Labour Day Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

WELL-AP PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

WELL-AP PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: WELL Accredited Professional (WELL AP) Exam
  • Last Update: May 8, 2024
  • Questions and Answers: 204
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

WELL-AP Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

WELL-AP Practice Exam Questions with Answers WELL Accredited Professional (WELL AP) Exam Certification

Question # 6

A client of a commercial building reports odors and high-humidity levels in a regularly occupied space next to the occupant's kitchen. Which of the following doors should the WELL AP recommend installing between these regularly occupied spaces?

A.

Double doors

B.

Sliding doors

C.

Solid core doors

D.

Self-closing doors

Full Access
Question # 7

The Project must provide which of the following pieces of information at registration?

A.

Project size

B.

List or design consultants

C.

Level of WELL Certification

D.

Target date for performance verification

Full Access
Question # 8

A client seeking WELL Certification would like to reduce work-induced fatigue. Which strategy should a WELL AP recommend to achieve this goal?

A.

Onsite massage therapy provided to employees at least two times per month

B.

Dedicated space for restoration and relaxation with an accompanying policy permitting breaks during work hours

C.

Mindfulness-based programming that requires employees to participate in-person or virtually for a minimum of two sessions per three-month period

D.

Provision for overtime pay for workdays exceeding eight hours and additional vacation time provided for overtime days occurring more than three times per pay period

Full Access
Question # 9

Which Nourishment strategy must be considered in a cafeteria of o project pursuing WELL Certification?

A.

Display the sodium content contained in each standard menu item per package

B.

Provide only ono typo of beverage that contains more than 0.88 oz (25 g) o> sugar per serving

C.

Offer annual food allergy training to service staff, including managers servers and kitchen staff

D.

Schedule one staff member to handle questions and special requests regarding food allergies once per week.

Full Access
Question # 10

Along with turbidity, which parameter requires a performance test in bathroom faucets?

A.

Mercury

B.

Benzene

C.

Coliforms

D.

Trihalomethane

Full Access
Question # 11

The WELL AP notices mold and fungal growth on some indoor walls and ceilings of enclosed regularly occupied spaces. Which of the following is the most likely cause of the mold and fungal growth?

A.

Ducts were not properly sealed and protected during the construction stage

B.

Commissioning Agent did not confirm that the ventilation rate exceeds 21 cfm/person (10 L/s)

C.

Sensors were not installed in occupiable spaces to monitor dry-bulb temperature and relative humidity

D.

Mechanical system does not have the capability of maintaining relative humidity between 30% and 60% at all times

Full Access
Question # 12

A shopping center wants to comply with W08: Hygiene Support in family bathrooms. Which of the following is a strategy to achieve this feature?

A.

Touch-free exit

B.

Cleaning records

C.

Diaper dispenser

D.

Children's toilet facilities

Full Access
Question # 13

A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?

A.

Noise levels from mechanical systems should be higher than external noise breaking in from outside

B.

There should be careful detailing of internal partition junctions where noise flanking between spaces can be an issue

C.

Personal headphones should be made available to all staff during peak hours of the day when the road traffic noise outside is at its highest

D.

Noise sensitive rooms should be located in the middle of the floor plate or along a facade that is physically shielded from external noise sources

Full Access
Question # 14

Which of the following design strategies implemented in the meeting rooms would help the protect achieve Feature S04: Reverberation Time?

A.

An accent stone wall

B.

A floor-to ceiling glass wall

C.

An accent wall with felt pieces

D.

A painted plasterboard.drywall ceiling and wall

Full Access
Question # 15

A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?

A.

Perform a post occupancy survey

B.

Conduct an internal performance verification

C.

Wait until 50% occupancy for performance verification

D.

Proceed with performance verification at 45% occupancy

Full Access
Question # 16

A project team wants to provide compliant cycling infrastructure for its occupants to fulfill a WELL feature. Which of the following should the team implement?

A.

The project is located near a bike network that connects riders to five use types

B.

Long-term bike parking (e.g., bike room) can accommodate at least 2.5% peak visitors

C.

The project is located in an area (zip or postal code) with a minimum Bike Score® of 40

D.

Short-term bike parking (e.g., outdoor bike racks) is available for at least 2.5% of peak visitors

Full Access
Question # 17

What is the value of performance verification in the certification process?

A.

To simplify the documentation process

B.

To validate the calibration of monitors and sensors

C.

To ensure that the building is performing as designed

D.

To verify high quality of workmanship by the contractor

Full Access
Question # 18

What type of test should a building owner use to assess the building envelope's performance in regard to moisture protection?

A.

Water pH test

B.

Isotope tracing

C.

Air tightness test

D.

Mold spore sampling

Full Access
Question # 19

For an office project lo earn one point in Feature L03 Orcadian Lighting Design what level of equivalent melanopic lux (EMI) needs to be achieved at workstations in regularly occupied spaces and which piano should the light be achieved on?

A.

At least 100 EML; measured on the vertical plane

B.

At least 150 EML; measured on the vertical vertical

C.

At least 100 EML; measured on the horizontal plane

D.

At least 150 EML; measured on the horizontal plane

Full Access
Question # 20

A project team plans to seal the HVAC ducts in order to protect them from possible air contamination. In which of the following building phases is this measure most likely to be adopted?

A.

Design

B.

Operation

C.

Pre-design

D.

Construction

Full Access
Question # 21

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Which design element would need to be included to meet the requirements of Feature L05 Daylight Design Strategies. Part 2: Integrate Solar Shading?

A.

Task lighting at all workstations

B.

Manual screens/blinds controlled by occupants

C.

An illuminance ratio of at least 0.4 or 1:2.

D.

Target illuminance of fc (300 lux) for >50% of the unit area

Full Access
Question # 22

The guiding principle for promoting optimal circadian entrainment and sleep is

A.

sunlit days

B.

dim light at night

C.

continuous intense light

D.

periods of light and darkness

Full Access
Question # 23

The Airside Organization's Human Resources department recently deployed a survey gauging employee opinion on the company's benefits and perceptions of various healthcare criteria. The results indicated a lack of understanding of various mental health disorders and a concern for working with teammates with mental health conditions. Which of the following strategies addresses the survey's findings and would receive full points under Feature M04: Mental Health Education?

A.

Create a library with mental health resources

B.

Redistribute the mental health survey at a future date

C.

Implement regular mental health trainings twice a year

D.

Provide employees with continued access to onsite mental health counselors

Full Access
Question # 24

A client would like to include a designated smoking area in a WELL project in order to satisfy tenants' requests According to the requirements of Feature A02: Smoke-Free Environment, what guidelines should the WELL AP recommend for the location of the designated smoking area?

A.

In a dedicated indoor space more than 25 ft. (7. 5m) distant from regularly occupied spaces

B.

Outdoors at around level at more than 25 ft. (7.5 m) from all entrances, operable windows and building air intakes

C.

On decks, patios, balconies, rooftops, and other occupiable outdoor areas above ground level with a net surface area of at least 1,000 ft2 (93 m2)

D.

In a dedicated indoor space with dedicated exhaust ventilation system with a flow rate of not less than 10 ft3 minute (5i3 per second) per 1,000 ft3 (93 m2)

Full Access
Question # 25

For which parameters does the WELL Building Standard™ set performance-based thresholds through Feature A01: Air Quality?

A.

PM, copper, radon and chlorine

B.

PM, benzene, ozone and radon

C.

Carbon dioxide, copper, lead and formaldehyde

D.

Acetaldehyde, acrylonitrile, caprolactam and naphthalene

Full Access
Question # 26

A WELL AP is advising a project in achieving Feature W06: Drinking Water Promotion. At minimum, how often should the WELL AP recommend mouthpieces and aerators of water dispensers be cleaned?

A.

Daily

B.

Weekly

C.

Twice daily

D.

Twice weekly

Full Access
Question # 27

A project team is evaluating products to meet Feature X07: Materials Transparency, Part 1: Select Products with Disclosed Ingredients. What strategy should the team take to ensure products meet this feature's requirements?

A.

Identify products that meet ANSI/BIFMA e3-2014

B.

Identify products that are subject to SCAQMD Rule 1168

C.

Identify products that have a Health Product Declaration (HPD)

D.

Identify products that comply with California Department of Public Health (CDPH) orilorio

Full Access
Question # 28

Which of the following most affects respiratory health?

A.

Polychlorinated biphenyls (PCBs)

B.

Volatile organic compounds (VOCs)

C.

Chromated copper arsenates (CCAs)

D.

Perfluorinated alkyl compounds (PFCs)

Full Access
Question # 29

Under which of the following circumstances must projects provide a plan for reprogramming or mitigating sound transmission'?

A.

A quiet zone directly border a loud zone

B.

A mixed zone directly borders a quiet zone

C.

A loud zone directly borders o mixed zone

D.

A circulation zone directly borders a mixed zone

Full Access
Question # 30

The production of polychlorinated biphenyls (PCBs) has been widely restricted, as they are

A.

biocides that can leach into the environment

B.

carcinogens that bioaccumulate in the environment

C.

total dissolved solids that accumulate in the environment

D.

volatile organic compounds that off-gas into the environment

Full Access
Question # 31

An Environment. Health and Safety (EHS) manager finds that an quality at an indoor construction site is degrading because the contractors are demolishing wooden boards Which stop should the manager lake first to address this problem?

A.

Clean and seal all the ducts

B.

Use walk-off mats at entryways

C.

Use saws with dust guards or collectors

D.

Install media filters with a PM10 removal rating

Full Access
Question # 32

Based on the WELL Building Standard™, what is a possible contributing factor to Type 2 diabetes?

A.

High consumption of seafood

B.

Low fruit and vegetable intake

C.

High consumption of caffeinated beverages

D.

Low consumption of sugar sweetened beverages

Full Access
Question # 33

Workplace family support includes parental leave policies that give paid paternity and maternity leave for the primary caregiver during any 12-month period for at least

A.

Six work weeks

B.

Eight work weeks

C.

10 work weeks

D.

12 work weeks

Full Access
Question # 34

A WELL AP is developing a project's waste management plan. Which of the following is the best strategy lot managing the cleaning of spills of mercury, pesticides and battery acid?

A.

Label storage containers property

B.

Contain ail residue in a sealed container

C.

Arrange for annual removal of all containers

D.

Assign inventory storage locations for containers

Full Access
Question # 35

The facility manager has implemented ultraviolet air treatment. According to WELL requirements, which step should the WELL AP take regarding UV system maintenance and inspection?

A.

Conduct an energy audit of the HVAC system

B.

Review whether existing ventilation systems have been tested and balanced

C.

Take pictures of the cooling coils being irradiated and submit them through the WELL digital platform

D.

Find evidence that required components have been replaced or maintained according to manufacturer's recommendation

Full Access
Question # 36

A project team is working to certify an existing space and is preparing for a stakeholder charrette. What should the WELL AP remind the facilitator to do early in the planning process to comply with Feature C02: Integrative Design?

A.

Pretest air and water quality

B.

Assess current daylight levels

C.

Establish health and well-being goals

D.

Provide a WELL guided tour of the project

Full Access
Question # 37

A WELL AP is communicating the recertification requirements to the project owner. Which is the best strategy to simplify the process?

A.

Submit all reports prior to applying for recertification

B.

Hire an approved WELL Performance Testing Agent to conduct recertification pre-testing

C.

Prepare a file of the maintenance logs and reports for recertification prior to the WELL Performance Testing Agent's site visit

D.

Use an approved WELL Performance Testing Agent to conduct ongoing monitoring of environmental parameters for recertification

Full Access
Question # 38

In addition to M06: Restorative Opportunities, which feature contributes to a healthy sleep and wake rhythm?

A.

Feature M10: Tobacco Cessation

B.

Feature L03: Circadian Lighting Design

C.

Feature M08: Restorative Programming

D.

Feature V02: Ergonomic Workstation Design

Full Access
Question # 39

A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?

A.

Apply for the certificate of occupancy (CO)

B.

Determine the schedule for the tenants finish-out and move-in

C.

Inform the developer that performance verification requires at least 50% occupancy

D.

Schedule performance verification since all pre-verification requirements are

Full Access
Question # 40

Which of the following Air features is a precondition that addresses potential issues caused by benzene, formaldehyde and toulene contamination in occupiable spaces?

A.

Feature A01 Air Quality, Part 2: Meet Thresholds for Organic Gases

B.

Feature A01 Air Quality, Part 3: Meet Thresholds for Inorganic Gases

C.

Feature A05 Enhanced Air Quality, Part 2: Meet Enhanced Thresholds for Organic Gases

D.

Feature A05 Enhanced Air Quality, Part 3: Meet Enhanced Thresholds for Inorganic Gases

Full Access
Question # 41

In addition to addressing a variety of emergency situations, what else must a project address in Feature C03: Emergency Preparedness?

A.

Business continuity plan

B.

Opioid response training

C.

Employee assistance fund

D.

Annual inventory of response resources

Full Access
Question # 42

A financial service office is undergoing renovation and would like to provide nature access to its employees. Which of the following should the design loam include for regular occupants to access to moot Feature MO9 Enhanced Access to Nature?

A.

An outdoor sculpture located within 50 ft. (15 m) of conference rooms.

B.

An outdoor space of an area of at least 5% of the project interior area

C.

At least 50% of the accessible outdoor spaces with a direct view of plants

D.

A green wall within a direct line of sight for at least 50% of all workstations

Full Access
Question # 43

Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?

A.

Weekly

B.

Monthly

C.

Quarterly

D.

Annually

Full Access
Question # 44

There is an office building with a regularly occupied project area of 25.000 ft2 (2 322 m2). In which the owner wants to implement radiant heating and cooling to achieve a higher level of thermal comfort for the occupants To meet Feature T05 Radiant Thermal Comfort, what is the minimum area that must be serviced by radiant heating or cooling?

A)

WELL-AP question answer

B)

WELL-AP question answer

C)

WELL-AP question answer

D)

WELL-AP question answer

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 45

According to the WELL Building Standard™, approximately what percentage of the global adult population fails to achieve activity guidelines and is considered physically inactive?

A.

3%

B.

13%

C.

23%

D.

33%

Full Access
Question # 46

Which of the following is an effective strategy to promote stair use by building occupants?

A.

Place artwork throughout the stairwell

B.

Locate to the stairwell in the building core

C.

Use lights with a warmer color temperature in the stairwell

D.

Ensure appropriate reverberation time thresholds in the stairwell

Full Access
Question # 47

A project owner would like to raise awareness of healthy foods to their occupants. Which of the following strategies will also help fulfil a WELL feature?

A.

Offer a variety or Mediterranean-style and vegetarian options

B.

Offer organic food and Certified Humane® options at least once a week

C.

Offer sugar-free beverages and low-fat dairy products with discounted prices

D.

Design a digital message board and menu featuring a variety of fruits and vegetables

Full Access
Question # 48

What is the maximum number of points that projects registered with WELL v2™ may pursue under the Innovation Concept?

A.

Three points

B.

Five points

C.

Eight points

D.

10 points

Full Access
Question # 49

A project's site previously housed a fuel station and an automotive repair shop. Which strategy should the WELL AP recommend?

A.

Hire an experienced professional to perform an environmental site assessment

B.

Engage the local community to create a strategic approach about historical use of the site

C.

Inspect the site to see if any evidence of the fuel station or automotive repair shop remains

D.

Determine if the site is a recognized Brownfield or has a similar designation from the relevant authority

Full Access
Question # 50

A WELL AP is advising a project team about the benefits and tradeoffs of installing operable windows on a new office building Feature A07 Operable Windows addresses the need to alert building occupants when outdoor air temperature or air quality compromises the health benefits associated with opening the windows.

Which of the following features addresses another hearth concern originating outside the building that, if not properly managed, could be exacerbated by operable window?

A.

Feature X06: VOC Restrictions

B.

Feature A11: Source Separation

C.

Feature S02: Maximum Noise Levels

D.

Feature L05: Daylight Design Strategies

Full Access
Question # 51

Which of the following techniques is used to remove pollutants that were introduced indoors during construction prior to occupancy?

A.

Using low-VOC paints

B.

Performing an air flush

C.

Protecting absorptive materials

D.

Installing permanent walk-off mats

Full Access
Question # 52

Which of the following references could be used for Feature L02: Visual Lighting Design, Part 1: Provide Visual Acuity?

A.

ISO 8995-1:2002

B.

AS 1668.4-2012

C.

ANSI S3.1-2018

D.

2019 CARB SCM

Full Access