Summer Special - 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: c4sdisc65

C_TS422_2023 PDF

$38.5

$109.99

3 Months Free Update

  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions

C_TS422_2023 PDF + Testing Engine

$61.6

$175.99

3 Months Free Update

  • Exam Name: SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing
  • Last Update: Jun 17, 2025
  • Questions and Answers: 80
  • Free Real Questions Demo
  • Recommended by Industry Experts
  • Best Economical Package
  • Immediate Access

C_TS422_2023 Engine

$46.2

$131.99

3 Months Free Update

  • Best Testing Engine
  • One Click installation
  • Recommended by Teachers
  • Easy to use
  • 3 Modes of Learning
  • State of Art Technology
  • 100% Real Questions included

C_TS422_2023 Practice Exam Questions with Answers SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Certification

Question # 6

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

A.

The quantity and value updates are the same.

B.

The same batch management level is used.

C.

The same base unit of measure is used.

D.

The same account category is used.

Full Access
Question # 7

Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question.

A.

Changing the delivery address in transportation management

B.

Changing the storage bin in warehouse management

C.

Changing the procurement type in the product master

D.

Changing the stock in inventory management

Full Access
Question # 8

You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

A.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.

Full Access
Question # 9

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch where-used list.

D.

Use batch derivation.

Full Access
Question # 10

You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

A.

The order lot size is NOT within the validity range of a production version.

B.

NO production lines are assigned to the production versions.

C.

All production versions for the material are locked.

D.

NO bills of material (BOMs) are assigned to the production versions.

Full Access
Question # 11

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling in the past. How can you parameterize this in the strategy profile?

A.

Specify a negative offset time.

B.

Specify a negative opening period.

C.

Specify a negative planning horizon.

D.

Specify a negative PP/DS horizon.

Full Access
Question # 12

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

A.

By capacity planning

B.

By order confirmation

C.

By order release

D.

By mass processing

Full Access
Question # 13

Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track and use this information in all areas of logistics?

A.

Process order management

B.

Engineering change management

C.

Quality management

D.

Batch management

Full Access
Question # 14

What information do you have to maintain to define the relationship between supply source and demand source in the Kanban process? Note: There are 2 correct answers to this question.

A.

Routing

B.

Work Center

C.

Replenishment strategy

D.

Production supply area

Full Access
Question # 15

Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Assign planned orders manually in the planning table.

B.

Run MRP with quota arrangement.

C.

Run MRP with automatic selection of production version.

D.

Run PP/DS heuristics for repetitive manufacturing.

Full Access
Question # 16

Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?

A.

Use a resource group.

B.

Use a planning group.

C.

Use a propagation range.

D.

Use a planning area.

Full Access
Question # 17

How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

A.

Digital signature

B.

Approved resources

C.

Recipe approval

D.

GMP-compliant flag

E.

Batch record

Full Access
Question # 18

What are some SAP-recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question.

A.

Establish an organizational structure, technical foundation, and transformation methodology for clean core.

B.

Integrate clean core practices in the end-to-end value process chain.

C.

Establish release management.

D.

Establish regular housekeeping tasks and procedures.

E.

Define roles and responsibilities as part of a process transformation office.

Full Access
Question # 19

How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.

A.

Use run schedule quantities for in-house production.

B.

Use stock transfer reservations for stock transfer.

C.

Use purchase orders for external procurement.

D.

Use quotations for internal and external procurement.

E.

Use purchasing costs for automated source prioritization.

Full Access
Question # 20

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Production by lot size (30)

D.

Planning at assembly level (70)

Full Access
Question # 21

You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question.

A.

The Relevant for Finite Scheduling indicator must be set.

B.

The scope of check must be defined in Customizing.

C.

A checking rule must be assigned to the work centers.

D.

An overall profile must be assigned in the checking control.

Full Access
Question # 22

How would you define pegging in the context of Advanced Planning?

A.

An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements

B.

An evaluation to identify overstock situations in the balance between the receipt and the issue elements after the production planning run

C.

An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements and stock

D.

An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run

Full Access
Question # 23

You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting, the customer decides to remodel an existing business process in accordance with clean core principles. Which of the following SAP Signavio solutions can be used for the remodeling?

A.

SAP Signavio Process Insights

B.

SAP Signavio Process Intelligence

C.

SAP Signavio Process Governance

D.

SAP Signavio Process Manager

Full Access
Question # 24

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

A.

Backflushing

B.

Kanban

C.

Material requirements planning

D.

Production order release

Full Access