An organic coffee shop would like to establish an internal policy to support healthy working hours for staff to meet Feature M06: Restorative Opportunities. Which of the following strategies should be addressed?
Which of the following is an effective strategy to promote stair use by building occupants?
A WELL Certified space has a quiet room that can be utilized by employees for reflection, prayer, meditation or other restful practices. Which of the following should be incorporated in the quiet room to meet the requirements of Feature M07: Restorative Spaces?
A project team is pursuing Feature A08 Air Quality Monitoring and Awareness The installed air quality monitor density should at least be one sensor per
A)
B)
C)
D)
A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?
indoor air tests for a project show high levels of carbon monoxide and nitrogen dioxide. This indicates the presence of which of the following"?
The Project must provide which of the following pieces of information at registration?
During an initial kick-off meeting for a project pursuing WELL Certification, the team set a goal of supporting employee mental health by reducing work-associated stress and burnout while improving mood and sleep quality. Which of the following strategies could also contribute toward points in the Mind concept?
According to Feature C01: Health and Wellness Promotion. Provide WELL Feature Guide, how frequently should a building manager send communications about health resources, programs, amenities and policies available to regular occupants?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
How can this project earn points from a feature in the Nourishment concept?
Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by
An employer will be leasing a new building that has one central space for a cafeteria. Which of the following conditions should the employer look for in order to comply with Feature N08: Mindful Eating?
Which of the following must be provided to all eligible employees within a WELL Certified Building?
A well-being team in a commercial office building is interested in starting a garden. Twenty of the 400 employees are interested in starting an herb and vegetable garden. A minimum of how much space is required for the garden to earn an Optimization in the WELL Building Standard™ (WELL™)?
A project team tested their building water supply and found high levels of organic contaminants present. The level detected exceeds the threshold prescribed by the WELL Building Standard™ (WELL™). At minimum, which of the following plumbing fixtures/systems will the project team be required to address?
A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?
A design for a WELL building has HVAC zones of 650 ft2 (60 m2) and less than 10 occupants for more than 90% of regularly occupied spaces. This design
The annual average particulate matter (PM2.5) outside of an office is 30 ug/m*. Which of the following indoor test results meets the requirements of Feature A01: Air Quality?
A)
B)
C)
D)
A building operations staff and a WELL AP are developing a cleaning plan for a new office building. What is the best strategy to minimize environmental damage from the cleaning process?
To reduce sound transmission between adjacent spaces, construction plans should specify
Which strategy promotes proper hydration and access to drinking water and can contribute to points in the Water concept?
As a part of a new initiative of a hospital, the program leader is targeting Feature C11: Civic Engagement. Which of the following policies should be implemented to support this endeavor?
Which of the following steps can be most effective in reducing antibiotics and pesticides in food?
Which of the following design strategies implemented in the meeting rooms would help the protect achieve Feature S04: Reverberation Time?
Which of the following room adjacencies is most likely to require additional sound mitigating transmission measures if reprogramming is not possible?
Which of the following ongoing procedures is required for water dispensers in Feature W06?
An office pursuing WELL Certification offers no-cost group fitness classes (30 minutes, twice per week) and is pursuing V06: Physical Activity Opportunities for one point. The company's benefits package also includes a subsidy for employees to set individual physical activity and exercise goals and prizes when employees accomplish their goals. The project is hoping to use this to meet another feature. What other feature can the WELL AP recommend to this project based on the offerings in the benefits package?
A small family-run business owned by an accredited nutritionist has noticed an increase in the number of processed foods brought in by employees for lunch. Which strategy could the WELL AP recommend at no additional cost to the client to meet the requirements of Feature N07 Nutrition Education?
Which of the following is an accurate list of the core parameters that impact thermal comfort in a mechanically conditioned space?
A WELL AP is coordinating feature documentation from various team members. The project's architect, owner and facility manager may be asked to provide what documentation?
A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by
An architect interested in incorporating biophilia has chosen to include water features in the design Which of the following related features will be impacted by this strategy?
What type of test should a building owner use to assess the building envelope's performance in regard to moisture protection?
A design for a WELL building has a dry-bulb temperature and relative humidity monitoring system. To achieve Feature T06: Thermal Comfort Monitoring the project team must confirm that
The office manager has received several complaints that staff who use the boardroom can clearly hear and understand conversations that take place in the adjacent corridor. What is the likely cause of this acoustic issue?
Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their
primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its
employee benefits and organizational policies. As an example, they offer a 50% discount on several
mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Given the facade design, referenced in the protect scenario A, which feature is most appropriate for this project?
The WELL Building Standard™ (WELL™) requires a project team to limit the use of pesticides to those with which Hazard Tier ranking?
Which of the following Air features is a precondition that addresses potential issues caused by benzene, formaldehyde and toulene contamination in occupiable spaces?
A client taking up one floor of a high-rise building is pulling together materials for an upcoming stakeholder charrette and has asked the WELL AP to review the information to ensure that the requirements of Feature C02: Integrative Process will be met. The WELL AP noticed that the list of invitees seemed long. In order to accommodate an effective charrette, which of the following groups should the WELL AP suggest that the client remove from the list of invitees?
Which of the following can help a real estate investor select a site with access to local mass transit to comply with the WELL Building Standard™ (WELL™)?
An open office has an overhead T8 Fluorescent lighting system. To comply with Feature L04 Electric Lighting Glare Control, what is the maximum luminance for light omitted more than 45 degrees from nadir and below the horizontal plane?
Which of the following hazardous materials is known to impair the intellectual development of children and the unborn during pregnancy?
The design for a WELL budding has restricted volatile organic compounds (VOCs) emissions (or carpeting and resilient flooring that covers over 90% of the surface area. To achieve Feature X06 VOC Restrictions, which of the following standards must the carpeting and resilient flooring comply with?
What are possible impacts of poor lighting color rendering and flicker on people's health?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
Which of the following filters can assist with the removal of organic chemicals from water intended for human consumption?
A WELL AP is reviewing a client's waste management plan for Feature X09: Waste Management. Which key requirement must be confirmed?
Which of the following is an important consideration addressed by Feature A13: Enhanced Supply Air?
Which of the following describes the purpose of an alternative adherence path (AAP)?
At a local university, lecturers teaching in an auditorium receive feedback that students experience an echo during class.
The following is some basic information about the auditorium:
. There are a total of 200 fully upholstered seats (10 rows of 20 seats each)
. A fabric covered ceiling is installed, suspended 5 ft. (1.52 m) from the concrete slab above
. 50% of the floor is carpeted, with the other 50% bare concrete finish
. The walls are left as bare concrete
Which of the following design interventions would be most likely to reduce reverberation times in the auditorium?
The intent of Feature X01: Material Restrictions is to reduce or eliminate human exposure to building materials known to be hazardous. This feature restricts the amount of asbestos, mercury and what other material in newly installed building products?
The WELL project administrator realizes that a project's special circumstances do not meet the WELL features, as written. They would like to explore other means of compliance and cannot find a similar situation in the official International WELL Building Institute™ (IWBI™) guidelines. What should the project administrator do next?
Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their
primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its
employee benefits and organizational policies. As an example, they offer a 50% discount on several
mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Which design element would need to be included to meet the requirements of Feature L05 Daylight Design Strategies. Part 2: Integrate Solar Shading?
Based on the WELL Building Standard™, what is a possible contributing factor to Type 2 diabetes?
A WELL AP is communicating the recertification requirements to the project owner. Which is the best strategy to simplify the process?