Summer Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

CTFL-PT_D PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CTFL-PT_D PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: ISTQB Certified Tester Foundation Level - Specialist Performance Testing
  • Last Update: Sep 12, 2025
  • Questions and Answers: 40
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CTFL-PT_D Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CTFL-PT_D Practice Exam Questions with Answers ISTQB Certified Tester Foundation Level - Specialist Performance Testing Certification

Question # 6

Select the architecture that, in addition to the virtualized systems, could present performance risks associated with virtualization.

SELECT ONE OPTION

A.

Dynamic/cloud-based systems.

B.

Multi Tier systems.

C.

Client-server systems.

D.

Distributed systems.

Full Access
Question # 7

Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).

1.Load generator.

2.Load management console.

3.Monitoring tool.

1.It monitors, records and/or analyzes the behavior of the component or system under test.

2.It creates the load and also collects the metrics for later communication.

3.It provides the control to start and stop the creation and execution of the user simulation.

4.It aggregates metrics from the various transactions that are defined within the load instances

5.It creates and runs multiple client instances that simulate user behavior.

6.It can effectively support a root cause analysis of performance in a system under test.

SELECT ONE OPTION

A.

1A- 1E-2A-2C-2D-3F.

B.

1B-1E-2C-2D-3A-3F.

C.

1B-1A-2A-2D-3C-3F

D.

1B- 1F-2C-2F-3A-3D.

Full Access
Question # 8

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.

The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.

Question

Assuming there is one boarding every 5 minutes, what should be the minimum front-end processing capacity of the system for the "departing passenger* user? It is assumed that there will be 12 peaks or maximums per hour.

SELECT ONE OPTION

A.

100 * 12 + (60-12) *4.69 = 1,425.12 transactlons/hour

B.

100 « 12 + (60 -12) * (10.42 - 4.69) = 1.475.04 transactions/hour

C.

100 * 12 + (60 -12) * 15.10 = 1,924.80 transactions/hour

D.

100 * 12 + (60 -12) * 10.42 = 1.700.16 transactions/hour

Full Access
Question # 9

Scenario

James is participating in a project In which a web portal is being developed to sell tickets for different types of events.

Once the sale has been made and confirmed by the payment channel, the information must be available to the rest of the types of user (for example, the managers of each event) In a maximum time of 2 seconds (It Is expected that this temporal constraint will be met in 95% of the transactions and that 90% of the transactions will be completed at 100%).

Ticket sales take place during a time window (start date and time, end date and time) that is announced in advance. At the beginning of this window, there are peaks of 150 users per minute, for 5 minutes.

Question

Choose the option that enables James to meet the performance target.

SELECT ONE OPTION

A.

Establish the acceptance criteria for response times.

B.

Create a baseline corresponding to the total number of users registered in the production database.

C.

There is no need to set a baseline for the peak attendance, it is a known value.

D.

Create a baseline for maximum attendance for the ticketing transaction.

Full Access
Question # 10

What are the main activities of performance test execution?

1.Monitoring all parts of the environment.

2.Setting up the load generation and monitoring tools.

3.Collecting and keeping all results and information related to the test.

4.Generation of a load against the SUT according to a load profile.

5.Parameterize the test scripts.

6.Setting up the system under test.

SELECT ONE OPTION

A.

The following are performance test activities: III, IV.

B.

The following are performance test activities: I, III. IV.

C.

The following are performance test activities: I. V, VI.

D.

The following are performance test activities: I, III, VI.

Full Access
Question # 11

Refer to Base Scenario 1: When you refer to Base Scenario 1, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

•The project follows an iterative and Incremental development life cycle model.

•Development approach: Agile.

Question

Which of the statement(s) below is (are) TRUE regarding how the performance test is undertaken7

1.The performance test can have a dedicated iteration in a specific way.

2.Performance testing should be performed in a cloud-based performance test environment

3.The performance test may be conducted by a specific team.

4.A performance test cycle must be performed in each iteration by the development team (Agile).

SELECT ONE OPTION

A.

True statements: IV.

B.

True statements: III, IV.

C.

True statements: II, III.

D.

True statements: I, III.

Full Access
Question # 12

Inwhich activity of the testing process are specific test conditions identified for performance testing?

SELECT ONE OPTION

A.

Test planning.

B.

Test monitoring and control.

C.

Test analysis.

D.

Test design.

Full Access