C_TSCM42_67 Practice Exam Questions with Answers SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Certification

Question # 6

Which of the following elements can be used in a process order? (Choose three)

A.

Process instructions

B.

Parallel sequences

C.

Relationships

D.

Suboperations

E.

Phases

Full Access
Question # 7

Which of the following statements about the SAP Solution Manager listed is correct?

A.

Solution Manager is part of the SAP ECC System.

B.

Solution Manager is an add-on industry solution.

C.

Solution Manager is a stand-alone system that communicates with other systems in a system landscape.

D.

Solution Manager is a satellite system in a system landscape.

Full Access
Question # 8

Which of the following functions does SAP Supply Chain Management (SCM) offer?

A.

Product development, safety, quality, and maintenance

B.

Planning of supply chains across company boundaries

C.

Communication with customers through different interaction channels

D.

Optimization of the procurement strategy with the supplier pool

Full Access
Question # 9

Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.

Which BOM item category must you set to fulfill this requirement?

A.

D (document item)

B.

E (external procurement)

C.

M (phantom material)

D.

N (non-stock item)

Full Access
Question # 10

What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

A.

A planning scenario must be released before it can be used in LTP.

B.

Reorder point planned materials can be included in LTP.

C.

LTP focuses on the operational planning of important components.

D.

LTP creates purchase requisitions for external procurement.

Full Access
Question # 11

From what point can you no longer use the Read PP master data in the production order?

A.

After printing the order papers.

B.

After the first posting of goods movements or confirmation.

C.

From the release of the production order.

D.

After assigning the confirmed quantity of a material component due to carrying out a material availability check.

Full Access
Question # 12

Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

A.

Standard values (routing)

B.

In-house production time (material master)

C.

Transport time (routing)

D.

Formulas (work center)

E.

Operation control key (routing)

Full Access
Question # 13

What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

A.

ATP checks can be carried out automatically when releasing a production order.

B.

ATP checks are automatically performed during Material Requirements Planning (MRP) runs.

C.

ATP checks are used to evaluate the free capacity on a certain work center.

D.

ATP checks are mandatory for lead-time scheduling.

E.

ATP checks can be adjusted to also consider future requirements and receipts.

Full Access
Question # 14

A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.

What do you have to consider for the two lists at this stage? (Choose two)

A.

The stock/requirements list was updated the moment it was accessed.

B.

The MRP list displays the production order.

C.

The MRP list has the status "processed".

D.

The stock/requirements list displays the production order.

Full Access
Question # 15

What can you use to organize material staging for production orders? (Choose three)

A.

Material documents

B.

Transfer orders

C.

KANBAN

D.

Pull list

E.

Logistics Information System (LIS)

Full Access