  • Exam Name: SAP Certified Application Associate - SAP S/4HANA Project Systems
  • Last Update: Nov 7, 2025
  • Questions and Answers: 110
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_TS412_2021 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_TS412_2021 Practice Exam Questions with Answers SAP Certified Application Associate - SAP S/4HANA Project Systems Certification

Question # 6

Which orders or documents can be displayed in Project-Oriented Procurement (ProMan)? Note: There are 2 correct answers to this question.

A.

Reservations

B.

Sales order items

C.

Purchase order items

D.

Internal orders

Full Access
Question # 7

You have created an internally-processed network activity, and assigned a work center and the work. After saving, you discover that no planned costs are displayed in the cost element report for the activity. What could be the reason? Note: There are 3 correct answers to this question

A.

The formula for costing in the work center is incorrect

B.

The activity output price for the activity type and cost center assigned to the work center is not maintained.

C.

The duration is missing in the activity

D.

The Determine Costs indicator in the network header rules out planned cost calculation

E.

Integrated planning for the network is active

Full Access
Question # 8

Which statement regarding the creation of a new work breakdown structure (WBS element) are true?

Note : there are 3 correct answer for this question.

A.

You can create several WBS elements per level.

B.

A new work breakdown structure must contain up to 10 levels.

C.

A WBS element of the new project can be assigned to a different project definition.

D.

WBS element can be a planning element, an account assignment element, and a billing element at the same time.

E.

The WBS structure can contain several level 1 WBS element,

Full Access
Question # 9

What PPIDS master data is necessary for using PP/DS? Note: There are 2 correct answers to this question

A.

Location

B.

Material

C.

Production version

D.

Resource

Full Access
Question # 10

The__________________that you specify when you create a project definition is unique for theentire project. Choose the correct answer.

A.

Plant

B.

Controlling area

C.

Company code

D.

Planning department

Full Access
Question # 11

Which of the following factors influence the scheduling of internal processing activities? Note: There are 3 correct answers to this question

A.

An activated Scheduling indicator in the control key of the internal processing activity

B.

Whether the work for the internal activity is greater than its duration

C.

The unit (for example, hour, day) of the field Normal Duration field of the activity

D.

The relationships between activity elements

E.

The factory calendar in the work center used for the internal processing activity

Full Access
Question # 12

Materials

Your customer want to use scheduling for network to specify planned dates of task. In the SAP project system there are different set

of dates that can be scheduled.

Which set of dates can be used for scheduled for network?

Note : there are 2 correct answer for this question.

A.

Planned dates

B.

Fundamental dates

C.

Basic dates

D.

Baseline dates

E.

Forecast dates

Full Access
Question # 13

You are working with networks and WBS elements. Which of the following statements applies

A.

You can reassign an activity from one network to another

B.

You can assign the network header to multiple WBS elements

C.

You have to maintain a network profile in the project profile

D.

You have to activate the operative indicator Account Assignment Element for WBS element with activities.

Full Access
Question # 14

Which of the following is used to plan basic dates manually for WBS elements? Choose the correct answers. There are 2 correct answers to this question.

A.

Schedule Manager

B.

Project Builder

C.

Project planning board

D.

Easy Cost Planning

Full Access
Question # 15

Which objects do you have to maintain to enable automatic assignment of material components to the project? Note: There are 2 correct answers to this question

A.

Material master

B.

Network activity

C.

WBS element

D.

BOM item

Full Access
Question # 16

Which object is relevant in assembly processing to create an assembly order for the SD document?

A.

Project profile

B.

Item category

C.

Requirement class

D.

Control key

Full Access
Question # 17

Cost and budget

A customer works in a multinivel production environment with bill of material and routing. To avoid unnecessary stock cost , they do

not want to produce..

Which setup do you recommend?

A.

Assign a sales order to a project with appropriate hierarchy levels.

B.

Assign a network to a sales order

C.

Assign Several production orders to a sales order

D.

Assign One production order to a sales order

Full Access
Question # 18

Resources

How are capacity requirements determined?

A.

Independent of scheduling and according to the capacity planner group.

B.

Using scheduling and the capacity category.

C.

Using the control key of an activity.

D.

Using scheduling and distribution key.

Full Access
Question # 19

You used reductions to reduce the scheduled duration of all internally-processed activities in your project. However, the duration did not changed after overall network scheduling. What do you check? Note: There are 2 correct answers to this question

A.

If the maximum reduction level is less than 100

B.

If the reduction strategy is set in the network header

C.

If the reduction strategy is set in each activity

D.

If the appropriate reduction type is set in the parameters for network scheduling

Full Access
Question # 20

Which of the following statements are true? Choose the correct answers. There are 2 correct answers to this question.

A.

You can map a project using only one WBS or one network.

B.

You can also represent a project using a WBS and one or more networks.

C.

You can create a project based on a Activity.

D.

You cannot use the characteristics of both the structures (WBS and Networks) together to represent a project.

Full Access
Question # 21

You have saved a network and activates with assigned material components. As soon as you release the network, you receive the error message "Business transaction cannot be carried out" What could be the reason for this error message?

A.

Missing budget for material components

B.

Missing reservations for material components

C.

Missing material availability

D.

Missing authorizations to release material components

Full Access
Question # 22

Resources

Which of the following transactions can you use to post actual cost for external processing.

Note : there are 2 correct answer for this question.

A.

Approval of a service entry sheet

B.

Posting a goods receipt

C.

Creating a service entry sheet

D.

Approval of a good receipt.

E.

Creating a purchase order.

Full Access
Question # 23

To which object can you assign a factory calendar?

A.

Material component

B.

Network header

C.

Relationship

D.

Milestone

Full Access
Question # 24

You are using WBS elements and activities are NOT assigned. Which statements apply to the maintenance of the actual start and finish? Note: There are 2 correct answers to this question

A.

You can only maintain the actual finish if all lower-level WBS elements have an actual finish date and the status of the WBS element is "Released"

B.

You can always maintain the actual start if the WBS element has the status "Released" or "Partially released"

C.

You can always maintain the actual start and finish date of a WBS element

D.

You can only maintain the actual start of a WBS element if the finish date is not maintained

Full Access
Question # 25

You want to allocate overhead rates to a WBS element. What must you assign to the WBS element?

A.

Settlement rule

B.

Investment profile

C.

Results analysis key

D.

Costing sheet

Full Access
Question # 26

You are using networks and external activities in your project The purchase requisition has been created. What is the sequence for the following business transactions and documents?

A.

Vendor selection -> Purchase order handling -> Invoice receipt- Purchase order monitoring -> Goods receipt

B.

. Credit limit check -> Acceptance of performed services -> Vendor selection -> Purchase order handling -> Purchase order monitoring -> Goods receipt -> invoice receipt

C.

Vendor selection -> Purchase order creation -> Service entry sheet creation -> Service entry sheet approval

D.

Vendor selection -> Purchase order handling -> Purchase order monitoring -> Goods receipt

Full Access
Question # 27

A component is assigned to a network activity. What are the prerequisites to generate project stock reservations? Note: There are 3 correct answers to this question

A.

The network activity is assigned to a WBS element

B.

The network is assigned to a sales order item

C.

The material master of the component must permit project stock management

D.

The Project Stock indicator is set in the project definition (non-valuated or valuated)

E.

A procurement indicator must be assigned to the activity

Full Access
Question # 28

Material

Your customer uses Progress Tracking for network components and mantains dates of events manually. They need to implement

scheduling of events.

What is the requisites for implement scheduling of events?

A.

Priority of events must be set.

B.

Scheduling parameters for material scheduling must be set.

C.

Events must be released manually.

D.

Event scenarios must be defined.

Full Access
Question # 29

You used hierarchical revenue planning to plan revenues for WBS elements manually. The cost element report for planned revenues does not show any revenues at all. What is the reason for this?

A.

The manual hierarchical revenue planning will be displayed only if expert mode is activated

B.

The manual hierarchical revenue planning has no reference to cost elements

C.

Cost element reports can display costs but not revenues

D.

Cost element reports display integrated planning only

Full Access
Question # 30

Where can you assign the use status profile for WBS elements? Note: There are 3correct answers to this question

A.

In the project profile

B.

In the project version

C.

In the project type

D.

In the project definition of a standard WBS

E.

In the operative WBS element

Full Access
Question # 31

Which object is used to allocate the costs from a claim to the project structure?

A.

Network activity

B.

Internal order

C.

Claim

D.

WBS element

Full Access
Question # 32

Which of the following statements apply to project versions? Note: There are 2 correct answers to this question

A.

Project versions can be changed

B.

Project versions are mandatory for Milestone Trend Analysis (MTA)

C.

Project versions can be created automatically based on user status

D.

Manually Created project versions always require a project version profile

Full Access
Question # 33

For which objects can billing plans be created? Note: There are 2 correct answers to this question

A.

WBS elements

B.

Project definition

C.

Sales order items

D.

Milestones

Full Access