  • Exam Name: LEED AP Operations + Maintenance (LEED AP O+M)
  • Last Update: May 8, 2024
  • Questions and Answers: 166
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

LEED-AP-O+M Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

LEED-AP-O+M Practice Exam Questions with Answers LEED AP Operations + Maintenance (LEED AP O+M) Certification

Question # 6

Which of the following topics needs to be addressed by retail project teams when administering the supply chain survey in order to meet the requirements of Materials and Resources, Ongoing Purchasing and Waste Policy, Option 1?

A.

Resources for additional information

B.

Materials recovery during manufacturing

C.

Waste reduction and waste management measures

D.

Environmental best practices for supply chain decisions

Full Access
Question # 7

What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?

A.

Inspect irrigation systems for leaks once per year

B.

Perform irrigation management tasks manually on a daily basis

C.

Use automated leak detection systems, such as those that use pressure sensors

D.

Correct any deficiencies that are discovered in the irrigation system prior to the performance period

Full Access
Question # 8

Which of the following strategies improves cooling tower water efficiency?

A.

Increase cooling tower fan speed

B.

Increase the cooling tower blowdown

C.

Install and maintain a conductivity meter

D.

Lower set point of water leaving cooling tower

Full Access
Question # 9

Which of the following LEED AP Operations and Maintenance Water Efficiency Credits has exemplary performance?

A.

Water Efficiency Credit, Water Metering

B.

Water Efficiency Credit, Cooling Tower Water Use

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

Water Efficiency Credit, Outdoor Water Use Reduction

Full Access
Question # 10

What requirement must be met when creating a demand response program that satisfies Energy and

Atmosphere Credit, Demand Response?

A.

Demonstrate a load shift reduction of 5% in the building

B.

Permanently reduce the energy consumption in the building by 5%

C.

Have the building management sign a two-year demand response enrollment

D.

Create a comprehensive plan for meeting the contractual commitment during a demand response event

Full Access
Question # 11

Which of the following strategies is most important for achieving economic and environmental performance in a LEED project?

A.

Retain a LEED AP

B.

Perform a full life-cycle assessment

C.

Bring the project team together in the performance phase

D.

Take an integrative approach

Full Access
Question # 12

What is the required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program?

A.

Annually

B.

Twice a year

C.

At least once every five years

D.

At least once every three years

Full Access
Question # 13

Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

A.

A product labeled Sustainable Sourced

B.

An organic product produced within a 500 mi. (805 km) radius

C.

A United States Department of Agriculture (USDA) organic food product

D.

A Protected Harvest certified product purchased outside the performance period

Full Access
Question # 14

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?

A.

6 ft. (1.8 m)

B.

8 ft. (2.4 m)

C.

10 ft. (3 m)

D.

12 ft. (3.5 m)

Full Access
Question # 15

Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the

A.

Basis of Design

B.

Design Narrative

C.

Owner Project Requirements

D.

Current Facility Requirements

Full Access
Question # 16

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a non-potable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which non-potable water source would be the most appropriate for use?

A.

Municipally supplied tap water

B.

Ground source stormwater runoff

C.

Air conditioner condensate

D.

Graywater from the building's hand-washing sinks

Full Access
Question # 17

A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Existing Building Commissioning – Implementation

Full Access
Question # 18

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite Indoor Water Use Reduction?

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen pot filling faucets

Full Access
Question # 19

Which of the following is required when documenting a LEED Pilot Credit?

A.

Compliance letter

B.

LEED AP approval

C.

Innovation narrative

D.

Pilot Credit registration

Full Access
Question # 20

A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?

A.

Heat exchangers

B.

Central plant chillers

C.

Primary chilled water pump

D.

Central plant cooling tower

Full Access
Question # 21

Which of the following transportation modes can be included as an alternative commuting methodin the calculation for Location and Transportation Credit, Alternative Transportation?

A.

Trips avoided while on vacation

B.

Trips avoided while on business travel

C.

Trips avoided because of telecommuting

D.

Trips avoided by commuting on a motorcycle

Full Access
Question # 22

What credit or prerequisite requires a plan for a hazardous spill cleanup?

A.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

B.

Materials and Resources Credit, Solid Waste Management - Ongoing

C.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies

D.

Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program

Full Access
Question # 23

How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water

Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?

A.

Six months

B.

12 months

C.

18 months

D.

This type of fixture should not be metered

Full Access
Question # 24

Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

A.

Air temperature and humidity

B.

Air speed and radiant temperature

C.

Air temperature and energy consumption

D.

Radiant temperature and energy consumption

Full Access
Question # 25

Which of the following is a low impact development (LID) technique for rainwater management?

A.

Storm inlet

B.

Rain garden

C.

Detention basin

D.

Impervious pavement

Full Access
Question # 26

Cooling tower blowdown is necessary because

A.

too much water in the system is inefficient so its water levels must be lowered

B.

a buildup of dissolved solids increases conductivity which decreases efficiency

C.

excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels

D.

cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening

Full Access
Question # 27

Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?

A.

Use of motorcycles

B.

Use of hybrid vehicles

C.

Compressed workweeks

D.

Use of Liquified Petroleum Gas (LPG) vehicles

Full Access
Question # 28

A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?

A.

Sensor calibration

B.

Test and balance procedures

C.

Cooling tower water management

D.

Operating schedules and requirements

Full Access
Question # 29

Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?

A.

Soil Testing

B.

Irrigation monitoring

C.

Fertilizer application

D.

Records of deicer use (if applicable)

Full Access
Question # 30

If a manufacturer does not specify the calibration interval for the utility meters used for benchmarking building energy performance, the assessment team may specify a reasonable calibration interval not to exceed

A.

one year

B.

two years

C.

three years

D.

five years

Full Access
Question # 31

Which of the following is the most appropriate use of untreated stormwater?

A.

Irrigation

B.

Boiler water makeup

C.

Drinking fountain

D.

Cooling water makeup

Full Access
Question # 32

According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

LEED-AP-O+M question answer

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Full Access
Question # 33

The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?

A.

Install a new high-efficiency chiller

B.

Purchase renewable energy credits

C.

Install new high efficiency urinal flush valves

D.

Provide financial support for off-site conservation

Full Access
Question # 34

Instituting a policy to prevent erosion and sedimentation and restore any eroding soils is a requirement of which credit or prerequisite?

A.

Water Efficiency Prerequiste, Outdoor Water Use Reduction

B.

Sustainable Sites Credit, Rainwater Management

C.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

D.

Sustainable Sites Credit, Site Management

Full Access
Question # 35

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system

Full Access
Question # 36

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

A.

Implement an alternative transportation program and conduct a transportation survey

B.

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.

Implement an alternative transportation program and estimate the alternative transportation rate

Full Access
Question # 37

Discussing the project goals to help identify the credits and options that the team should attempt is an example of

A.

documenting LEED credits

B.

creating the Basis of Design (BOD)

C.

developing the LEED Scorecard

D.

implementing the Commissioning (Cx) Plan

Full Access
Question # 38

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

Full Access
Question # 39

A project team has ended all their performance periods between August 1st and August 31st. When is the latest date that the project team can submit for preliminary review?

A.

September 30th

B.

October 30th

C.

November 30th

D.

December 30th

Full Access
Question # 40

To fulfill the Indoor Environmental Quality Prerequisite, Green Cleaning Policy, cleaning chemicals must be handled in a manner that

A.

meets ASHRAE standards

B.

reduces transportation expenses

C.

is in accordance with ASTM-779-03

D.

limits opportunities for accidental spills and leaks

Full Access
Question # 41

A building is certified in LEED EB v2.0. Upon recertification, which LEED Operations and Maintenance version should be used?

A.

LEED EB v2.0

B.

Whichever version the team designates

C.

The version that is current at the time of registration for recertification

D.

The version subsequent to the version under which the project initially certified

Full Access
Question # 42

A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?

A.

Both alternative water sources may only be applied towards the credits for both Indoor Water Use Reduction and Outdoor Water Use Reduction

B.

Both alternative water sources may only be applied towards the prerequisites for both Indoor Water Use Reduction and Outdoor Water Use Reduction

C.

The on-site captured rainwater may only be applied to Water Efficiency Prerequisite, Indoor Water Use Reduction while the municipally treated wastewater may only be applied to Water Efficiency Prerequisite, Outdoor Water Use Reduction

D.

The on-site captured rainwater system may only be applied to Water Efficiency Credit, Indoor Water Use Reduction, while the municipally treated wastewater may only be applied to Water Efficiency Credit, Outdoor Water Use Reduction

Full Access
Question # 43

Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

A.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 120% of the water use

B.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 120% of the water use

C.

For a building with a certificate of occupancy dated 1993 or later, the baseline water usage is 150% of the water use

D.

For a building with a certificate of occupancy dated 1995 or later, the baseline water usage is 150% of the water use

Full Access
Question # 44

How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR® rating tool?

A.

Local energy supplier estimates or calibrated energy simulation

B.

Historical energy consumption data or calibrated energy simulation

C.

Historical energy consumption data or national average source energy data

D.

Short-term system measurements using data loggers or national average source energy data

Full Access
Question # 45

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement

Full Access
Question # 46

A standard reference when creating an indoor air quality management program is

A.

Home Energy Rating System (HERS)

B.

American Society of Heating, Refrigerating and Air - Conditioning Engineers 90.1 - 2010 (ASHRAE)

C.

Chartered Institution of Building Services Engineers (CIBSE)

D.

Indoor Air Quality Building Education and Assessment Model (I-BEAM)

Full Access
Question # 47

Which of the following options about project boundaries is correct?

A.

The LEED project boundary may not include other buildings

B.

A LEED campus boundary for the master site is not necessary to pursue with LEED campus certification

C.

The gross floor area of the LEED project should be no less than 2% of the gross land area within the LEED project boundary

D.

Sites with a master plan for multiple buildings and/or phased development must not designate a LEED project boundary for each individual project

Full Access
Question # 48

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Full Access
Question # 49

When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

A.

Distribute the total number of surveys across all tenants evenly

B.

Distribute the total number of surveys across all tenants proportionately, according to their populations

C.

Distribute the total number of surveys across all tenants proportionately, according to their gross floor area

D.

Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Full Access