Summer Sale Coupon - 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sbfdisc

CBAP PDF

$44

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

CBAP PDF + Testing Engine

$70.4

$175.99

3 Months Free Update

  • Exam Name: Certified Business Analysis Professional
  • Last Update: Apr 17, 2024
  • Questions and Answers: 497
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

CBAP Engine

$52.8

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

CBAP Practice Exam Questions with Answers Certified Business Analysis Professional Certification

Question # 6

You are the business analyst for your organization. Management realizes that a proposed solution has risks that may cause the entire project to fail. They would like you to prioritize the requirements with maximum risks first so that if the project fails, there is little loss of capital in the project implementation.

What requirements prioritization approach is management asking you to create in this instance?

A.

Implementation difficulty

B.

Business or technical risk

C.

Likelihood of success

D.

Relationship to other requirements

Full Access
Question # 7

You are the business analyst for your organization and management has asked that you identify opportunities to improve the operations of the business. You notice that some of the stakeholders use several pieces of software and several duplicate activities within each software package to generate data reports for customers.

What type of recommendation can you make in regard to this observation?

A.

You can address the automation of how the workers perform.

B.

You will need to perform active observation first to understand the processes in more detail.

C.

You can address the non-functional requirements of the activities.

D.

You will need to perform passive observation first to understand the processes in more detail.

Full Access
Question # 8

Which of the following processes is used to make certain that the project team members are completing the project work according to the project plan?

A.

Project time management

B.

Project scope management

C.

Quality management plan

D.

Quality control

Full Access
Question # 9

Paul is the business analyst for his organization. He is examining a single solution to determine if the solution he and his team have identified carries enough business value to justify its implementation.

What business analysis process is Paul performing in this scenario?

A.

Define transition requirements

B.

Assess proposed solution

C.

Assess organizational readiness

D.

Allocate requirements

Full Access
Question # 10

You are the business analyst for your organization. Management has asked that you create a model of the requirements so the stakeholders can better understand the requirements and the project as a whole.

Which of the following statements best describes a model?

A.

Models are slices of the project solution.

B.

Models simplify the requirements for common stakeholders.

C.

Models are statistics for the return on investment, time saved, and other mathematics.

D.

Models abstract and simplify reality.

Full Access
Question # 11

What is the term used to describe the cost of the solution after the solution has been implemented in production by a vendor?

A.

Total ownership costing

B.

Lifecycle maintenance fees

C.

Sustainability fees

D.

Total cost of ownership

Full Access
Question # 12

Which one of the following business analysis planning and monitoring techniques can be used to define and document the business analysis approach?

A.

Process modeling

B.

Structured walkthrough

C.

Decision analysis

D.

Control charts

Full Access
Question # 13

When can changes to requirements occur in a business analysis planning and monitoring assignment?

A.

Change to requirements can occur any time before the project scope statement is created.

B.

Changes to requirements can occur at any time.

C.

Changes to requirements can occur any time after the project's change control system has been enacted.

D.

Change to requirements can occur at any time before the key stakeholders approve the identified requirements.

Full Access
Question # 14

Your organization is using a plan-driven approach to business analysis.

What characteristic must be true of changes in the approach that your organization is using?

A.

All the changes only occur if they are less than an agreed factor, such as ten percent of the solution's overall cost or a percentage of the project's schedule.

B.

All the changes only occur if they are less than ten percent of the solution's overall cost.

C.

All the changes only occur if they are genuinely necessary.

D.

Changes are generally not permitted in the plan-driven approach to business analysis.

Full Access
Question # 15

You are the business analyst for your organization and are working with Jennifer to conduct stakeholder analysis. You would like to create a RACI chart to help with the roles of the people involved in the stakeholder analysis process. Jennifer is not familiar with this chart and asks what does RACI mean.

Which one of the following best describes the RACI chart in the conduct stakeholder analysis process?

A.

It's a matrix that uses the Responsible, Accountable, Consult, and Inform tasks as part of the stakeholder analysis process.

B.

It's a role and responsibility chart that identifies when stakeholders are needed in the business analyst duties.

C.

It's a matrix that uses Role, Action, Consult, and Inform as part of the conduct stakeholder analysis process.

D.

It's a rule that the business analyst can use to identify all of the needed stakeholders: roles, actions, communications, and interest.

Full Access
Question # 16

You are preparing a business case for your organization to determine the justification of the costs of the solution in relation to benefits the solutions will bring the organization. You need four inputs to complete this process.

Which one of the following is not an input that will help you write the business case?

A.

Feasibility study

B.

Stakeholder concerns

C.

Assumptions and constraints

D.

Business need

Full Access
Question # 17

You are creating a model for your requirements.

Which model type categorizes and describes the people who directly interact with a solution?

A.

Rules

B.

User classes, profiles, or roles

C.

Concepts and relationships

D.

Events

Full Access
Question # 18

All of the following stakeholders participate in the prioritization of requirements except for which one?

A.

Implementation subject matter expert

B.

Project team

C.

Domain subject matter expert

D.

Project manager

Full Access
Question # 19

Your organization completes software development for other companies as its core business. Management would like to streamline the requirements gathering processes as many of the projects your company do are similar in nature.

What approach could you as a business analyst do to help streamline the requirements gathering process for your organization?

A.

Implement a requirements re-use repository

B.

Implement project template

C.

Implement a requirements gathering form

D.

Implement scope solution models

Full Access
Question # 20

You are the business analyst for your organization and working with Tim to identify the assumptions within the business solution.

Which one of the following is an assumption?

A.

The vendor believes the hardware should arrive by December 1

B.

The software must be compatible with Windows Vista

C.

The software must cost less than $99 per license

D.

The hardware must cost less than $450 per unit.

Full Access
Question # 21

You are completing enterprise analysis. Management has asked you to create a document that will help them create a go/no go decision to invest and more forward with a proposed project.

What document does management want you to create?

A.

Feasibility study

B.

Project scope

C.

Solution scope

D.

Business case

Full Access
Question # 22

What technique used during the manage business analysis performance process can help identify the underlying causes of failures or difficulties in accomplishing business analysis work?

A.

Problem tracking

B.

Pareto charts

C.

Trend analysis

D.

Root cause analysis

Full Access
Question # 23

Which stakeholder must approve the business analysis approach to ensure that the business analysis approach is compatible with the other project activities?

A.

Project sponsor

B.

Project manager

C.

Project customer

D.

Change control board

Full Access
Question # 24

You are the business analyst for your organization. A customer has approached your organization and is requesting that your company create new software for them that will help them collect customer information.

In regard to enterprise analysis this business needs stems from which one of the following need generation approaches?

A.

Bottom-up

B.

External drivers

C.

Middle management

D.

Top-down

Full Access
Question # 25

Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

A.

Scope modeling

B.

Requirements workshops

C.

Scenario and uses cases and user stories

D.

Interviews

Full Access
Question # 26

You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements.

The following are the three categories of risk tolerance associated with the stakeholders except for which one?

A.

Mitigation

B.

Risk-aversion

C.

Risk-seeking

D.

Neutrality

Full Access
Question # 27

You are working with Terry on the conduct stakeholder analysis task as part of the business analysis duties in your company. Terry wants to know why it's so important to identify stakeholders so early in the business analysis duties.

Which one of the following statements best addresses the need to identify the stakeholders early on in the business analysis duties?

A.

It's important to identify the stakeholders so the business analyst knows who to report to.

B.

It's important to identify the stakeholders so the business analyst knows who to bill for the project.

C.

It's important to identify the stakeholder so the business analyst can help ensure the timely delivery of the requirements deliverables.

D.

It's important to identify the stakeholders so the stakeholders know who the business analyst is.

Full Access
Question # 28

Henry is the business analyst for the UUH Organization. Currently Henry is working on several work products as part of the requirements development process. He may need to share these work products with the stakeholders.

Which of the following is not an example of a work product?

A.

Requirements documentation

B.

Interview questions and notes

C.

Meeting agendas and minutes

D.

Presentation slides

Full Access
Question # 29

You are the business analyst for the TGH Organization and are determining if you should buy or build a solution for your company. You have determined that you can create the in-house solution for $78,000 with a monthly support cost of $8,765. A vendor can create the solution for $61,000 with a monthly support cost of $7,990.

How long will it take your company to break even if you choose the internal solution versus the vendor's solution?

A.

36 months

B.

12 months

C.

6 months

D.

22 months

Full Access
Question # 30

Which one of the following terms is not a business analysis planning and monitoring approach?

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Full Access
Question # 31

A business analyst (BA) has recently completed a comprehensive stakeholder analysis. Next the BA would like to consider ways in which to ensure that the stakeholders remain engaged throughout the change strategy. Some of the considerations include timing and frequency, location, available tools, delivery methods and the stakeholders' preferences. In which of the following plans would the BA document these considerations?

A.

Stakeholder Collaboration Plan

B.

Business Analyse Plan

C.

Stakeholder Analysis Plan

D.

Communications Management Plan

Full Access
Question # 32

After having created several prototypes of a new. web-based application, a business analyst (BA) would like to meet with the organization's stakeholders to elicit their perception ideas, and attitudes about the prototypes Which of the following techniques should the SA use?

A.

Decision Analysis

B.

Prioritization

C.

Brainstorming

D.

focus Groups

Full Access
Question # 33

Before investing further in the project, a customer and the key stakeholders of the project want to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?

A.

interface Analysis

B.

Reverse Engineering

C.

Observation

D.

Prototyping

Full Access
Question # 34

The stakeholder of a new product that is in early adaptive development has requested a change to an approved feature. How should the business analyst (BA) handle this change?

A.

Change the business analysis approach to predictive

B.

Obtain formal approval through change request process

C.

Include The requirement in the next Iteration

D.

Add the feature to the product backlog for future prioritization

Full Access
Question # 35

A business analyst (BA) on a project is in the process of validating requirements and finds that there is a high degree of uncertainty related 10 one of the assumptions being true. The BA adds the assumption to the risk register and performs a fun risk analysis to handle this situation. What type of strategy is in place if the organization is risk-averse?

A.

Acceptance

B.

Transfer

C.

Avoidance

D.

Mitigation

Full Access
Question # 36

When determining the success criteria for an initiative a business analyst (BA) engages end users in order to understand what they would define is an effective solution. What two types of data will the end men need to perform the evaluation?

A.

Assessment and performance

B.

impact and dependencies

C.

Quantitative and qualitative

D.

Risk and value

Full Access
Question # 37

The business analyst (BA) works in a global company and the majority of stakeholders are located in different countries The BA already explained the core requirements during the initial meetings. However due to the time zone differences it has been cumbersome to organize further meetings. What method should the BA use so the stakeholders can review the document before final approval?

A.

Group collaboration

B.

Brainstorming

C.

E-mail

D.

Collaborative games

Full Access
Question # 38

A business analyst (BA) is assessing tie different solution proposals. What type of financial calculation would the BA use to determine which solution is worth investing in based on its breakeven point?

A.

Discount rate

B.

Net present value

C.

Return on investment

D.

Internal rate of return

Full Access
Question # 39

In a risk assessment exercise of a software implementation program, the business analyst (BA) has successfully computed the probability of occurrence (POC) and the cost of impact for each of the identified risks as follows:

CBAP question answer

Which of the following will have the highest negative impact to value?

A.

Natural disasters

B.

Power surges

C.

Human errors

D.

System security

Full Access
Question # 40

Before investing further in the project, a customer and the stakeholder of the project wants to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?

A.

Interface Analysis

B.

Prototyping

C.

Reverse gineering

D.

Observation

Full Access
Question # 41

A business analyst (BA) is eliciting requirements to automate existing manual processes for fulfilling end users service requests. There is pressure from management to automate the process quickly using a commercial off-the-shelf (COTS) tool. The COTS solution has various modules including one for service request automation that has yet to be implemented in the organization. What e the BA's first step?

A.

Perform a gap analysis to understand missing capabilities

B.

Implement the COTS tool's modules

C.

Modify the COTS tool to fit the existing process

D.

Create a change strategy

Full Access
Question # 42

A customer has provided a business analyst (BA) with many business requirements and some have inter-dependencies with other requirements. To ensure the requirements are delivered according to customer expectations which requirements attribute should the BA consider including in the project requirements document?

A.

Unique identifier

B.

Priority

C.

Constraints

D.

Acceptance criteria

Full Access
Question # 43

Following a recent, successful deployment a business analyst (BA) has noticed that several of the requirements are candidates for reuse in multiple, upcoming change initiatives. Which type of requirement is a potential candidate for re-use?

A.

Transition requirements

B.

Stakeholder requirements

C.

Business requirements

D.

Non-Functional requirements

Full Access
Question # 44

During a retrospective, the project team agrees the way they organized the user stories during the first sprint could be improved. The business analyst (BA) plans to make the stones more accessible going forward. Which of the following will the BA update?

A.

Business analysis performance assessment

B.

Information management approach

C.

Organizational performance standards

D.

Project lessons learned register

Full Access
Question # 45

CBAP question answer

The table illustrate the statement of cash flower for a courier company for the last fiscal year:

Due to aggressive market competition the management of the company performed a strategy review and based on their0-findings and the current market conditions, they came up with strategic and tactical changes in order to keep a competitive market position.

In order to strength customer retention strategies through a new competitive advantage, the company is considering implementing a live parcel tracking system. The added value will be that the customers may determine the exact location on of the parcel whether it is in a warehouse, crossing the ocean through an overseas the exact location of th parcel whether it is in a warehouse, crossing the ocean through an overseas the ship, or travelling in a delivery truck at any time. The system tracks the location of the parcel by tracking the vehicle in which it is contained. However, for a group of old delivery trucks, it was noticed that the engine sound and vibration disturbed the tracking signal and caused of management would like to sell these vehicles and replace them with newer ones, the Chief Financial Officer (CFO) was strongly against that approach. The CFO argoad that instead of hanging tracking devices on the trucks body they can have the truck drivers manually send the truck send the truck location from a hand held mobile device every 20 minutes.

The CFO's resistance to replacing the older vehicles represents which type of cost?

A.

Maintenance

B.

Operating

C.

Opportunity

D.

Sunk

Full Access
Question # 46

A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.

There are eight stakeholders involved in this initiative. There are local to where the claim system is managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.

System a processes 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However, it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.

System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.

Both systems have some of the desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.

Below is the estimated cost for each feature in priority order.

CBAP question answer

During elicitation the BA must understand the non-functional requirements. What nonfunctional requirement does System B support over System A?

A.

Usability

B.

Compatibility

C.

Scalability

D.

Compliance

Full Access
Question # 47

A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.

There are eight stakeholders involved in this initiative. There are local to where the claim system is managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.

System a process 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However, it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.

System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.

Both systems have some of the desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.

Below is the estimated cost for each feature in priority order.

CBAP question answer

If the budget for the initiative was firm, what is a feasible solution to make sure the project stays within budget?

A.

Buy the new system with only the first 8 features.

B.

Upgrade system A with the first 8 features

C.

Upgrade system B with the first B features

D.

Buy the new system with only the first 5 features

Full Access
Question # 48

A business analyst (BA) finds that the proposed solution has features used by a small group of stakeholders for business scenarios which may occur up to three times a year Out require a high effort to implement. What should the BA recommend in this cast?

A.

Change the related business process

B.

Remove the requirement

C.

Assign it a lower priority for future release

D.

Deliver as part of the initial release

Full Access
Question # 49

A business analyst (BA) conducts a process analysis on the business analysis practices that were used on the previous major implementation. From this the BA identifies and documents that there are three improvement areas which would make the business analysis process more efficient In which business analysis artifact does the BA document these measures of improvement for the next piece of analysis work?

A.

Skills assessment

B.

Performance assessment

C.

Engagement approach

D.

Governance approach

Full Access
Question # 50

A business analyst (BA) is preparing for observation. A passive approach has been selected for establishing performance metrics. What should be identic for the next step?

A.

Performance measures

B.

Dependencies

C.

Participants

D.

Communication channels

Full Access
Question # 51

Several commercial-off-the-shelf (COTS) software packages exist that would enable the business analyst (BA) to meet the needs of the business. For the potential deign options, the Ba included one of the COTS packages as a solution approach What kind of solution approach is this?

A.

Outsource

B.

Exploit

C.

Create

D.

Purchase

Full Access
Question # 52

A company is about to embark upon a large organizational change initiative that involves restructuring its service offerings. A senior business analyst (BA) is assigned the work of establishing performance measures for the business analysis work to be performed by the 6A ream. Which of the following performance measures is appropriate to assess the value delivered by the work products against the cost time, and resource investments expended to create them?

A.

Strategy

B.

Effectiveness

C.

Significance

D.

Knowledge

Full Access
Question # 53

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I. Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1. The company's mobile application platform must support real time integrate with the following third party systems:

A GPS System

B. Postal Code Validation

What is the appropriate model type to assist the stakeholders in testing the performance and visual aspects of requirements 3 through 11?

A.

Process Model

B.

Concept Model

C.

Usability Prototype

D.

Functional Prototype

Full Access
Question # 54

A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.

There are eight stakeholders involved in this initiative. There are local to where the claim system are managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.

System a process 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However, it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.

System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.

Both systems have some of the desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.

Below is the estimated cost for each feature in priority order.

CBAP question answer

If System A is unanimously selected to be the system for upgrade but the technical lead says that System A will have to be taken offline for 3 months, what kind of strategy should the project team develop while system A is offline?

A.

Organizational

B.

Stakeholder

C.

Change

D.

Competitive

Full Access
Question # 55

A utility company found mat its current billing system charges customers 'or tie r usage, but does so incorrectly when the system estimates reads on meters rather than performs actual reads. Company stakeholders would i*e to improve this aspect of the system but are hesitant to make changes because they are otherwise pleased with the system A business analyst (BA) has completed a current state diagram and would like to start discussions on what the future state may look like. What information can the BA determine by having a current slate diagram?

A.

The needs for the future state solution

B.

The cost/benefit measures for the new system

C.

The strengths and weaknesses of the current system

D.

The change management plan for implementation

Full Access
Question # 56

A business analyst (BA) is tasked with developing a business analysis plan and must decide the best approach to use. Which of the following factors would drive the decision towards an adaptive approach?

A.

Engaging stakeholders presents significant challenges.

B.

The risk of an incorrect implementation is unacceptably high.

C.

Requirements can effectively be defined ahead of implementation.

D.

The organization's tolerance for uncertainty is high.

Full Access
Question # 57

A corporation is experiencing poor financial performance and needs to change many aspects of its business strategy in coder to become solvent again. A business analyst (BA) is conducting a feasibility analysis and analyzing resources required. The BA has identified the existing resources, the resources that need to be increased, and the required additional capabilities. What is the other dimension this analysis should indicate?

A.

The new resources to be developed

B.

The new financial performance metrics

C.

The enterprise readiness agreement

D.

The timeline for instituting the change

Full Access
Question # 58

A service provider has seen significant erosion of its profit margin so engages an external consultancy firm to assess its business operations and recommend options to improve profitability. What is the first step that the business analyst (BA) will perform as part of this engagement?

A.

Perform a brainstorming session to determine the desired profit margins for the future state of operations

B.

Organize a requirements elicitation meeting to determine the desired increase in the profit margin

C.

Conduct activities to understand the reasons behind the erosion of profitability in the current state

D.

Hold a strategy session to understand how best to achieve increased profitability

Full Access
Question # 59

Before the start of a large, cross functional change effort, the team of Business analysts (BAs) assigned decided they need something to help them ensure requirements collectively support one another and do not conflict. What option would provide the consistency they are looking for?

A.

Process modeling

B.

Functional decomposition

C.

plate Architecture

D.

Checklist

Full Access
Question # 60

A business analyst (BA) is working on improving solution performance and increasing value. The BA discovers that a set of interfaces and activities do not contribute to the final product either directly or indirectly What should the BA recommend?

A.

Provide a single solution for stakeholders thus reducing the cost of implementation

B.

Propose an organizational change to automate the work people perform

C.

Remove or minimize interfaces and activities that do not provide value to the final product

D.

Retire the current solution as it is not fulfilling the need for which it was created

Full Access
Question # 61

You are the business analyst for your organization. You are currently writing the business goals and objectives as part of the elements for the define business process.

Which one of the following statements best describes the business goals and objectives element?

A.

They describe the processes the solution will need to improve for the project to be successful.

B.

They describe all of the positive benefits in ratio to the risk and costs of the project.

C.

They describe all of the required work the project will need to complete in order to reach its objectives.

D.

They describe the ends that the organization is seeking to achieve.

Full Access
Question # 62

You are preparing the business case for a proposed solution in your organization. You need to identify several components for the business case including an assessment of the risks the solution may contain.

Which one of the following is the best definition of a risk as it pertains to the business case?

A.

Risk is an uncertain event or condition that may have both positive and negative affects on the solution.

B.

Risk is an uncertain event that can cause the organization to lose more monies than it invests in the solution.

C.

Risk is a potential event that can cause the solution to fail.

D.

Risks are threats to the organization's success.

Full Access
Question # 63

Which one of the following is the most accurate definition of the solution scope?

A.

Defines what must be delivered in order to meet the business need.

B.

Determines the things that are believed to be true in the solution but they have not yet been proven to be true.

C.

Determines if an organization can justify the investment required to deliver the proposed solution.

D.

Defines the business need, identified key stakeholders, describes the positive impact of the solution.

Full Access
Question # 64

Yolanda is the web designer for your company and you are the business analyst. You are working with Yolanda on a new website that your company will host. You'd like for her to create a mock-up of the website without spending much time on the actual workings behind the web interface. You'd like for her to show the customer how the website will look, some idea of the functionality of the website, and some basic graphics and colors so the customer can see the direction of the project.

What type of prototype are you asking Yolanda to create?

A.

Mock-up prototype

B.

Vertical prototype

C.

Storyboard prototype

D.

Horizontal prototype

Full Access
Question # 65

Martha is observing Sarah complete several complex steps as part of her business analysis requirements elicitation process. In this instance Martha working alongside Sarah is actually helping Sarah complete the work so that Martha can understand all of the steps Sarah must complete.

What type of requirements elicitation technique is Martha using?

A.

Progressive elaboration

B.

Shadowing

C.

Cross training requirements elicitation

D.

Active observation

Full Access
Question # 66

Which of the following is a procurement document?

A.

Project Work Breakdown Structure

B.

Project charter

C.

Vision document

D.

Invitation for bid

Full Access
Question # 67

Management would like you to front-load the requirements with the most risk requirements.

Why would management prefer the risky requirements first in the prioritization?

A.

So if the risk comes true the project will fail will little investment in the work.

B.

So if the risk comes true then the project manager can mitigate the risk event.

C.

So if the risk comes true they'll receive the reward as soon as possible.

D.

So if the risk comes true then there's ample time to correct the problem.

Full Access
Question # 68

You are the business analyst for the NHQ Organization. Management has asked that you examine the workflow and internal processes for order fulfillment. Specifically, they'd like you to complete an in-depth analysis and documentation of the business problems and opportunities that may be exist for the organization.

What business analysis knowledge area does this activity map to?

A.

Requirements elicitation

B.

Solution assessment and validation

C.

Enterprise analysis

D.

Requirements management and communication

Full Access
Question # 69

Which of the following is the best definition of the business rules analysis?

A.

To define the people that govern decisions in and organization and that define, constrain, or enable organizational policies.

B.

To define the job functions, roles and responsibilities, and the designation of power among the project stakeholders.

C.

To define the rules that govern decisions in and organization and that define, constrain, or enable organizational policies.

D.

To define the historical information that is available for the business analyst to rely on for his research.

Full Access
Question # 70

You are the business analyst for your organization. You have identified the costs and level of effort needed for

each of the solution components. Management has asked that you also assess the most effective tradeoffs between delivery options. You consider the available resources and the constraints on the solution to determine if an additional investment is justified to realize a higher value for the solution.

What other consideration could you include in your assessment of the solution?

A.

Historical information

B.

Dependencies between requirements

C.

Experience of the implementation team

D.

Enterprise environmental factors

Full Access
Question # 71

Gina has been asked to provide decision analysis for her solution scope.

Which one of the following best describes the decision analysis technique?

A.

Assessed to support benefit management, measurement, and reporting.

B.

Used to assess potential risks that may impact the solution and the cost and benefits associated with it.

C.

Forecasts the size of the investment required to deploy and operate the proposed solution.

D.

Cost-benefit analysis compares the cost of implementing a solution against the benefits gained. Financial analysis includes the use of financial models that estimate the market value of an organizational asset.

Full Access
Question # 72

You have identified several stakeholders that you believe are kinesthetic learners.

Which statement best describes the kinesthetic learning approach?

A.

The learners learn best by reading and pondering.

B.

The learners learn best be experiencing the topic.

C.

The learners learn best by seeing the topic in a model or through storyboards.

D.

The learners are not interested in the topic unless they can immediately apply it to their lives or jobs.

Full Access
Question # 73

Which of the following is a narrative description of the work required for the project?

A.

Contract work breakdown structure (CWBS)

B.

Work breakdown structure (WBS)

C.

Contract statement of work (CSOW)

D.

Statement of work (SOW)

Full Access
Question # 74

The RGQ Organization utilizes a change log.

What is a change log?

A.

It is a document that records all change requests for the project.

B.

It is a document that tracks all unauthorized changes to the project solution.

C.

It is a document that tracks all characteristics and status of changes that have been received.

D.

It is a document that tracks the changes that have been received, including their implementation to the project solution.

Full Access
Question # 75

You are creating a model that shows how data moves through a system. Each function that modifies the data in any manner is identified, decomposed to smaller levels, and the system is completely described from start to storage.

What type of a modeling technique are you using in this scenario?

A.

Functional decomposition

B.

Data flow diagramming

C.

Work decomposition

D.

Organization modeling

Full Access
Question # 76

The requirements elicitation process requires that the business analyst and team prepare for the requirements elicitation activities. There are three specific inputs that the business analyst will need in preparing for the requirements elicitation.

Which of the following is NOT one of the three inputs the business analyst will use as he prepares for requirements elicitation?

A.

Solution scope

B.

Change request

C.

Business need

D.

Stakeholder list

Full Access
Question # 77

Which of the following models demonstrates the attributes, operations, and relationship to entities within the solution?

A.

Entity Relationship

B.

Data dictionary

C.

Class model

D.

CRUD matrix

Full Access
Question # 78

You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives.

Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

A.

Structured walkthrough

B.

Decision analysis

C.

Cause-and-effect analysis

D.

Process modeling

Full Access
Question # 79

It's often impossible or difficult to prove that the implementation of a solution will change the current state of an organization to the desired future state. The business analyst must document the characteristics and risk of

the implementation of a solution in case the belief that the solution will achieve the desired results will prove invalid.

What is the belief that the solution will create the desired effect for the organization called?

A.

Project

B.

Risk

C.

Assumption

D.

Model

Full Access
Question # 80

You are the business analyst for your organization and are training Tracy on business analysis duties. You are explaining to Tracy how it's important for a business analyst to generate new ideas to approaching problems, solving problems, and to generate alternative solutions. You stress that it's important for the business analyst to generate new ideas and innovative concepts.

What type of analytical thinking are you describing for Tracy?

A.

Lateral thinking

B.

Brainstorming

C.

Creative thinking

D.

Decision making

Full Access
Question # 81

You are the business analyst for your organization and are working on prioritizing requirements.

What plan should guide you through this process?

A.

Risk management plan

B.

Project management plan

C.

Requirements management plan

D.

Scope management plan

Full Access
Question # 82

What type of interview is the most common as part of requirements elicitation?

A.

Many-to-one

B.

Many-to-many

C.

One-to-one

D.

One-to-many

Full Access
Question # 83

Enterprise analysis provides many things for an organization.

All of the following are tasks included in enterprise analysis except for which one?

A.

Determine solution approach

B.

Define business need

C.

Assess capability gaps

D.

Solution performance assessment

Full Access
Question # 84

Which of the following inputs of Monitor and Control Risks acquires information from performance measurements and evaluates it to provide variance analysis and forecasting?

A.

Risk register

B.

Work performance information

C.

Performance report

D.

Project management plan

Full Access
Question # 85

Which of the following documents is described in the statement below?

"It is a type of procurement document used to request proposals from prospective sellers of products or services."

A.

Request for quote

B.

Request for information

C.

Request for bid

D.

Request for proposal

Full Access
Question # 86

Holly is the business analyst for her organization. Holly encourages teamwork and open communications among the business analysis team and the stakeholders. She wants stakeholders to drop by her office and freely discuss the requirements, the solution scope, and other concerns about the solution she's working on. Holly definitely prefers informal communications.

What is the danger Holly may experience with informal communications?

A.

There is no danger; informal communications is a preferred business analysis technique.

B.

The stakeholders may address the business analysis team and the project team directly rather than communicate through Holly.

C.

Stakeholders may miss information and the requirements could become ambiguous.

D.

The stakeholders may not know who's in charge of the solution.

Full Access
Question # 87

Management comes to you and asks you to complete some specifications and models about the current state of the organization. Management wants you to complete this business analysis activity as soon as possible and report back to them with your findings.

What is the primary purpose of the specify and model requirements process?

A.

To analyze the processes of an organization to determine what processes can be improved, removed, or added.

B.

To analyze the utility function within the organization to determine how risk tolerance may allow for new opportunities.

C.

To analyze the roles and responsibilities of users within the organization to determine how the processes may be improved.

D.

To analyze the functioning of an organization and to provide an insight into opportunities for improvement.

Full Access
Question # 88

You are the business analyst for your organization. Your current project is using a plan-driven approach for the requirements, business analysis, and monitoring.

Which one of the following statements best describes the plan-driven approach to business analysis planning and monitoring?

A.

Plan-driven approaches determine how priorities will be diagnosed for the project solution.

B.

Plan-driven approaches encourage changes that prevent errors and omissions.

C.

Plan-driven approaches typically have meetings daily to discuss the business analysis requirements process.

D.

Plan-driven approaches typically call for a significant amount of formality and detail.

Full Access
Question # 89

Which of the following phases is the first step towards creating a business continuity plan?

A.

Business Continuity Plan Development

B.

Scope and Plan Initiation

C.

Business Impact Assessment

D.

Plan Approval and Implementation

Full Access
Question # 90

You are working with Tom, a key stakeholder, in your business analysis duties. Tom is asking you about the desired outcome for current business opportunity.

Which one of the following is NOT an example of a desired outcome?

A.

Implement new machinery to complete the work processes faster

B.

Increase sales

C.

Reduce costs

D.

Reduce time to deliver a product or service

Full Access
Question # 91

Which of the following stages of a project defines the number of risks and opportunities, including intense planning and anticipation of risk events?

A.

Planning

B.

Executing

C.

Initiation

D.

Closing

Full Access
Question # 92

Which of the following types of charts shows which resources are needed in the project and allows you to group the resources by project phase or other attributes?

A.

Pareto chart

B.

Organizational Breakdown Structure

C.

Gantt chart

D.

Resource Breakdown Structure

Full Access
Question # 93

A big construction company has grown into a group of 17 companies spread across the country. The rationale behind forming the group was to become more competitive in bidding for federal and regional government contracts. Another reason was to increase consolidated profitability by lowering the cost of materials and using combined assets more efficiently. Disjointed technological capabilities of the individual companies impede gathering the data needed to make decisions on both handling materials and allocating the resources.

What improvement opportunity does this represent?

A.

Create a business model canvas to outline business needs

B.

Deploy a new system across the companies

C.

Enhance access to the relevant information

D.

Develop a repository of information from each company

Full Access
Question # 94

Which of the following is the process of defining and analyzing the dangers to individuals, businesses, and government agencies posed by potential natural and human-caused adverse events?

A.

Risk analysis

B.

Risk identification

C.

Risk management

D.

Risk communication

Full Access
Question # 95

Which of the following is derived from a schedule model to meet the project execution plan and achieve management approval for use as a baseline?

A.

Updating

B.

Impacts

C.

Baseline schedule

D.

Dumping

Full Access
Question # 96

Which of the following can be used in root cause analysis?

A.

Pareto chart

B.

Data-flow diagram

C.

Gantt chart

D.

Fishbone diagram

Full Access
Question # 97

Which of the following tasks cannot start until other tasks are completed?

A.

Analysis task

B.

Dependent task

C.

Predecessor task

D.

Independent task

Full Access
Question # 98

The, an output of the define scope process, does document the process and criteria for accepting completed products.

A.

Statement of Work

B.

Contract

C.

Project scope statement

D.

Project management plan

Full Access
Question # 99

Which of the following techniques is used to divide a project into controllable parts?

A.

Gantt Chart

B.

Pareto Chart

C.

WBS

D.

CPM

Full Access
Question # 100

Which of the following defines the deliverable the customer is expecting?

A.

Project charter

B.

Procurement management plan

C.

Product scope statement

D.

Project network diagram

Full Access
Question # 101

Which of the following represents the duration of activities against a calendar?

A.

Scatter chart

B.

Gantt chart

C.

Pie chart

D.

Pareto chart

Full Access
Question # 102

What portion of the communications model could be defined as the translator?

A.

Receiver

B.

Medium

C.

Translator

D.

Sender

Full Access
Question # 103

A business analyst (BA) is working on a stakeholder collaboration plan. The main goal is to select the approaches that work best to meet the needs of external and internal stakeholders.

Which aspects should be taken into account?

A.

Collaboration skills of BA

B.

Solution design

C.

Timing and frequency of collaboration

D.

Business governance plan

Full Access
Question # 104

A business analyst (BA) in a large financial institution, responsible for the management of requirements, has completed all the activities related to tracing requirements and is now pursuing to maintain them. The BA has identified a large number of requirements which have long term reuse and is now looking for guidance to manage these requirements.

Which of the following will indicate how requirements will be managed for reuse?

A.

Legal Regulatory Information

B.

Architectural Repositories

C.

Information Management Approach

D.

Business Rules Analysis

Full Access
Question # 105

When does the lessons learned document is updated?

A.

At planning phase.

B.

At execution phase.

C.

At closing phase.

D.

Throughout the project lifecycle.

Full Access
Question # 106

While defining what necessary conditions are required to achieve the business need for a highly regulated government client, a business analyst (BA) discovers that some legacy policies will either constrain or are insufficient to achieve value desired by the future state.

How should the BA proceed?

A.

Modify the solution to comply with the policies

B.

Identify an assumption about future state value

C.

Model two future states, one with and another without these policies

D.

Obtain approval to change the policies

Full Access
Question # 107

Which of the following diagrams is known as Ishikawa diagram?

A.

Activity

B.

Data-flow

C.

Cost-Benefit

D.

Cause-and Effect

Full Access
Question # 108

While validating requirements for a software implementation project, the business analyst (BA) needs to identify scenarios that would alter the benefit delivered by a requirement.

Which of the following techniques should the BA use to identify such scenarios?

A.

Risk Analysis and Management

B.

Metrics and Key Performance Indicators

C.

Data Modeling

D.

Document Analysis

Full Access
Question # 109

Which of the following is described in the statement below?

"It shows the history and pattern of variation. It is a line graph that shows data points plotted in the order in which they occur. They show trends in a process over time, variation over time, or declines or improvements in a process over time. Trend analysis is performed using them."

A.

Cause and effect diagram

B.

Histogram

C.

Run chart

D.

Pareto chart

Full Access
Question # 110

Which of the following charts is described in the statement below?

"It shows the causes of a certain event. A common use of this diagram is to identify potential factors causing an overall effect. It helps identify causal factors and contributing causes."

A.

Ishikawa

B.

Flowchart

C.

Process configuration chart

D.

Control chart

Full Access
Question # 111

A business analyst (BA) is facilitating a meeting between process owners to capture the business rules for a workflow solution. One of the attendees expresses a strong opinion that the solution will not deliver the expected value.

How will the BA ensure the process owner remains engaged and will support the change?

A.

Update the requirements

B.

Record the feedback and continue

C.

Review the future state

D.

Change the governance approach

Full Access
Question # 112

Which of the following terms is used to describe a major deliverable or key even in the project used to measure project progress?

A.

Project life cycle

B.

Phase

C.

Achievement

D.

Milestone

Full Access
Question # 113

The performance of the business analysis team has been reviewed by management to determine areas for improvement. The manager would like to help the business analysts (BAs) develop their skills and address the corrective actions.

What is a technique that may help achieve this goal?

A.

Lessons learned

B.

Team restructure

C.

Weekly meetings

D.

Team building

Full Access
Question # 114

The business analyst (BA) has been tasked with assessing and recommending the best solution that fits an organization's need for a new third-party sales tool.

What technique would be used for identifying suitable options?

A.

Balanced scorecard

B.

Decision analysis

C.

Vendor assessment

D.

Process analysis

Full Access
Question # 115

The business sponsor of a project to automate a high risk, high profile process has expressed concerns that some activities people perform will be missed. The business analyst (BA) has already created a process flow with associated user stories.

Which of the following actions will address the sponsor’s concerns?

A.

Record the concerns in the risk register

B.

Schedule a formal review with the stakeholders

C.

Demonstrate traceability to the business case

D.

Review the final approved elicitation results

Full Access
Question # 116

Which of the following processes measures the maturity level of the security program?

A.

Risk analysis

B.

Risk mitigation

C.

Risk assessment

D.

GAP analysis

Full Access
Question # 117

As a milestone is reached, the project is funded for enough capital to reach the next milestone. This approach is called.

A.

Step funding

B.

Phase funding

C.

Stakeholders funding

D.

Milestone funding

Full Access
Question # 118

In a requirements elicitation effort, the business analyst (BA) needs to define boundaries for business domains, categorize and create a hierarchy of items, and show data sources and their relationships for specific audiences.

Which of the following modeling formats should the BA use?

A.

Diagrams

B.

Graphics

C.

Matrices

D.

Prototype

Full Access
Question # 119

Which of the following is a visual decomposition of the project scope?

A.

Budgeted Cost of Work Scheduled (BCWS)

B.

Resource Breakdown Structure (RBS)

C.

product breakdown structure (PBS)

D.

Work Breakdown Structure (WBS)

Full Access
Question # 120

A large company has thousands of geographically dispersed employees and dozens of IT systems. Multiple business analysts (BAs) work in parallel on various requirements with different stakeholders. When considered in isolation, the requirements look meaningful and valuable to those who approved them. However, when it comes to implementation, some of the requirements appear to be contradicting each other. A lead BA recognizes that adding some traceability information would help uncover such conflicts early in the process.

To what should the BA trace the requirements?

A.

Stakeholder tasks

B.

Business needs

C.

Organizational functions

D.

Solution components

Full Access
Question # 121

A software development company is in the process of creating a new product for their customer base. It has been several years since such a project has been initiated and the organization has created a new team to own and develop the product. The project team will be evaluated by the successful adoption of the product, which will be developed over the next 12 months.

The team's business analyst (BA) has analyzed the current state in partnership with the product owner and has been meeting with senior management to identify the goals that need to be attained. A broad view of the business has been analyzed in order to have an understanding of how the company is currently providing value to its customer base.

After the BA completed the initial analysis, the information is reviewed with leadership. At this point in the project, what will the BA be presenting?

A.

Project timeline

B.

Project deliverables

C.

Resource staffing

D.

Expected benefits

Full Access
Question # 122

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I.Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II.Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III.Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1.The company's mobile application platform must support real time integration with the following third-party systems:

A ) GPS System

B ) Postal Code Validation

2.The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.

3.The map display shall highlight the boundary of the search area with a dotted yellow line.

4.The extent and shape of the search area shall be determined based on one of the following user choices:

A ) Postal code – Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.

B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.

5.Subscriber shall be able to select one of the options above and supply corresponding input.

6.System shall validate the user input and display appropriate error messages if invalid.

7.Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.

8.System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.

9.The list of service providers shall include the Name, Phone Number and Street Address.

10.If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.

11.The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.

Which primary subscriber business need is addressed with the enhancements?

A.

Inability of a service provider to locate other participating service providers and their fee information

B.

Inability of a plan subscriber to get directions to nearby participating service providers

C.

Inability of a plan subscriber to locate and access fee information for nearby participating service providers

D.

Inability of a service provider to be alerted of the location of new plan subscribers in their vicinity

Full Access
Question # 123

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I.Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II.Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III.Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1.The company's mobile application platform must support real time integration with the following third party systems:

A ) GPS System

B ) Postal Code Validation

2.The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.

3.The map display shall highlight the boundary of the search area with a dotted yellow line.

4.The extent and shape of the search area shall be determined based on one of the following user choices:

A ) Postal code – Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.

B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.

5.Subscriber shall be able to select one of the options above and supply corresponding input.

6.System shall validate the user input and display appropriate error messages if invalid.

7.Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.

8.System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.

9.The list of service providers shall include the Name, Phone Number and Street Address.

10.If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.

11.The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for

the covered services applicable to the subscriber's plan.

Which of the following relationship types correctly identifies the nature of the relationship between the 3 business capabilities and the 11 requirements?

A.

Derives

B.

Depends

C.

Validates

D.

Verifies

Full Access
Question # 124

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

Even after dozens of reviews, some stakeholders refuse to sign off on the requirements specification documents because of a few questionable requirements. This puts the projects at risk and creates tension between the participants. What should the lead BA do first?

A.

Escalate the problem to the executive management

B.

Set limits on duration of sign-offs and the number of reviews

C.

Track approvals al the level of individual requirements

D.

Offer the stakeholders incentives to sign off documents sooner

Full Access
Question # 125

A business analyst (BA) is reviewing the performance results from a recent change initiative. One of the results stated, "The planned schedule expected 50% of the project to be done at milestone 6. The schedule performance index (SPI) was .87. Three project team members worked overtime to ensure that the actual schedule would align with the planned schedule."

This is an example of what type of action?

A.

Engagement

B.

Preventive

C.

Corrective

D.

Improvement

Full Access
Question # 126

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

CBAP question answer

The risk associated with Requirement ID F-P0001 is HIGH. The BA has gone back to the Crew Chief to determine why this requirement's risk is HIGH. The Crew Chief stated that it was based on an assumption.

Which of the following assumptions would make this requirement's risk high?

A.

The users will require specialized training.

B.

The web-based interface will be complex.

C.

The system will be inaccessible in remote locations.

D.

The cost of the solution outweighs its benefit.

Full Access
Question # 127

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process. A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a $500,000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper-based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process stopped'.

Which of the following is included in performing a stakeholder analysis?

A.

Compare the expertise of the Director of Human Resources to other stakeholders

B.

Recommend excluding the Director of Human Resources as a stakeholder

C.

Develop a risk plan to anticipate negative behavior from the Director of Human Resources

D.

Implement all of the Director of Human Resources suggestions to relieve tension

Full Access
Question # 128

A business analyst (BA) has been assigned to manage the ongoing stakeholder collaboration after completing a project. The BA needs to understand the stakeholders' level of satisfaction and wants to offer stakeholders an opportunity to help improve the working relationships based on this information.

Which technique should the BA use?

A.

Risk analysis and management

B.

Brainstorming

C.

Collaborative games

D.

Lessons learned

Full Access
Question # 129

After the new report "Customer Sales by Date" was deployed last week, the sales team is now unable to generate the previously existing report "Consolidated Sales by Customer, " which is causing customer dissatisfaction.

What could the business analyst (BA) have assessed to prevent this situation?

A.

Current state and stakeholder needs

B.

Solution assessment results

C.

Strengths, weaknesses, and threats

D.

Balanced scorecard

Full Access
Question # 130

A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected.

Which technique will be used?

A.

Focus Group

B.

Brainstorming

C.

Survey

D.

Group interview

Full Access
Question # 131

A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.

The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.

The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.

The sites Features were as follows:

* Improvements to the search engine to all customers to search for articles, tools and services on the site

* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility.

* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.

* A profile section allowing for Customer Name, Address and contact Phone number.

Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.

Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.

The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.

What type of recommendation has the BA made to the business sponsor?

A.

Perform organizational change

B.

Identify additional capabilities

C.

Reduce complexity of interfaces

D.

Retire the solution

Full Access
Question # 132

A company with a big information technology (lT) department has hired a lead business analyst (BA) to enhance its business analysis practices The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders including project managers, are blaming long cycles of analysis for the delays The business analysts, in turn feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

What should the lead BA implement to identify areas of improvement?

A.

A BA time tracking system

B.

Templates for BAs lo use

C.

Workload plans of the BA

D.

Key performance measures

Full Access
Question # 133

A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.

The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.

A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

CBAP question answer

Preparing a customer order for loading takes about one hour. Upon the BA's observation, only 30% of trips have their orders available for loading when a truck arrives. This causes a waste of both the truck's and the driver's time.

What should the BA recommend to eliminate such waste?

A.

Elicit requirements for a system to coordinate in advance order processing activities with all trips

B.

Begin assembling orders for the next trip immediately following the truck's departure

C.

Hire more warehouse staff (workers) so that order assembly is done faster and less waiting occurs

D.

Ask the drivers to call the operations team member if they are going to be late

Full Access
Question # 134

A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.

In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief

Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.

A business analyst (BA) has been brought in to help with planning the project and gathering requirements. What tool will help the BA understand the changes needed to keep the majority of the stores open?

A.

Capability Model

B.

Business capability analysis

C.

Transition State Diagram

D.

Stakeholder Matrix

Full Access
Question # 135

A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations.

What actions does the BA need to take?

A.

Develop new performance metrics

B.

Complete a decision analysis

C.

Perform a root cause analysis

D.

Re-analyze the current performance metrics

Full Access
Question # 136

An organization has a procedure for receiving requests from its customers: investigating each and then replying with an answer. The general manager asks a business analyst (BA) to identify ways to improve the current practice because it takes too long for the requests to be answered.

Which of the following techniques will the BA use to review the tasks?

A.

Data Modeling

B.

Business Case

C.

Item Tracking

D.

Process Analysis

Full Access
Question # 137

A team of business analysts (BAs) were assigned to review an enhancement request that would involve changes in a stockroom and the inventory of products. The changes will impact several groups of people and the amount of savings is in excess of $1 million dollars. The recommended process improvement will be presented to management for approval.

What should the team do first?

A.

Create a business case

B.

Produce an organizational model

C.

Define the change strategy

D.

Validate the cost savings

Full Access
Question # 138

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I.Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II.Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III.Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1.The company's mobile application platform must support real time integration with the following third party systems:

A ) GPS System

B ) Postal Code Validation

2.The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.

3.The map display shall highlight the boundary of the search area with a dotted yellow line.

4.The extent and shape of the search area shall be determined based on one of the following user choices:

A ) Postal code – Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.

B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.

5.Subscriber shall be able to select one of the options above and supply corresponding input.

6.System shall validate the user input and display appropriate error messages if invalid.

7.Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.

8.System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.

9.The list of service providers shall include the Name, Phone Number and Street Address.

10.If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.

11.The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.

What is the appropriate diagram type to describe the association between the subscriber, the medical plan and the participating service providers?

A.

Data Model

B.

Data Dictionary

C.

Use Case Diagram

D.

Data Flow

Full Access
Question # 139

An organization implements a solution to increase the efficiency of its internal processes. The business analyst (BA) felt that the success of the solution is tied to the organizational structure and confirmed that the solution conforms to the organizational hierarchy. After the solution rolled out, the solution was not widely adopted among stakeholders and some features were not being utilized.

Which aspect of the organizational structure did the BA fail to consider?

A.

Reporting needs

B.

Manager ratios

C.

Informal relationships

D.

Structural complexity

Full Access
Question # 140

A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".

The BA defined the following use cases:

•"Change system parameters"

•"Setup new supervisor"

•"Send mail notification"

•"Send SMS notification"

•"Send notification"

•"Pass a two-factor authentication"

The BA wants to create a Use Case diagram.

Which standard relationship should be defined between "Setup new supervisor" and "Send notification?

CBAP question answer

CBAP question answer

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 141

A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity- critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit’s continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years.

The project’s Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from

another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit.

The business unit’s Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit’s target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements.

With the team ready to consider design options, they are reviewing the following requirement: "Appropriate stakeholders shall be timely and reliably notified on incident-related events."

What quality criteria does this requirement fail to satisfy?

A.

Consistent

B.

Complete

C.

Atomic

D.

Understandable

Full Access
Question # 142

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process. A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software. During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a 1500.000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper-based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder The Director of Human Resources is still bitter about the last effort because the process stopped.

During a design review meeting to discuss the future state, all stakeholders are in agreement except the Director of Human Resources. Who makes the final decision?

A.

Those identified in the governance approach

B.

The BA

C.

The sponsor

D.

All stakeholders must be in complete agreement

Full Access
Question # 143

A business analyst (BA) is planning for an upcoming solution based on a signed contract with a client but has learned that one of the key subject matter experts is unavailable during the first half of the business analysis phase. The project has a tight timeline and firm deadline that is part of the contract. There are no substitutes for the key subject matter expert.

How should the BA proceed?

A.

Change the solution scope by removing the subject matter expert's component and obtain approval on the new scope

B.

Reduce the schedule to coincide with the subject matter expert's availability and reduce the formality for requirements

C.

Document the contract terms as a risk and adjust the contract costs to plan for the changes/rework

D.

Identify the missing stakeholder as a risk and recommend an adaptive approach for the analysis phase

Full Access
Question # 144

An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements.

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases; but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

What analysis approach must the BA use to determine changes required to address the training needs?

A.

Market

B.

Decision

C.

Root cause

D.

Future state

Full Access
Question # 145

An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content, in many instances, multiple teams are defining the same Functionalities while other functionalities are not being defined at all. leading to unclear understanding of business requirements

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases; but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

The BA learns that formal training programs are not often devised for teams as small and diverse as this team, but still believes it is a viable solution to the training need. What type of analysis would help the BA gain approval to proceed with creating this type of training program for this team?

A.

Process

B.

Cost Benefit

C.

Business Capabilities

D.

Decision

Full Access
Question # 146

A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.

The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.

A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

CBAP question answer

If the driver's average throughput is 0.6 tons/hour, how many hours per day would 15 drivers have to work to deliver 100 tons of merchandise?

A.

12

B.

9

C.

10

D.

11

Full Access
Question # 147

A business analyst (BA) is developing an approach for information management. The BA needs to identify and categorize which information is to be managed.

Which of the following techniques should the BA use to achieve this objective?

A.

Item Tracking

B.

Observation

C.

Prototyping

D.

Mind Mapping

Full Access
Question # 148

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

CBAP question answer

While verifying the requirements, the BA notices that Requirement ID NFO0003 does not meet the "unambiguous" or the "testable" characteristics of requirements quality. The BA plans to re-write the requirement.

Which of the following requirements is both unambiguous and testable?

A.

"The solution shall employ a blue background."

B.

"The solution shall employ a background color blue (HEX #0000FF)."

C.

"The solution shall employ a high-contrast between background and text."

D.

"The solution shall employ a background color that is viewable to a colored-blind user."

Full Access
Question # 149

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I.Ability to integrate online maps and global positioning system (GPS) technology with the mobile application in real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II.Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III.Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1.The company's mobile application platform must support real time integration with the following third party systems:

A ) GPS System

B ) Postal Code Validation

2.The service providers available for selection must participate in the subscriber's medical plan network as of the current system date.

3.The map display shall highlight the boundary of the search area with a dotted yellow line.

4.The extent and shape of the search area shall be determined based on one of the following user choices:

A ) Postal code – Subscriber location acquired from GPS shall be used to determine and populate the related postal code as the default postal code with options for the user to change the postal code.

B ) Radius for the search area around the subscriber's location, that will have default value of 5 miles. The radius can be changed by the subscriber with a maximum range of 50 miles.

5.Subscriber shall be able to select one of the options above and supply corresponding input.

6.System shall validate the user input and display appropriate error messages if invalid.

7.Based on the inputs and the plan of the subscriber, the system shall retrieve information for the participating service providers that are located within the designated search area.

8.System shall display a map including visual markers to indicate locations of the service providers in the top half of the device screen and a list of the same service providers in the bottom half of the device screen.

9.The list of service providers shall include the Name, Phone Number and Street Address.

10.If the subscriber specified the radius or retained the default postal code for the search area, the list shall additionally include the approximate driving distance in miles from the subscriber's last registered location and the list shall be sorted in the ascending order of the driving distance.

11.The subscriber shall be able to select a service provider either from the list or from the map and download a document that contains the name, contact telephone, email address, fax number and the fee schedule for the covered services applicable to the subscriber's plan.

Which of the following characteristics is violated by requirement 5?

A.

Feasible

B.

Concise

C.

Consistent

D.

Atomic

Full Access