3 Months Free Update
3 Months Free Update
3 Months Free Update
To use an inspection plan without multiple specification , you must assign a material master and plant. What additional data can you assign to an inspection plan?(2 correct Ans)
Your customer wants to automatically valuate the overall results of an audit using the standard
Which valuation method book scores for the overall result?(2 Correct ans )
You have assigned a dynamic modification level to an inspection plan, which dynamic modification criterion is pre-defined and not editable?
When creating an operation step in an inspection plan , which of the following is mandatory?
What must you do in configuration to enable defects recording during an inspection with inspection lots? Note : 2 correct answer
Your costumer wants to determine a critical defect class
Which of the following function are possible during results recoding?
Correct 2 ans