the equipment serial data view.

B.

Assign a serial number profile to an additional business view for equipment category

C.

Assign a serial number profile to the equipment category

D.

Assign a serial number profile to the related material master.

E.

Maintain a serial number for an existing equipment master.

Full Access