  • Exam Name: Huawei Certified Pre-sales Specialist - Service Solution
  • Last Update: May 2, 2024
  • Questions and Answers: 265
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

H19-321 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

H19-321 Practice Exam Questions with Answers Huawei Certified Pre-sales Specialist - Service Solution Certification

Question # 6

In the enterprise business China region, which maintenance service packages are involved in selling the correct answer (multiple choice)

A.

essential

B.

Standard & Standard+

C.

Silver & Silver+

D.

Gold & Gold+

E.

Platinum & Platinum+

Full Access
Question # 7

For customers, the total integration mode only needs to manage one integrator, and the management difficulty and professional requirements are reduced.

A.

True

B.

False

Full Access
Question # 8

the following description of the data center location, which is wrong.

A.

The power supply is stable and reliable, the transportation and communication are convenient, and the natural environment is clean

B.

There are no special requirements for equipment transportation, pipeline laying, and lightning induction

C.

Stay away from flood and fire hazard areas

D.

Keep away from strong vibration and noise sources

Full Access
Question # 9

What are the tools that underpin the SmartNOS service?

A.

Service-turbo

B.

Ensp

C.

Packet tracer

D.

Smartkit

Full Access
Question # 10

Huawei's training services provide customers with "professional, practical, and time-effective" learning and development solutions; Huawei's training services are committed to letting learning promote the development of capabilities and letting capabilities develop promote the progress of enterprises.

A.

True

B.

False

Full Access
Question # 11

The quotation submitted when the PRM system places an order is.

A.

Huawei shipment price

B.

Total consignment shipment price

C.

Cooperative unit quotation

Full Access
Question # 12

There are main ways to general contracting of construction projects. One DB (Design-Build) General Contractor, one EPC (Design - Buy - Construction) General Contracting.

A.

True

B.

False

Full Access
Question # 13

Which of the following is not part of the big data development support service?

A.

Parameter configuration guidance

B.

API A Guide

C.

Data integration

D.

Table design guidance

Full Access
Question # 14

The industry customer network environment is complex, the business is not the same, the demand for training courses is not the same, in the case of standardized courses do not meet customer needs, Huawei training and certification services can provide customized training for customers to confirm delivery?

A.

Customized training proposals

B.

Equipment BOQ and quotation

C.

Standard Course Training Proposal

D.

Bid and customer needs list

Full Access
Question # 15

The data center L1 integration project feedback should contain (multiple choice)

A.

Customer capital budget and construction time requirements

B.

Customer relationship support, channel cooperation progress

C.

Key competitor dynamics

D.

Currently in the operational phase of the project

Full Access
Question # 16

How many links does Huawei HCIE certification include? (Multiple choice)

A.

Written

B.

Experimental machine test

C.

interview

Full Access
Question # 17

Which of the following are cloud computing professional services? (Multiple choice)

A.

Desktop Cloud Integration Services - Solution Implementation

B.

Desktop Cloud VM Service Provisioning - Solution Implementation

C.

Cloud Computing Integration Services - Solution Implementation

D.

P2V/V2V service migration service

Full Access
Question # 18

modular data center products are suitable.

A.

Micro Data Centers

B.

Small data centers

C.

Medium to large data centers

D.

All of the above

Full Access
Question # 19

What kind of verification can the IP network evaluation and optimization service perform on the optimization and transformation plan?

A.

Field

B.

Penetration verification

C.

Offensive and defensive testing

D.

1:1 authentication

Full Access
Question # 20

In the pre-sale bidding stage, the customer's requirements should be fully met, even if it exceeds the training capacity, it should be reluctantly answered.

A.

True

B.

False

Full Access
Question # 21

Which one is not included in the business migration evaluation survey? (Multiple choice)

A.

Data center-level disaster recovery

B.

Data-level disaster recovery

C.

Application-level disaster recovery

D.

Business-level disaster recovery

Full Access
Question # 22

GSM-R evaluation and optimization service expansion strategy is incorrect:

A.

GSM-R new networks must bundle network premium services

B.

GSM-R Optimization Services and Planning and Design Services are sold in packages and cannot be split

C.

Customers have purchased maintenance services and do not need to purchase online preferential services

D.

GSM-R Centralized Network Optimization and GSM-R Expert Support Optimization Services are expanded by collecting existing network issues and network assessment models

Full Access
Question # 23

the higher the PUE value, represents.

A.

The greener the data room, the higher the degree

B.

The greener the data room, the lower the degree

Full Access
Question # 24

In the Hi-Care standard service package provided by Huawei, the spare parts response SLA is.

A.

7x10xND

B.

5x10x4

C.

7x24xND

D.

7x24x4

Full Access
Question # 25

Data Center L1 Integration Service Project Initiation Phase Goal?

A.

Set up a project team

B.

Identify project team members

C.

Pull-through resources are determined to do "total integration"

Full Access
Question # 26

UniSTAR SCT configurator, "mixed with the device quotation." "How to host which service offering offer?"

A.

Technical Support Services

B.

Media retention service

C.

Device health check service

D.

Training & Certification Services

Full Access
Question # 27

Data center L1 layer implementation delivery is mainly divided into () phases (multiple choice)

A.

The high-level design phase

B.

Drill down into the design phase

C.

Preparation phase

D.

Implementation phase

E.

Acceptance phase

Full Access
Question # 28

The highest level in Huawei's professional certification system is Huawei certiflcation lnternet Expert.

A.

True

B.

False

Full Access
Question # 29

How many optional modules does the IP planning and design service product include?

A.

1

B.

2

C.

3

D.

4

Full Access
Question # 30

Which of the following activities is not included in big data performance tuning?

A.

Performance monitoring

B.

Cluster performance analysis

C.

Component performance information collection

D.

ETL architecture consulting

Full Access
Question # 31

Huawei Senior Management Training is a series of courses summarized by Huawei's senior consultants from Huawei's many years of management practice, so which of the following content is not included?

A.

corporate culture

B.

Business innovation

C.

Top-level design

D.

Management innovation

Full Access
Question # 32

Measure and evaluate the 3 elements of a disaster recovery system that do not contain ().

A.

BM:BACkup WinDow

B.

The length of time left for the backup system to back up

C.

RPO:ReCovery Point OBjeCtive

D.

Describes the "maximum amount of data loss that can be tolerated" and the system data is restored to a previous point in time (there is data loss).

Full Access
Question # 33

What is the customer value of disaster recovery services? (Multiple choice)

A.

Improve the efficiency of disaster recovery construction and lower the threshold for disaster recovery construction

B.

Build business continuity capabilities

C.

Enhance customer disaster recovery

Full Access
Question # 34

Which of the following products is not covered by free warranty/replacement.

A.

host

B.

Business boards

C.

Cable

D.

hard disk

Full Access
Question # 35

Data Center L1 Layer Business Preparation Phase Objective () (Multiple Choice)

A.

Clarify existing contract interfaces and output services

B.

Subcontract Key Point Tips

C.

Prepare construction resources and environment

D.

Develop a reasonable and efficient construction plan

E.

Do a good job in technical communication and training before construction

Full Access
Question # 36

Huawei SmartNOS subscription service can be split based on customer needs, what service modules are included? (Multiple choice)

A.

Network optimization

B.

Network support

C.

O&M management

D.

Fault management

E.

Special optimization

Full Access
Question # 37

What aspects of customers need to be paid attention to in the maintenance sales process? (Multiple choice)

A.

Budget of funds

B.

Network importance

C.

The level of attention paid to the service

D.

The degree of dependence on the vendor

Full Access
Question # 38

What are the following SDH network optimizations? (Multiple choice)

A.

Network topology changes

B.

Business path optimization

C.

ECC subnet optimization

D.

Network clock synchronization optimization

E.

Single board replacement optimization

Full Access
Question # 39

in order to achieve the effectiveness of construction cost management, measures should be taken from a variety of aspects to implement management, which can usually be summarized as () (multiple choice)

A.

Organizational measures

B.

Technical measures

C.

Economic measures

D.

Contractual measures