Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

C_TPLM30_67 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

C_TPLM30_67 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7
  • Last Update: Apr 25, 2024
  • Questions and Answers: 95
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_TPLM30_67 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_TPLM30_67 Practice Exam Questions with Answers SAP Certified Application Associate - SAP Maintenance & Repair with ERP 6.0 EHP7 Certification

Question # 6

Your customer wants to use the dynamic availability check for stock material.

What data must you use to create a scope for the check?

A.

Checking group and material type

B.

Checking rule and material type

C.

Checking rule and material group

D.

Checking group and checking rule

Full Access
Question # 7

In order costing configuration, for what is the allocation structure used?

A.

To provide a method of consolidating costs in the Plant Maintenance Information System

B.

To allocate costs to a hierarchy of maintenance technical objects

C.

To determine the cost elements that are allowed in the plant maintenance order

D.

To determine the settlement receiving elements for costs debited to the order

Full Access
Question # 8

When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.

In addition to setting the reference object view in the order or the notification, what other settings must you make? (Choose two)

A.

Set View Profiles for Technical Objects in Customizing.

B.

Set the Single Installation indicator in the equipment master data record.

C.

Set the Single Installation indicator in the Functional Location master data record.

D.

Set the Equipment-Installation Allowed indicator in the Functional Location master data record.

Full Access
Question # 9

What do you need to select when creating a maintenance plan that only generates notification(s)?

A.

A maintenance plan category for notifications.

B.

A specific notification type for maintenance plans.

C.

A specific maintenance strategy for notifications.

D.

A specific notification type that includes a task list.

Full Access
Question # 10

When is the latest possible point in time that you can create a settlement rule?

A.

Before technical completion

B.

Before order release

C.

After order release

D.

After technical completion

Full Access
Question # 11

What are consequences of activating alternative labeling for functional locations?

A.

You can assign a serial number to a functional location.

B.

You can change the primary functional location label and keep the old label as a historical functional location label.

C.

The company code is automatically included in the functional location label.

D.

You can change the primary functional location label and delete the old functional location label.

Full Access
Question # 12

You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed.

Which system statuses can the order header display before all operations are finally confirmed? (Choose three)

A.

TECO

B.

PCNF

C.

CRTD

D.

CNF

E.

CLSD

Full Access
Question # 13

Your customer wants to utilize estimated costs in Plant Maintenance orders.

Which condition does the customer need to be aware of?

A.

Planned costs overwrite estimated costs after release of the order.

B.

A specific order type in which cost estimates are activated must be used.

C.

Planned costs must not exceed the estimated costs.

D.

Upon release of the order, estimated costs cannot be revised.

Full Access
Question # 14

How many time-based cycles can you use in a multiple-counter maintenance plan?

A.

Three

B.

Zero

C.

Two

D.

One

Full Access