3 Months Free Update
3 Months Free Update
3 Months Free Update
Consider a process a that has a dependency Library B. Library B has defined an Object Repository for the application C where UI objects are stored.
Assuming a developer wants to use a UI Object defined in the Object Repository for application C insider process A, what is the best solution for that?
What is a key difference between Attended and Unattended Automations in UiPath?
Consider a process that is scheduled to run 3 times a day (9AM, 1PM, 6PM). For each run, the process needs to consume data from a different queue.
What is the best way to implement this functionality?
How can UiPath Communications Mining and Document Understanding be combined to optimize data extraction and analysis in an automated business process?
What can be stated as factual when it comes to deploying and executing in Service Mode?
What is the scope of the Decision Pipeline step within the Automation Pipeline (in UiPath Automation Hub)?
What is a layer that is redundant for a Solution Architect to take into account when designing the Reusable Components for a project?
What is a primary purpose of Uipath Data Service in Robotic Process Automation (RPA)?
What are the benefits of having the UiPath Document Understanding Process templates as part of an End-to-end Business Process (Upstream Automation > DU Process > Downstream Automation), and enabling the one-job-Per-File approach?
What is the difference between rule-based and model-based data extraction methodologies?
In the context of an Orchestration Process, what is the maximum number (or other job triggers) that a job can wait for at a time?
In which model is the Admin Portal and Analyzer used with UiPath unassisted Task Mining delivered, and where is it built and hosted?
When statement below accurately identifies the correct option regarding the various types of deployment?
Given the blowing diagram how on the process be optimized from the steps perspective?
What is the recommended UiPath Studio template to be used for long-running workflows?
What are the two main categories that a development Specification Document (DSD) should focus on?
In the license estimation process, what might indicate the need for additional licenses during the process design stage?
Which of the options below represent tasks that are well-suited for automation?
Which of the following is an important principle to follow when designing an RPA solution?
Given the High-Level Diagram, what is the best improvement that the Solution Architect should make at the process level?
A Solutions Architect is cresting the Solution Design diagram for a transactional process.
The transactions represent invoice Numbers that should be processed sequent it two applications and they are received and formatted as a table in a CSV file.
A transaction Should only be processed once in each application E.g It a System Exception occurs after invoice ABC was processed m Application 1 when retrying the transaction invoice ABC should only be processed in Application 2
The following metrics are known:
-Average Transaction Handling Time = 30 seconds
-Average Volume per day = 3500 transactions
Which of the following approaches is the most suitable for the process described above?
A)
B)
C)
D)
What is the correct flow from a high level design standpoint in UiPath Test Manager1?
Instructions: Drag me Description found on the left and drop on Via correct Step Sequence found on the right.
A Solution Architect created the following estimation for a low-complexity process:
1 Sub-Process3 ComponentsEstimation (days)Q Notes
DispatcherConfig file configuration0.25
System 1
Login/Logout0.25
Navigate to CO report0.125
Extract Data0.25
Orchestrator
Configure assets/queue0.125
Upload queue items0.125
PerformerConfig file configuration0.125
System 1
Login/Logout0.25
Navigate to CO report0.125
Search Person by ID0.125
Person Details - Extract data0.125
Current Performance Details + Extract data0.5
Check Level Info0.1
System2
Create Confirmation file0.1
ReadMNOPfile0.1
System?
Create Confirmation file0.1
Read MNOPfile0.1
Convert MNOPfile data into structured Data0.5
Compare data betweeen files0.5
System 1
Navigate to CO report0.125
Search Person by ID0.125
Update Date & Save0.125
Navigate back to search0.125
Dispatcher/Performer Integration, functional testing2
Dispatcher/Performer General best practices2
Total EstimationAll + Contingency (30%)11.0
Based on the Best Practices a Solution Architect should follow when creating an estimation and having the Solution Design in mind, what is one significant mistake that the Solution Architect made?