We at Crack4sure are committed to giving students who are preparing for the API API-SIEE Exam the most current and reliable questions . To help people study, we've made some of our Source Inspector Electrical Equipment exam materials available for free to everyone. You can take the Free API-SIEE Practice Test as many times as you want. The answers to the practice questions are given, and each answer is explained.

Question # 6

According to ANSI/IEEE C37.20.2, wiring across a hinge shall be all of the following except:

A.

sufficiently flexible to withstand repeated door movement without sustaining damage to wire strands or insulation.

B.

installed in a flexible non-metallic conduit with a separate ground terminated at the door and at the switchgear ground bus and chosen per the minimum wire size table.

C.

a formed loop as it crosses the hinge and secured to the equipment at both ends in such a manner that negligible strain is transmitted to wire beyond the securements.

D.

No. 14 AWG and larger, and C or D stranding.

Question # 7

What is the purpose of a clamp meter?

A.

To measure the magnetic field around a conductor

B.

To test that the electrical equipment maximum temperature does not exceed the ignition temperature of gases in the environment

C.

To externally measure the sum of the current flowing through the cable

D.

To verify the process temperature and the equipment temperature have the same Class 1 rating

Question # 8

During transformer inspection, the source inspector should verify that alarm, control, and trip settings on temperature and level indicators are:

A.

omitted unless requested by operations

B.

identical for every transformer rating

C.

as specified

D.

determined only by the freight forwarder

Question # 9

According to NFPA 70, is the use of Teflon tape on threaded connections for conduits allowed?

A.

Only when installed in a Class I, Division 2 area

B.

Yes, the use of Teflon on metal raceways, cable armor, and other metal enclosures prevents water from entering

C.

No, metal raceways and other metal enclosures for conductors shall be metallically joined together into a continuous electrical conductor

D.

Yes, the use of Teflon ensures an explosion proof vapor seal

Question # 10

According to NFPA 70, equipment shall be marked to show the hazardous environment for which it has been evaluated. Markings on this equipment shall include which of the following?

A.

Class, voltage, current, material of construction, equipment temperature

B.

Class, division, material classification group, equipment temperature, ambient temperature range

C.

Class, voltage, material classification group, operating temperature, ambient temperature range

D.

Class, division, material of construction, equipment temperature, ambient temperature range

Question # 11

What does the second letter of the four-letter cooling code on liquid-immersed transformers identify?

A.

Internal cooling medium in contact with the windings

B.

Circulation mechanism for internal cooling medium

C.

External cooling medium

D.

Circulation mechanism for external cooling medium

Question # 12

In addition to purchase order requirements and company standards, what document would provide the details for correct coatings application?

A.

Quality Plan

B.

Manufacturers' Recommendations

C.

ASME BPVC Section II

D.

Inspection and Test Plan

Question # 13

What is the purpose of an equipment risk assessment in the source inspection process?

A.

To identify the level of risk associated with failure of the supplier/vendor’s quality system

B.

To identify the level of effort for source inspection activities during the manufacture/fabrication phase of a project at the supplier/vendor facility

C.

To identify which shops will be able to bid on certain types of equipment i.e. to identify the shops that can supply equipment critical to project success

D.

To determine the level of business insurance required in the event the supplier/vendor is unable to deliver the product on time while meeting contractual agreements

Question # 14

According to API 541, the combined runout for areas on the shaft that are to be observed by radial vibration probes shall not exceed:

A.

the maximum vibration amplitude specified in the manufacturer's test criteria.

B.

12.7 µm 0.5 mils.

C.

10% of allowed unfiltered peak to peak vibration amplitude or 3.2 µm 0.125 mils, whichever is greater.

D.

25% of allowed unfiltered peak to peak vibration amplitude or 6.4 µm 0.25 mils, whichever is greater.

Question # 15

What electronic instrument is used for measuring electrical potential difference between two points in an electric circuit?

A.

Amp meter

B.

Wheatstone bridge

C.

Voltmeter

D.

Potentiometer

Question # 16

What standard defines the maximum number of conductors permitted in outlets, devices and junction boxes, and conduit bodies?

A.

NFPA 70

B.

IEEE 112

C.

IEC 60079 series

D.

NEMA 250

Question # 17

Final inspection and shipping preparations of switchgear typically consists of verifying all of the following except:

A.

all final manufacturing and drawing issues are closed.

B.

correct engraving of unit and master nameplates.

C.

visual inspection of packaging requirements.

D.

all items on the manufacturer's QC checkout are signed off.

Question # 18

What is an advantage of the Insulation Resistance test?

A.

It is non-destructive in nature.

B.

It is not affected by higher moisture content in the air.

C.

It is not affected by increases in joint temperature.

D.

It can be conducted above the breakdown voltage of the insulation.

Question # 19

The Arc Flash PPE is required for:

A.

work on control circuits with exposed electrical conductors below 120 VAC.

B.

removal of covers on properly installed wireways, junction boxes, and cable trays.

C.

voltage-testing in ac systems with work on energized conductors.

D.

insulated cable examination with no manipulation of cable.

Question # 20

What is the process that aims to find potential defects in a product before it is released for delivery?

A.

Inspection

B.

Examination

C.

Quality Control

D.

Quality Assurance

Question # 21

Apparent power is measured in:

A.

mhos.

B.

vars.

C.

volt-amperes.

D.

watts.

Question # 22

A source inspector reviewing a control panel should verify wiring against which project document as a core inspection activity?

A.

Employee training log

B.

One-line wiring diagram

C.

Freight invoice

D.

Packing list only

Question # 23

According to API 541, when specified, shipping preparations shall make the equipment suitable for outdoor storage from the time of shipment for at least:

A.

three months.

B.

six months.

C.

nine months.

D.

twelve months.

Question # 24

During the course of manufacturing the supplier/vendor may propose design changes that could impact cost, schedule and/or quality. In such cases, the source inspector should:

A.

prepare a summary of the changes made for inclusion in their report and subsequent action by the purchaser.

B.

request that the supplier/vendor develop a cost/benefit analysis for review and approval by the inspector.

C.

prepare a cost/benefit analysis in order to justify their acceptance or rejection of the proposed changes.

D.

request that the supplier/vendor propose such changes in writing for review by the purchaser.

Question # 25

When a deviation from specifications, drawings, codes, or standards is identified, the source inspector should FIRST treat it as:

A.

a supplier observation only

B.

a schedule note

C.

a nonconformance

D.

a warranty issue

Question # 26

Areas where ignitable concentrations of flammable gases or vapors are present continuously or for long periods of time are classified as:

A.

Class I Zone 0.

B.

Class I Zone 1.

C.

Class I Division 2.

D.

Class I Zone 2.

Question # 27

Each source inspection assignment should have a detailed Inspection and Test Plan ITP which identifies the:

A.

day the inspection is to start.

B.

individuals involved in the inspection.

C.

activities to be performed during the inspection.

D.

activities to be performed and the acceptance criteria.

Question # 28

What is the purpose of an insulation resistance reading?

A.

To evaluate the insulation and condition of the grounding

B.

To determine the resistance of the conductors

C.

To evaluate the condition of the insulation between conductors and ground

D.

To determine if the conductors are properly terminated

Question # 29

According to API 541, subsequent to completion of manufacture and testing, the vendor shall revise and resubmit the previously supplied purchase data including all the following except:

A.

rotor-balance report.

B.

operating manual.

C.

as-built data sheet.

D.

shop test data.

Question # 30

What method is used to verify tightness of accessible bolted electrical connections?

A.

Compression of the lock-nut

B.

Visual inspection of torque markings

C.

Verification of assembly check sheet

D.

Calibrated torque wrench

Question # 31

Which of the following is identified in the guide as a key MCC design item?

A.

Ground bus

B.

Transformer conservator

C.

Buchholz relay

D.

Tap changer handle

Question # 32

Which of the following tools is used for inspection of coating?

A.

Dry film thickness DFT

B.

Digital surface profile gauge

C.

Surface profile replica tape

D.

Ultrasonic thickness meter

Question # 33

In hazardous classified locations on process skids, electrical and instrumentation equipment installed in the classified area must be:

A.

painted red

B.

certified for the hazardous location

C.

mounted only outdoors

D.

supplied by the same manufacturer as the process equipment

API-SIEE PDF

$33

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

API-SIEE PDF + Testing Engine

$52.8

$175.99

3 Months Free Update

  • Exam Name: Source Inspector Electrical Equipment
  • Last Update: Mar 16, 2026
  • Questions and Answers: 110
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

API-SIEE Engine

$39.6

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included