Which of the following elements can be used in a process order? (Choose three)
Which of the following statements about the SAP Solution Manager listed is correct?
Which of the following functions does SAP Supply Chain Management (SCM) offer?
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
From what point can you no longer use the Read PP master data in the production order?
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)
What can you use to organize material staging for production orders? (Choose three)