3 Months Free Update
3 Months Free Update
3 Months Free Update
When developing a process, you were provided with two data tables, "DT1" and "DT2", as shown below:
The process documentation specifies that the two data tables need to be manipulated in order to reflect the following "DT2":
How should the properties of the Merge Data Table activity be configured?
A)
B)
C)
D)
A developer aims to employ the REFramework for automating a business process that involves a TransactionData collection and addresses.
What is the appropriate variable type for the TransactionItem?
How can a process be converted from a toreground process to a background process?
Given the following list of arguments:
and the following code:
What is the value that will be displayed in the Output Panel at the end of the sequence below:
In order for a developer to utilize the default REFramework without relying on Orchestrator queues, what is the essential prerequisite to ensure that the project does not interact with Orchestrator?
You have to create a testcase for an attended RPA process. At some point, the attended process asks the user to input a specific token for the execution to continue, as shown in the screenshot below.
What testing concept (included in UiPath.Testing.Activities) can be used to isolate and replace the input part, without modifying the original workflow?
A developer implemented a process using the Robotic Enterprise Framework and an Orchestrator queue. The MaxRetryNumber from the "Config.xlsx" file is set to "1" and the Max # of retries from the Queue settings from Orchestrator is set to "2". At runtime, the first transaction item throws a Business Exception.
How many times will the transaction be retried?
Which of the following statements accurately describes the primary components of a State Machine in a workflow?
What advantages do pre-built connectors in UiPath Integration Service offer?
A sales department is using UiPath attended automation to handle incoming sales requests through multiple forms and applications. They want to ensure the automation runs in parallel with other tasks.
What feature of trigger-based attended automation will best support this?
A developer is building an automation which types text into a text file. The Activity Project Settings tor UI Automation Modern activities are set as follows:
The developer has configured the properties of a Type Into activity as follows:
What is the behavior of the Type Into activity when executing the workflow?
Given the following conditional breakpoint with count = 0
Conditional breakpoint settings:
How many limes will UiPath be displayed in the Output panel before the process goes into a Paused state in Debug mode?
A developer aims to employ the REFramework for automating a business process that Involves a TransactionData collection (DataTable) comprising vendor names and addresses.
Instructions: Choose the appropriate variable type for the Transactionltem from the provided drop-down list in the following exhibit.
In a UiPath project that uses State Machines, under what circumstances should the Final State activity be used in the project?
What are the two types of elements that can Be included in an Object Repository?
In which of the following places can you access a recording of a failed queue transaction in UiPath Orchestrator?
In which scenarios can the Add Attachment option in UiPath.WebAPI.Activities.HttpClient be enabled?
In the context of a process automated using the REFramework that processes payments and sends a report using the Finance team leader's email account at the end of the day. where should the email account credentials be stored according to best practices''
What is the purpose of the Interval filter in the Orchestrator's Monitoring page?
Once "Library A" has been imported as a dependency in the current project, how can the UI Object Repository defined in "Library A" be accessed?
Given the following workflow:
What will be the output of the Log Message activity?
In the context of the REFramework, if the OrchestratorQueueName key is present in both the Settings and Assets sheets, but an asset with the corresponding name is not present in Orchestrator, what will be the behavior at run time?
When working with a long-running workflow involving form actions in Action Center, how is the job resumed after it has been suspended?
In a UiPath development scenario, which type of process design would be the most appropriate for an automation task that executes actions in a straightforward progression without iteration or branching?
In a UiPath State Machine workflow, which section of State activity is used to specify conditional/triggers logic and multiple outgoing transitions in a state machine?
Which of the following is an outcome of converting a personal workspace into a folder in UiPath Orchestrator?
Starting with UiPath Studio version 2022.10, what happens to dependencies that lack Windows compatibility when they are converted in a project?
A developer plans to build an automation process using the REFramework with Orchestrator queues. Based on UiPath best practice, what is the recommended sequence of steps to update
the template and create/update Queues and Values?
Instructions: Drag the Description found on the left and drop on the correct Step Sequence found on the right.
How does UiPath handle different dependency versions for multiple running processes that run at the same time?
What are the steps to publish a project from UiPath Studio?
Instructions: Drag the Description found on the "Left" and drop on the correct Step Sequence found on the "Right".
Suppose you have the following workflow that verifies if the text value of an element is equal to "Work Items":
The configuration for the Verify Control Attribute and Get Text activities is shown below:
The element and its selector are highlighted in the image below:
Taking into consideration that the page shown above will be present on screen at execution time, what will be the result of the Verify Control Attribute activity?
What actions must be manually selected in the App/Web Recorder before recording a step?
A developer configured the properties for a Click activity on an element inside a web page as shown in the following exhibit.
An animation on the web page never completely loads but the element indicated in the Click activity does load within the specified timeout duration. What occurs when this Click activity executes?
A developer is building an automation that must interact with a destination remote computer reached by jumping through multiple RDP connections, as described by the following scenario:
- The Robot is installed on Machine A, which connects through RDP to Machine B.
- From Machine B another RDP connection is opened to Machine C, where the automation must be performed.
Which of the following scenarios is appropriate for the developer who wants to use UI Automation activities?
When should a developer log a coherent message with the Logging Level set as "Info" while building an automation project?
A developer is building a process that needs to click an element which requires a mouse hover to become visible. However, the element does not appear with the default click setting. The input method for the Click activity is Send Window Message.
Which property should the developer configure to be able to click the element?
On 10/04/2023 five Queue Items were added to a queue. What is the appropriate processing sequence for Queue Items based on their properties?
Instructions: Drag the Queue Item found on the "Left" and drop on the correct Process Sequence found on the "Right".
You are tasked with automating a process that requires secure, persisted, and accessible data storage across multiple systems. What is the most suitable benefit of UiPath Data Service for this scenario?
What Information is provided in the Descriptor Coverage sub-panel of Test Explorer?
How should the computation of the signature be done for client apps that receive Orchestrator requests and need to check their authenticity?
Instructions: Drag the Description found on the left and drop on the correct Step Sequence found on the right.
What is the use of job priorities in unattended automations within UiPath Orchestrator?
In UiPath Studio, how can a specific amount of time be subtracted from the current date using DateTime and TimeSpan variables in the VB.NET?
Which one of the following expressions Is the equivalent of the If activity from the picture?
Review the following graphics:
If the automation is executed and Notepad.exe is not running, which Log Message text value is contained in the Output panel?