3 Months Free Update
3 Months Free Update
3 Months Free Update
During recent SQL server maintenance, an issue was reported where some users were unable to access some of their assigned applications within the VDI environment. All users report being able to still connect to their instant clone desktops.
Which condition might account for the outage?
A company has asked an architect for assistance in reviewing its design plans for distributing a finance application to its users with multiple RDS hosts using a custom load balancing script.
What can the architect recommend for a script with proper load return values to prevent overloading of an RDS host?
A customer with Horizon has decided to implement Workspace One for mobile management and Single-Sign On access to Horizon entitlements. The customer plans to use cloud services when possible. A decision is made to use cloud-hosted Workspace One.
Which component must be deployed on-premises to support the scenario?
A customer has chosen vRealize Operations Manager for Horizon as its monitoring solution.
The customer’s requirements are:
Recent project updates include:
Which two additional components are required to make the monitoring systems ready? (Choose two.)
Which ports on a firewall need to be opened to allow client PCoIP traffic to flow from user’s endpoints to a Unified Access Gateway appliance?
A company had a security breach which resulted in stolen data. The CIO has mandated that the security team implement a data leak prevention mechanism and better control over how data is accessed and distributed.
Which technology will prevent users from copying data from their Horizon View virtual desktop to their local endpoint when they are connected outside the corporate LAN?
A customer has an aging storage array that must be replaced. The array is used by VMware hosts in their data center. The storage array is under warranty, but the hosts are all out of warranty. The customer wants new hardware running Horizon 7, and is open to a hyperconverged solution. The project must take place with minimal-to-no disruption during normal business hours. The CIO states there is a maximum budget of $600, 000 for the project. The IT Director says their UPS units were replaced last year and they don’t need to be updated. The existing racks are heavily populated, with limited rack units remaining and no additional datacenter floorspace for another rack.
Match the statements taken from the scenario with its correct design category.