March Sale Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

Note! E_S4HCON2022 has been withdrawn. The new exam code is E_S4HCON2023

E_S4HCON2022 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question # 6

In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?

There are 2 correct answers to this question.

A.

During downtime

B.

During SPDD

C.

Post-downtime

D.

During uptime

Full Access
Question # 7

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

A.

When performing an SAP S/4HANA conversion with DMO

B.

When performing an SAP S/4HANA conversion without u DMO

C.

When upgrading an SAP S/4HANA Server system

D.

When upgrading an SAP ECC system with DMO

Full Access
Question # 8

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

A.

750

B.

700

C.

731

D.

740

Full Access
Question # 9

You are running an SAP ECC system.

For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?

Note There are 3 correct answers to this question

A.

Upgrade the SAP system

B.

Perform an SAP S/4 HANA conversion without DMO

C.

Perform an SAP S/4 HANA conversion including DMO

D.

Apply SAP support packages

E.

Use DMO for SUM

Full Access
Question # 10

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

A.

PARMVNT_UPG

B.

TABIMJJPG

C.

PARDIST_SHD

D.

TABIM_SHADOW_*

Full Access