Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

Note! C_TS413_2020 has been withdrawn. The new exam code is C_TS413_2021

C_TS413_2020 Practice Exam Questions with Answers SAP Certified Application Associate - SAP S/4HANA Asset Management Certification

Question # 6

You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

A.

Define the functional location category.

B.

Define the number range for the functional location category.

C.

Define the reference functional location.

D.

Define the structure indicator.

Full Access
Question # 7

Which valuation category do you use to refurbish a material?

A.

Origin

B.

Retail

C.

Condition-based

D.

In-house/external procurement

Full Access
Question # 8

What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.

A.

Assign a serial number profile to the related material master.

B.

Assign a serial number profile to the equipment category.

C.

Add a serialized material to the equipment serial data view.

D.

Maintain a serial number for an existing equipment master.

E.

Add a serialized material to the construction type field of the equipment master.

Full Access
Question # 9

Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?

A.

Initial/subsequent buffer

B.

Package offset

C.

Call horizon

D.

Package hierarchy

Full Access
Question # 10

Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question.

A.

Work approval

B.

Permits

C.

Documents

D.

Work clearance documents

Full Access
Question # 11

How does a performance-based maintenance plan calculate the interval between start date and planned date?

A.

Cycle length divided by annual performance

B.

Cycle length divided by monthly performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance / 365)

Full Access
Question # 12

Which of the following is a prerequisite for external refurbishment?

A.

Select the material group for externally refurbished materials.

B.

Activate the subcontracting indicator in an external activity.

C.

Define the order type for external refurbishment.

D.

Create the purchasing info record for the external provider.

Full Access
Question # 13

During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.

A.

Storage location

B.

Maintenance work center

C.

Business partner

D.

Maintenance planner group

Full Access