3 Months Free Update
3 Months Free Update
3 Months Free Update
An alphanumeric password must be between 4 and 7 characters long and must contain at least one numeric character, one capital (uppercase) letter and one lowercase letter of the alphabet.
Which one of the following sets of test cases represents the correct outcome of a two-value boundary value analysis applied to the password length? (Note: test cases are separated by a semicolon)
An anti-intrusion system is battery powered and is activated by pressing the only available button. To deactivate the system, the operator must enter a PIN code. The system will stay in alert mode within a configurable timeout and an alarm bell will ring if the system is not deactivated before the timeout expires. The following state transition diagram describes the behavior of the system:
What is the minimum number of test cases needed to cover every unique sequence of exactly 4 states/3 transitions starting and ending in the “Inactive” state? (note that “Inactive” is not a final state in the diagram)
Which of the following is an example of scenario-oriented acceptance criteria?
Which of the following is a role that is usually responsible for documenting the findings (e.g., action items, decisions, recommendations) made by the review team as part of a typical formal review?
Which of the following statements about impact of DevOps on testing is CORRECT?
Consider the following examples of risks identified in different software development projects:
[I]. It may not be possible to generate the expected workloads to run performance tests, due to the poor hardware equipment of the machines (load injectors) that should generate these workloads
[II]. A user’s session on a web application is not invalidated after a certain period of inactivity (configured by the system administrator) of the user
[III]. The test team will not have an adequate requirements specification (since many requirements will still be missing) by the time test design and analysis activities should begin according to the test plan
[IV]. Following a failure, the system is unable to continue to maintain its pre-failure operation and some data becomes corrupted
Which of the following statements is true?
A company runs a pilot project for evaluation of a test automation tool. Which of the following is NOT a valid object of this pilot project?
Consider the following user story about the authentication functionality of an e-commerce website:
"As a logged-in user, I want to change my current password with a new one, so that I can make my account safer".
The following are some of the acceptance criteria defined for the user story:
[a] After the logged-in user has successfully changed his password, an email confirming the change must be sent to him
[b] To successfully change the password, the logged-in user must enter the current password, enter a new valid password, and finally confirm by pressing the 'Change Password' button
[c] To be valid, the new password entered by the logged-in user is not only required to meet the criteria related to the length and type of characters, but must also be different form the last 5 passwords of that user
[d] A dedicated error message must be presented to the logged-in user when he enters a wrong current password
[e] A dedicated error message must be presented to the logged-in user when he enters the correct current password, but enters an invalid password
Based only on the given information, which of the following ATDD tests is most likely to be written first?
A requirement specifies that if the total amount of sales (TAS) made during the year by a corporate seller is 300000€ or more, the bonus that must be paid to the seller is 100% of a certain amount agreed upon at the beginning of the year. The software contains a fault as it implements this requirement with the decision "IF (TAS = 300000)" instead of "IF (TAS >= 300000)". The application of the 3-value boundary value analysis to this problem consists of the following three test cases (TAS is an integer variable):
TC1 = 299999 TC2=300000 TC3=300001
Which of the following statements is true?
A new web app aims at offering a rich user experience. As a functional tester, you have run some functional tests to verify that, before releasing the app, such app works correctly on several mobile devices, all of which are listed as supported devices within the requirements specification. These tests were performed on stable and isolated test environments where you were the only user interacting with the application. All tests passed, but in some of those tests you observed the following issue: on some mobile devices only, the response time for two web pages containing images was extremely slow.
Based only on the given information, which of the following recommendation would you follow?
Which of the following statements about how different types of test tools support testers is true?
Given some statements about independence of testing
i.Independence is a replacement for familiarity with the code
ii.Independence helps remove the biases produced because of own work
iii.Similar kind of failures can be detected by anyone
iv.Assumptions by different people are different revealing weaknesses Which of the following CORRECTLY represents the benefits?
Which of the following statements about estimation of the test effort is WRONG?
Which of the following issues cannot be identified by static analysis tools?
Which of the following is NOT a typical debugging activity when a failure is triggered by dynamic testing?
Which ONE of the following options BEST describes thethird test quadrant (Q3)?
Which of the following statements about the value of maintaining traceability between the test basis and test work products is not true?
An agile software development organization has recently hired a senior tester. The organization has distributed teams spread across time zones. They need to share test status with various stakeholders including upper management and customers at a regular interval. Which of the following statements seems to be correct with regards to the communication?
Which of the following is the main difference between quality assurance (QA) and quality control (QC)?
Which ONE of the following options BEST describes Behavior-Driven Development (BDD)?
Which of the following is not an example of a typical content of a test completion report for a test project?
The following decision table is used to assist a doctor in determining the drug therapy to prescribe for a patient (aged 6 to 65 years) diagnosed with acute sinusitis. The table consists of three Boolean conditions and six actions:
Based only on the given information, which of the following statements is true?
Which ONE of the following options CANNOT be subjected to static analysis?
Which ONE of the following elements is TYPICALLY used to guide testing duringexploratory testing?
Which ONE of the following options MOST ACCURATELY describes the activities of “testing” and “debugging”?
Which of the following is a good testing practice which is applicable INDEPENDENT of the software development lifecycle followed?
A company wants to reward each of its salespeople with an annual bonus that represents the sum of all the bonuses accumulated for every single sale made by that salesperson. The bonus for a single sale can take on the following four values: 3%, 5%, 7% and 10% (the percentage refers to the amount of the single sale). These values are determined on the basis of the type of customer (classified as "Basic" or "Premium") to which such sale was made, and on the amount of such sale classified into the following three groups G1, G2 and G3:
• [G1]: less than 300 euros
• [G2]: between 300 and 2000 euros
• [G3]: greater than 2000 euros
Which of the following is the minimum number of test cases needed to cover the full decision table associated with this scenario?
Which of the following statements refers to a good testing practice that applies to all software development lifecycles?
Which ONE of the following options BEST describes black-box test techniques?
Which ONE of the following elements is TYPICALLYNOTpart of atest progress report?
Consider an estimation session where a six-member Agile team (Memb1, ... , Memb6) is performing a planning poker session to estimate a user story (in story points). Team
members are using a set of cards with the following values: 1, 2, 3, 5, 8, 13, 21. Below is the outcome produced by the first round of estimation for this session:
Which of the following answers best describes how the estimation session should proceed?
Which ONE of the following roles is responsible for mediating, managing time, and generating a safe review environment in which everyone can speak freely?
Following a risk-based testing approach you have designed 10 tests to cover a product risk with a high-risk level. You want to estimate, adopting the three-point test estimation technique, the test effort required to reduce the risk level to zero by executing those 10 tests. You made the following three initial estimates:
• most optimistic = 6 person hours
• most likely = 30 person hours
• most pessimistic = 54 person hours
Based only on the given information, which of the following answers about the three-point test estimation technique applied to this problem is true?
Which of the following s the most correct statement about state testing techniques?
In a two-hour uninterrupted test session, performed as part of an iteration on an Agile project, a heuristic checklist was used to help the tester focus on some specific usability issues of a web application.
The unscripted tests produced by the tester's experience during such session belong to which one of the following testing quadrants?
In which of the following test documents would you expect to find test exit criteria described9
What type of testing measures its effectiveness by tracking which lines of code were executed by the tests?
Which ONE of the following options identifies the acceptance criteria that has NOT been fully covered during the above test cycle?
What does the "absence-of-defects fallacy" refer to in software development?
For each of the test cases to be executed, the following table specifies the priority order and dependencies on other test cases
Which of the following test execution schedules is compatible with the logical dependencies and allows executing the test cases in priority order?
As a result of the joint evaluation of a product version with the customer, it has been concluded that it would be appropriate to retrieve an earlier version of the product and carry out a benchmark. Depending on the result, further development will be carried out based on the current version or the retrieved version.
Which mechanism, process, and/or technique will allow the specific version (including the testing work products) of a given software product to be restored?
You are a tester working on a critical project. Based on the risk analysis you need to decide on the order of test execution. Which of the following lists the correct sequence of test execution? Priority 1 is the highest and Priority 3 is the lowest priority.
Test CasePriorityDependencies
Test A3-
Test B1TestD
TestC2Test A
Test D3•
A Test Manager conducts risk assessment for a project. One of the identified risks is: The sub-contractor may fail to meet his commitment". If this risk materializes. it will lead to delay in completion of testing required for the current cycle.
Which of the following sentences correctly describes the risk?
Which of the following applications will be the MOST suitable for testing by Use Cases