Summer Special Sales Coupon - 55% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4s55disc

C_TS422_2021 PDF

$49.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

C_TS422_2021 PDF + Testing Engine

$79.2

$175.99

3 Months Free Update

  • Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
  • Last Update: Oct 1, 2022
  • Questions and Answers: 82
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_TS422_2021 Engine

$59.4

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_TS422_2021 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Question # 6

You want to create a production order from a planned order. What methods could you use?

A.

Combined conversion

B.

Partial conversion

C.

Collective conversion

D.

Order release

Full Access
Question # 7

You set up a material as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material (BOM)?

A.

Change the special procurement key of the phantom assembly in the BOM.

B.

Change the explosion type of the phantom assembly in the BOM.

C.

Change the phantom item indicator for the phantom assembly in the BOM.

D.

Change the item category of the phantom assembly in the BOM.

Full Access
Question # 8

What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

A.

The work center has several invidula capacities.

B.

The finite Scheduling indicator is NOT set in the strategy profile.

C.

The Change Planning Direction indicator is set in strategy profile.

D.

Alternative work centers are fully occupied.

Full Access
Question # 9

An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

A.

MRP group

B.

Plants parameters

C.

MRP controller

D.

MRP profile

Full Access
Question # 10

The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?

A.

Use the fixed lot procedure.

B.

Use the MRP type for vendor managed inventory.

C.

Use the minimum order quantity

D.

Use the reorder point

Full Access
Question # 11

What are the possible results of a production planning run in Advanced Planning (PP/DS)?

A.

Planned order

B.

Production order

C.

Purchase requistion

D.

Stock transport order

E.

Scheduling agreement schedule line

Full Access
Question # 12

How can you limit the validity of a bill of material (BOM)?

A.

By plant

B.

By material type

C.

By industry

D.

By period