Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

C_TS422_2022 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

C_TS422_2022 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
  • Last Update: May 20, 2024
  • Questions and Answers: 80
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_TS422_2022 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_TS422_2022 Practice Exam Questions with Answers SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Certification

Question # 6

where does the system check master data selection settings during the creation of planned orders and production orders?

Note: There are 3 Correct answers to this question.

A.

in the bill of material (BOM)

B.

in the work centers

C.

in the MRP controller

D.

In the routing

E.

in the production version

Full Access
Question # 7

What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.

A.

Reduced production times

B.

Reduced delivery times

C.

Option to use make-to-order production

D.

Option to forecast planning for production resources

Full Access
Question # 8

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

A.

Fill up to the maximum stock level.

B.

Fill up to the safety stock level.

C.

Fill up based on the lot size procedure.

D.

Fill up to the reorder stock level.

Full Access
Question # 9

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

A.

The same batch management level is used

B.

The same base unit of measure is used.

C.

The quantity and value updates are the same

D.

The same account category is used

Full Access
Question # 10

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

A.

By Plant

B.

By Period

C.

By Industry

D.

By Material Status

Full Access
Question # 11

Which of the following processes lead to an entry in the MRP planning file?

Note: There are 3 correct answers to this question.

A.

Changing the storage bin in warehouse management

B.

Changing the procurement type in the product master

C.

Changing the operation times in the production data structure

D.

Changing the stock in inventory management

E.

Changing the purchasing contract in materials management

Full Access
Question # 12

What data can you maintain in the subitems of a bill of material (BOM)?

Note: There are 2 correct answers to this question.

A.

Installation point

B.

Item type

C.

Quantity

D.

Scrap percentage

Full Access
Question # 13

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

A.

Scheduling agreement schedule line

B.

Purchase Order

C.

Planned Order

D.

Production Order

Full Access
Question # 14

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

A.

Routing

B.

Work Center

C.

Bill of material (BOM)

D.

Material Master

Full Access
Question # 15

How can you characterize dependent requirements in material requirements planning?

Note: There are 2 correct answers to this question.

A.

They are created with exact times in Advanced Planning.

B.

They are created when an independent requirement is created for the finished product.

C.

They are created on assembly level during the planning run.

D.

They are only created for multilevel bill of material (BOM) structures

Full Access
Question # 16

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

A.

Kanban

B.

Material requirements planning

C.

Backflushing

D.

Production order release

Full Access
Question # 17

Your project team decided to use a make-to-order planning strategy material in discrete manufacturing.

what is the impact of this decision?

Note: there are 2 correct answers to this question

A.

Storage Location MRP areas are required for sales-orders-specific stock.

B.

Net requirement calculation is carried out for every sales order individually.

C.

Both the reduction of make-to-order stock and requirements occur on delivery

D.

Sales orders have to be ATP-confirmed (available-to-promise) to saved.

E.

Production orders are created with sales order reference.

Full Access
Question # 18

What is the work center hierarchy in capacity planning?

A.

A group of work center in a parallel sequence that is used to split production quantities and work on them in parallel

B.

A group of alternative work centers providing a cumulative available capacity for production

C.

A group of work centers in a production line being used in sequence for production

D.

A group of alternative work centers for production, structured in hierarchy levels by priorities

Full Access
Question # 19

What could be the reason for different combinations of components in a multiple bill of

material (BOM)?

Note: There are 2 correct answers to this question.

A.

BOM header status

B.

Manufacturing date

C.

Lot size

D.

BOM item status

Full Access
Question # 20

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

A.

Order type

B.

Planning strategy

C.

Requirements profile

D.

Requirements type

Full Access
Question # 21

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

A.

Create an object selection variant for priority-category-related alerts.

B.

Assign the alert profile to the overall profile.

C.

Create an object selection variant for production-planning-related alerts.

D.

Assign the overall profile to the authorization profile.

Full Access
Question # 22

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

A.

Specify a negative planning horizon.

B.

Specify a positive planning horizon.

C.

Specify a positive offset time.

D.

Specify a negative offset time.

Full Access
Question # 23

Which time elements can be reduced by a reduction strategy?

Note: There are 3 correct answers to this question.

A.

Goods receipt processing time

B.

Move time

C.

Wait time

D.

Float after production

E.

Queue time

Full Access
Question # 24

You Have a scheduling agreement with a vendor, you want classic MRP to automatically create

schedule lines in case of material shortage, what must you do?

Note: there are 2 correct answers to this question.

A.

Add the agreement to the source list and mark it for MRP relevance.

B.

Set the creation indicator for purchase requisition on the initial screen of the MRP run.

C.

Add the agreement to the quota arrangement and mark it for MRP relevance.

D.

Set the creation indicator for delivery schedule lines on the initial screen the MRP run.

Full Access